Ground Improvement Resulting From Installation Of Drilled Displacement PilesBy Timothy C. Siegel
Drilled displacement piles (also known as augered cast-in-place displacement piles or augured, pressure grouted displacement piles) are installed by the displacement of soil and subsequent placement o
Jan 1, 2007
-
Ground Improvement by Dry Concrete ColumnsBy Tatiana Tronda
"The territory of Belarus is characterized by nonhomogeneous ground conditions. In some cases soft ground layers can reach tens of meters in depth. Application of piles and other conventional foundati
Jan 1, 2016
-
Present Developments In The Design Of Deep FoundationsBy Rolf Katzenbach
The principle questions related to the design of deep foundations especially in soft soils are the stability and the cost optimised settlement reduction to prevent possible damages and to minimise the
Jan 1, 2006
-
Ground Improvement for New Jersey Turnpike Interchange 14A: A Case StudyBy Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed
"Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons
Jan 1, 2017
-
Field Test of Braced Excavation Supported with Rows of Dry Deep Mixing ColumnsBy Stefan Larsson, Sadek Baker, Razvan Ignat
"This paper describes the execution of two full-scale field tests where a braced steel sheet pile wall interacting with rows of overlapping dry deep mixing columns was first excavated and then loaded
Jan 1, 2015
-
Oakland Airport Roadway Project - SynopsisBy David S. Yang
The construction of Oakland Airport Roadway Project for the airport expansion requires stabilization of subsurface soils for the construction of three grade separation structures at two roadway interc
Jan 1, 2001
-
Design And Construction Of A Cut-Off Wall In Warm PermafrostBy Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
The Construction And Performance Of Prestressed Ground Anchors In Soils And Weak Rocks: A Personal Overview - SummaryBy Donald A. Bruce
The paper reviews aspects of the construction and performance of prestressed ground anchors installed in soils and weak rocks. Attention is focused on good practice for drilling, tendon fabrication an
Jan 1, 1991
-
Integration of Landslide Slope Movement Data for Design of an Anchored Stabilization WallBy Paul J. Sabatini, Robert C. Bachus, Terence P. Holman, Panos Andonyadis
A recent landslide comprising approximately 12 acres (4.86 hectare) and a displaced volume of more than 500,000 cy (382,000 m3) caused the shutdown of a four-lane state highway and two high-capacity f
Jan 1, 2017
-
Outline and Execution Control System of Dry Jet Mixing (DJM) MethodBy Shigetoyo Yasui, Masahiro Saitou, Nobushige Yasuoka, Keisuke Tsujimoto
"The Dry Jet Mixing (DJM) Method was developed and has been put to practical use on the initiative of the Public Works Research Institute and Japan Construction Method and Machinery Research Institute
Jan 1, 2015
-
Deep Stabilisation in Sulphide Soil for Embankments in Sweden - Laboratory and Field StudiesBy Bo Westerberg, Mattias Andersson, Yvonne Rogbeck
"Deep stabilisation has been used in Sweden for decades. The method has been improved to allow it to be used in different types of soils and with new binders. One challenging soil type in Sweden is so
Jan 1, 2015
-
Deterministic Analysis for Liquefaction and its Mitigation by Suitable Foundation Type in BangladeshBy Arpit Parikh
"Ground Water or Pore water pressure development in Sandy Soil formation is Critical situation in foundation analysis and design.Moreover it become severe while associated with higher liquefaction pro
Jan 1, 2017
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field WorkBy Darrell L. Beddard
Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai
Jan 1, 1996
-
Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, IndiaBy Deepak B. Deshpande
This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site
Jan 1, 2002
-
Baum Station – A New Pile Driving and Drilling Navigation SystemBy Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura
"A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep
Jan 1, 2017
-
Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case HistoryBy Aly M. Mohammad
State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,
Jan 1, 2006
-
Structural Underpinning By PinpilesBy D. A. Bruce
Small diameter cast-in-place bored piles (pinpiles) have been installed throughout the world since 1952, but only more recently in the United States. The special features of their construction and per
Jan 1, 1992
-
Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)By Dennis Nottingham
"Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per
Jan 1, 2005
-
Session 19 "Compensation Grouting"By Douglas Heenan
The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time
Feb 10, 2003
-
Jobsite Safety Inspection ChecklistBy Sam Messina
[Project: Job Number: Date: Superintendent: Person Making Inspection: Note: The following checklist shall be used on a regular basis as an overall assessment of the jobsite. The checklist
Jan 1, 1998