Lateral Behavior Of Post Grouted Drilled ShaftsBy Emad Farouz, Ehab S. Shatnawi, Charles Winter
The increasing demand for small deformations and high-capacity drilled shafts without enlarging drilled-shaft diameters has motivated the development and increased use of a base grouting (BG) techniqu
-
Design And Construction Of A Micropile Wall To Stabilize A Railway Embankment.By Jim Bruce
This paper presents details of a slope stabilization scheme built in late 2003 at a 16m-high railway embankment in southern Ontario, Canada. The owner, faced with continuing maintenance and safety iss
Jan 1, 2004
-
High Strain Testing Of Augered Cast Piles At Miami Fort Power StationBy C. Michael Morgano
Static tests are costly and time consuming, so they are not always the best answer [ ]
Jan 1, 2005
-
Installation Checklist For Driving Mega PilesBy Douglas L. Scaggs
Over the past several years, pile foundations have grown to meet the demands of larger and heavier structures. As the foundations have grown, so has the need for larger and more robust piles to carry
Jan 1, 2013
-
Presentation #5 - The High-Strain Dynamic Load Test (Drop Weight Test) - ContentsBy Frank Rausche
Why testing What tests can be done Dynamic load testing Loading device Measurements Analysis Examples
Jan 1, 2001
-
Studies On Pile Driving Cushion Materials ? SynopsisBy H. R. Shen
Cushion materials are one of the most important links in an efficient piling system. In the past, little has been done in China on this problem, so engineers are still used to those traditional woods,
Jan 1, 2010
-
Lateral Load Testing Of Pile FoundationsBy Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Installation And Testing Of 260 Hollow Core Bar MicropilesBy Jesús E. Gómez
A total of 260 micropiles were installed as part of a retrofit effort for two existing bridges. The micropiles consisted of hollow core bars installed under limited headroom conditions. Of the total n
Jan 1, 2007
-
Underpinning Of A 16th Century Cistercian Abbey FoundationBy Michel Bustamante
The original Cistercian Lure abbey situated in eastern France and built in the second half of the 16th century, has become nowadays an administrative building. Because it has been founded on poor grou
Jan 1, 2002
-
Broadway Viaduct Design Phase Load Test Program For Post Grouted ShaftsBy Mike Muchard
A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc
Jan 1, 2009
-
D?Appolonia - Recommended Specifications For The Design Of Foundations, Retaining Walls And Substructures - Final Report Prepared For National Cooperative Highway Research Program Transportation Research Board National Research Council - 4.5 Drvn Pls4.5.1 General The provisions of the article shall apply to the design of axially and laterally loaded driven piles in soil or extending through soil to rock. 4.5.1.1 APPLICATION (Revised Article
Jan 1, 1989
-
The Underwater Cut-Off At The Walter F. George DamBy Gianfranco Di Cicco
Seepage problems were recorded for more then 40 years at the Walter F. George lock and dam. In 2001 the Mobile district of The U.S. Army Corps of Engineers turned to the installation of a 200 feet dee
Jan 1, 2013
-
Recovery Efforts At The World Trade Center "Bathtub"By George J. Tamaro
In 1967 the Port Authority of New York and New Jersey undertook the construction of the World Trade Center (WTC) diaphragm walls, installation of the lateral support system and the excavation of the s
Jan 1, 2002
-
Design And Specification Considerations For Environmental Cutoff WallsBy Daniel Ruffing, Jeffrey Evans
Vertical cutoff, or barrier, walls are an integral part of environmental site remediation efforts. Vertical barriers are commonly deployed to limit the influx of clean ground water and/or to control t
-
Helical Piles With Grouted Shafts - A Case HistoryBy Shawn Downey
A helical pile with in-situ grouted shaft was used to underpin the existing slab of a large retail store in the Edmonton, Alberta Canada area. The existing structural slab did not have the capacity to
Jan 1, 2003
-
Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - SynopsisBy D. K. ] [Gupta
The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and
Jan 1, 1996
-
A Study Of Failure Mechanism And Uplifting Capacity Of Tension Pile Foundation ? SynopsisBy K. J. Yang
Based on investigations and model tests combined with pile foundation on Code compilation of drydocks, we present this report to give informations against uplift pressure of piles beneath floor of dry
Jan 1, 2010
-
Theory And Practice Of Pile Foundations ? SynopsisBy G. G. Meyerhof
The paper reviews the state of the art of estimating the bearing capacity and settlement of pile foundations in sand and clay soils, including the effects of pile installation, scale effects of pile s
Jan 1, 2010
-
Wick Drains into the unknownBy Brian McGlynn
There are many factors that can result in a site characterization being limited. For example, a client may undervalue the importance of a good geotechnical report, or an owner may feel that it would t
May 1, 2023
-
Depth Of Borings, Length Of Piles, Landslides, Erosion, And A Moose Hunt - A Case History Of A Comedy Of MistakesBy Bengt H. Fellenius
An upgrading and straightening of a highway included building a bridge across a small river. A routine site investigation was initiated to determine the conditions for designing the foundation of the