    A History Of The Use Of ACIP Piles For Major Projects In Atlanta

    By Willie M. NeSmith

    In the Metropolitan Atlanta Area today, augered, cast-in-place (ACIP) piles will be considered on most projects where deep foundation support is required. ACIP piles were first used in Atlanta in the

    Jan 1, 2003

  • DFI
    Tension Tests On Driven Pipe Piles In Sand - Synopsis

    By Alan J. Lutenegger

    A series of tension tests were performed on prototype scale steel pipe piles at two sites to evaluate the influence of scale and pile plugging on the unit skin friction developed in axial tension. The

    Jan 1, 2000

  • DFI
    Inelastic Response Of Extended Pile Shafts In Laterally Spreading Ground During Earthquakes

    By Arash Khosravifar

    The seismic design of extended pile shafts for the combined effects of dynamic shaking and liquefaction-induced lateral spreading is investigated using nonlinear dynamic finite element analyses (NDA).

    Jan 1, 2010

  • DFI
    Piling In Coal Measures At The City Of Manchester Stadium For The Commonwealth Games 2002

    By Colin Curtis

    The City of Manchester is hosting the 2002 Commonwealth Games. A world class Stadium with a 38,000 capacity was commissioned for a site located close to the City Centre. The Stadium location is in an

    Jan 1, 2002

  • DFI
    Design Of Bored Piles In Chalk At The New Medway Crossing Based On Instrumented Load Tests

    By David J. Puller

    As part of the value engineering process on a major Design Build highway project, instrumented trial pile load tests were used to achieve savings in cost and time on the foundations for a major river

    Jan 1, 2002

  • DFI
    Mooring Bridge Caissons During Construction Using Jetted-In Driven Plate Anchors

    By Osama A. Safaqah

    Driven plate anchors can be used to hold in place large bridge caissons during floating construction. Their small size and simple method of installation make them a very cost effective alternative to

    Jan 1, 2013

  • DFI
    Ground Improvement For The Deep Foundation Of A 650 M Long Quay Wall In The Port Of Hamburg

    By Peter Arz

    In the port of Hamburg a 650 m long quay wall was completed in mid-1985. The watertight wall consists of loadbearing steel buttress piles PSP 1012 which are up to 28 m long and infill interlocking she

    Jan 1, 1987

  • DFI
    Errata (5268ac87-18a9-458e-b334-4f72060324e3)

    Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'

    Jan 1, 1994

  • DFI
    Soil Improvement Using Gravel-Sand Columns for a Highway Project in Germany

    By Schmitz Stefan, Stephan Jee-Sun

    "Due to the reunion of Western and Eastern Germany in the late 80’s, a multitude of infrastructure projects had to be executed. A good portion of these projects required improvement of the motorway sy

    Jan 1, 2015

  • DFI
    Augered Cast-In-Place And Continuous Flight Auger Pile Foundation Systems For US Highway Projects - Why ACIPICFA Pile Foundations?

    By Silas C. Nichols

    FHWA Interest is due to: ? An increase in successful projects in the U.S. private sector and in other countries ? Cost effective and more efficient in many circumstances ? Agency Prioritie

    Jan 1, 2005

  • DFI
    Laboratory Validation Of In-Situ Tests - 1. Introduction

    This paper summarizes seven years of Italian ex­perience with the use of large calibration chambers for the calibration, under closely controlled stress and strain conditions, of some in situ testing

    Jan 1, 1987

  • DFI
    Practice Of Arranging Drilling Piles In Subsiding Grounds

    By Vladimir M. Korolev

    The field studies conducted at the experimental-production sites allowed to develop the technology of arranging drilling piles in loess subsiding grounds over 25 m deep and over 250 mm in diameter, to

    Jan 1, 2002

  • DFI
    A Case Study In Hand-Dug Caissons ? Synopsis

    Caissons hand dug to a depth of about 100 feet were used to underpin three important structures at an industrial site in the State of Utah. The caisson shafts extended through 30 to 40 feet of coarse,

    Jan 1, 2010

  • DFI
    Skin Friction Of Excavated Piles In Weathered Granite - Synopsis

    By K. K. S. Ho

    In Hong Kong the design of excavated piles in weathered granite has conventionally been based on a rule-of-thumb which relates the allowable base bearing capacity to the SPT N value, with no allowance

    Jan 1, 1996

  • DFI
    Complex Shoring for Mixed-Use Site in U.S. Capital

    By Richard Guenther

    As available space in urban centers becomes more scarce, builders and developers are increasingly turning to vacant, existing structures to meet cities' growing needs. The developers of City Ridge Roa

    Feb 1, 2022

  • DFI
    Pile Foundations In Liquefiable Soils - A Case Study - Synopsis

    By R. K. M. Bhandari

    Geotechnical investigation for a LPG plant located in Assam state - an area of high seisimicty - revealed a layer of loose to medium silty sand susceptible to liquefaction at some depth below the fini

    Jan 1, 1996

  • DFI
    Rock Socket Piles In The Sherwood Sandstone Of Central Birmingham

    By L. J. Whitworth

    Five trial piles were constructed during the trial pile programme for the Birmingham International Convention Centre. In addition, trial piles have been tested on two other sites in central Birmingham

    Jan 1, 1989

  • DFI
    Innovative Methods Of Dealing With Contaminated Soils In Drilled Shafts - Synopsis

    By William F. Loftus

    When high capacity diameter pipe piles are driven open-ended into the underlying bedrock, the material gathered inside the pipe often must be excavated to allow concrete to be placed within, in a clea

    Jan 1, 1996

  • DFI
    Prevention Of Landslides With Rows Of Pressed-in Pipe Piles On Steep Slope

    By Takefumi Takuma, Masashi Nagano, Koji Kajino

    As part of the construction of a multi-span pre-stressed concrete girder bridge for Japan’s new high speed rail line, landslide preventive piles were installed on the flank of a steep slope. The rotar

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (66bbaadf-14f6-4860-86d8-a6149d09411b)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 1998