"Underpinning By Jet Grouting" - SummaryBy George K. Burke
Underpinning of a structure has been traditionally expensive, time consuming, and, in many cases, caused as much settlement to the existing structure as it was trying to prevent. As underpinning is no
Jan 1, 1991
-
Experiences With A New Type Of Displacement Screw Pile - SynopsisBy William Van Impe
A most renewing and promissing soil displacement screw pile is called the O-pile. The O-screw pile is a soil displacement auger pile based on a screwing in - screwing out procedure. The displacement a
Jan 1, 1996
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River GorgeBy Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
Using Seismic Tomography To Evaluate Foundation StructuresBy Ed Kase
Cross-hole sonic logging (CSL) has become the universal standard, nondestructive testing (NDT) method used in evaluating the integrity of foundation structures to maintain quality assurance and qualit
Jan 1, 2003
-
Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part OneBy Christian Divis
[ ]
Jan 1, 2002
-
Ground Freezing for Groundwater Cutoff at the Seattle Seawall Replacement ProjectBy Brenton Cook, Daniel Mageau, Larry Applegate, Aaron McCain
"Ground freezing was successfully used to create an impermeable barrier wall along 3,000 feet of the downtown Seattle waterfront as part of the Seattle Seawall Replacement Project. This $360 million r
Jan 1, 2016
-
The Innovative CSM - Cutter Soil Mixing System for Constructing Retaining Walls and Cut-off WallsBy Erwin Stötzer, Renato Fiorotto, Wolfgang G. Brunner, Manfred Schöpf
"Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yie ld unsatisfa
Jan 1, 2005
-
Completely Automatized Recognition of the Installation Process in Special Foundation ConstructionBy Christian Hoyme, Jochen Maurer, Hans Regler
Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be
Sep 8, 2021
-
Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary DisplacementBy Lewis Stansfield
A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie
Jan 1, 2000
-
A Quality Control System For Augered Cast-In-Place Pile InstallationBy George G. Goble
The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very
Jan 1, 1997
-
Analyzing Drivability Of Open Ended Piles In Very Dense SandsBy James A. Schneider
The successful installation of long piles driven into very dense sands relies on the occurrence of the reduction in local friction with increased pile embedment, a phenomenon known as ?friction fatigu
Jan 1, 2010
-
The Design of Partial Depth Cement Deep Mixing (CDM) Foundation for an Immersed TunnelBy J. S. Lee, R. K. Massarsch
"A 3.2 km long immersed road tunnel forms part of the Busan-Geoje Fixed Link in South Korea, which connects Korea's second largest city Busan, with the island of Geoje. To ensure the water tightness o
Jan 1, 2015
-
Inclusion of Overburden Soils Resistance into Shaft Nominal Capacity for Significant Economic Savings – An Osterberg Cell Load Test Case StudyBy Aditya Ayithi, William G. Ryan, Dean Herbst
"For rock socketed drilled shafts, it is a common practice not to include the frictional resistance of overburden soils into the nominal capacity estimation. The primary reason often being cited is “o
Jan 1, 2016
-
Innovative Deep Foundation Support Using Ductile Iron PilesBy Thomas Billups, Brendan FitzPatrick, Doug LeDo, David Carchedi
"Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical analysis and design. These challenges often include working on site
Jan 1, 2016
-
The Choice between HSDT and RLT: Selection Criteria for Concrete Pile TestingBy P. Middendorp, Gerald E. H. Verbeek
"INTRODUCTIONStatic Load Testing (SLT) is generally considered the pile testing method that provides the de-facto answers regarding pile capacity and load-deflection behavior. However, as this testing
Jan 1, 2006
-
30 Hudson Street Foundation Design and Construction in Variable RockBy Joel Moskowitz, George J. Tamaro
"A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s
Jan 1, 2004
-
Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit LimestoneBy Jim Glider, Noah Miner
The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio
Sep 8, 2021
-
Application of Triple-Axial CDM Method (Lemni 2/3 Method) for Stabilizing Soft SoilBy Kazuyoshi Kamimura, Masaya Kawata
"It has been 30 years since the cement deep mixing (CDM) method developed in Japan. CDM method has been applied to many structures. While various technical improvements have been implemented in the me
Jan 1, 2015
-
Foundation in Simsima Lime Stone for an Underground ReservoirBy Chandramohan P. V., Ravi Kishore
"An underground reservoir was to be constructed at Doha in Qatar. Simsima lime stone is present at the bottom. When the reservoir is empty, there will be uplift at the bottom but this will change to d
Jan 1, 2017
-
Piling Problems - IntroductionBy D. Millgard
Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.
Jan 1, 1991