Bring Your A-game! The Benefits Of Advocating For Advanced Geotechnical Exploration MethodsBy Derrick Dasenbrock, Mary C. Nodine, Benjamin Rivers
Up to 50 percent of major infrastructure projects suffer impacts to schedule or cost due to geotechnical issues, many of which correspond to risks related directly or indirectly to the scope and quali
-
Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic RetrofitBy A. R. Dover
The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew
Jan 1, 2008
-
Dynamic Analysis Correlation Of Standard Penetration Resistances With The Adhesion Of Very Stiff To Hard Clays On Driven PilesBy Chris D. Thompson
In Southern Ontario, Canada, piles are frequently driven through competent clayey soils to obtain end bearing on extremely dense till or bedrock. One reason for this is the difficulty at assessing the
Jan 1, 2002
-
Adjacent Top-Loaded Bi-Directional Test And Conventional Bidirectional Load Test Results – Site IiBy Patrick J. Hannigan, Seth Robertson, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (―TLBT‖) and the conventional Bi-Directional Load Test (―BDLT‖) are full-scale static load test methods. In both methods, the test loads are applied bi-directionally
Oct 1, 2022
-
Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring SystemBy Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim
"In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality
Jan 1, 2005
-
Development of Environmental Double Pile (EDP) for Improvement of Contaminated Soft GroundBy Hyunsuk Yoon, Kiho Lee, Juhyng Lee, Younghoon Jung, Junboum Park
"The environmental double pile method is presented as a device to improve the engineering properties and to clean up contamination of low-permeability soil. This method is one of the novel technologie
Jan 1, 2005
-
Soil Damping In Saturated Sandy Soils For Determining Capacity Of Piles By Wave Equation AnalysisBy Mark R. Svinkin
This paper deals with application of the wave equation analysis to determine capacities of piles driven in saturated sandy soils. It shows that pile capacity in sandy soils changes with time after the
Jan 1, 1995
-
Determining Length Of Pile Foundation By Analyzing Response To Lateral Hammer ImpactBy Vivek Samu, Murthy Guddati
A new method called Effective Dispersion Analysis of Reflections (EDAR) was recently developed to effectively analyze the dispersive waves generated from lateral impact to piles. This paper presents t
-
Drilled Shaft Load Testing Program for Design of Foundations for an Automated People MoverBy Samer Rabab’ah, John C. Niedzielski, Jason Valeria
The PHX Sky Train is an automated people mover system located at Phoenix Sky Harbor International Airport. Phase II of the PHX Sky Train includes the design of over 150 drilled shafts for support of f
Jan 1, 2019
-
Determination Of Pile Damage In Concrete PilesBy Gerald E. H. Verbeek
As the number of driven concrete piles with Embedded Data Collectors increases, it has become possible to compare the widely used Beta Method to assess pile damage (using the change of pile impedance)
Jan 1, 2011
-
Engineering The Mansion's HeritageBy Ken MacLeod
A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi
Jan 1, 2006
-
Thermal Integrity Profiling Of Drilled ShaftsBy Gray Mullins
The construction of drilled shafts as well as other cast in place foundation alternatives relies heavily on good practices from the contractor, engineer, and inspector in order to produce a quality fo
Jan 1, 2010
-
A Review Low Strain Integrity Testing Practices In India And Complexities Involved In Evaluation Of Test ResultsBy RavikiranVaidya, Vishal Dhamecha
Low Strain Pile Integrity Testing has been used in India since 1990’s and several have tried to demonstrate the utility and benefits of this method. However, use of this technology was limited till 19
Sep 1, 2022
-
Sonic Drilling and Sensitive InfrastructureBy George Burnhart
"Sonic drilling is a relatively new technology even though it has been in development since the late 1940s. It was initially funded by the U.S. petroleum industry and then, in the late 40s, Russian sc
Jan 1, 2008
-
Improvement Of Toe Resistance Of Drilled Shaft Foundations Using Smart CellsBy Mario A. Terceros Herrera, Mario Terceros Arce, Antonio Marinucci
A Smart Cell is a closed-type tip post-grouting device that is attached to the bottom of the steel reinforcement cage of a drilled shaft and is used to enhance performance and to reduce uncertainty th
-
Recommendations For Implementing And Interpreting NonDestructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.By Jose L. Garcia
The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra
Jan 1, 2006
-
Deep Excavation Support – Shangri-La – TorontoBy Brian Isherwood, Tara Brown, Paul Kreycir, Jenny Earle
"The Shangri-La hotel and luxury condominium tower, recently opened on University Avenue in downtown Toronto, required eight levels of underground structure, four extending into the shale bedrock.Ishe
Jan 1, 2015
-
Full-Scale Field Investigations & Numerical Analyses of Innovative Seismic Composite Fiber Reinforced Polymer and Reinforced Grouted Helical Screw Instrumented Piles Under Axial & Lateral Monotonic & Cyclic LoadingsBy M. Hesham El Naggar, Yasser Abdelghany
"ABSTRACT: The axial and lateral monotonic and cyclic behavior of helical pile foundations was investigated and new innovative helical screw systems suitable for seismic loadings were developed and pa
Jan 1, 2014
-
Diaphragm Walls And Barrettes For Top-Down Construction: A Project ReportBy Bjöm Böhle
Top-down construction (or cut and cover construction) is providing important advantages when comparing with conventional construction techniques for commercial developments with deep basements, underg
Jan 1, 2006
-
The Advantage Of Measurement While Drilling (Mwd) For Geotechnical Site CharacterizationBy Anahita Modiriasari, Benjamin S. Rivers
Measurement while drilling (MWD) is a subsurface exploration technique associated with real-time and continuous monitoring and recording of drilling data during the drilling process. This technique ca
Oct 1, 2022