Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design and Construction of the Summit Senior Care Facility into the Side of an Unstable California HillsideBy Patrick O. Shires, Harry W. Schnabel
With stable building sites becoming scarce in the greater San Francisco Bay Area, the new Summit Senior Care Facility is being built into the side of an unstable hillside adjacent to the San Ramon Reg
Jan 1, 2018
-
Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall BuildingBy Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros
"This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p
Jan 1, 2016
-
Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling TechniquesBy Huw Williams
"Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi
Jan 1, 2005
-
In-Situ Study On Improvement Of Soft Ground Using Stone Columns For Railway EmbankmentBy Kishore Kumar B., Eswaran Prasad C R, Srini Naik B., Ramakrishna Raju N
The authors through this paper intend to introduce the non-vibro technique of ground improvement by stone column, being used for the first time in India under the Western Dedicated freight Corridor in
Nov 1, 2022
-
An Alternative Lower Carbon Footprint Foundation For A Large Oil Gas Project In Jurong Island, SingaporeBy Selvaganesh Selvaraju, Deepak Raj, Sandun N. Wimalasena
One of the world leading oil majors is carrying out a multi-billion-dollar expansion of its integrated manufacturing complex in Jurong Island, Singapore, the global oil trading and refining hub. Soil
May 1, 2022
-
Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case HistoryBy Raffaella Granata, Daniele Vanni
"This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o
Jan 1, 2016
-
Bertha Rescue Shaft – SR99 TunnelBy Lance Rasband, Richard Hanke
"Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the
Jan 1, 2015
-
Development of New Shaft Resistance Models for Piles Driven in the Puget Sound LowlandsBy Armin W. Stuedlein, Youssef Bougataya
Early stage design of driven piles primarily relies on static analysis based on one or a combination of total and effective stress approaches, the latter known as the method to estimate axial capaci
Jan 1, 2018
-
Deep Mixing Column Group Reinforcement by a Shallow Mixing Layer bBeneath an EmbankmentBy Tomohide Takeyama, Binh T. T. Nguyen, Masaki Kitazume
"Deep mixing columns are widely used to support embankments constructed on soft ground area. Researches on the stability of deep mixing columns were done by some authors when the columns do not simult
Jan 1, 2015
-
Nailed It! The Great Wall of the Chinese EmbassyBy Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Technical Note - Simplified Settlement Model For A Shallow Foundation On Composite Ground With Rigid PilesBy Timothy C. Siegel
A piled raft refers to a shallow foundation that is structurally connected to the piles, while composite ground refers to a soil-pile matrix where the piles are not structurally connected. The design
Jan 1, 2011
-
Noise Attenuation and Reduced Risk Associated With New Double- Walled Pile TechnologyBy Julie H. N. Hampden, Per G. Reinhall
"Executive summary: Impact pile driving of steel piles is a common construction practice in freshwater and marine environments for the building of structures and foundations. This practice produces ex
Jan 1, 2017
-
2017 OPA WINNER - Tri-Pod Suction Buckets for Offshore Wind Turbine FoundationBy Tae Hwan Lee, Jun-Shin Lee, Daejin Kwag, Sangchul Bang, Gerard T. Houlahan, Moo Sung Ryu
"Geotechnical engineers have been installing innovative, permanent underwater foundation systems utilizing suction buckets for the offshore industry since the early 1980s (Senpere and Auvergne, 1982).
Jan 1, 2017
-
Tri-Pod Suction Buckets for Offshore Wind Turbine FoundationBy Tae Hwan Lee, Jun-Shin Lee, Daejin Kwag, Sangchul Bang, Gerard T. Houlahan, Moo Sung Ryu
"Geotechnical engineers have been installing innovative, permanent underwater foundation systems utilizing suction buckets for the offshore industry since the early 1980s (Senpere and Auvergne, 1982).
Jan 1, 2017
-
Systematic Evaluation of Driving Criteria and Performance of Tapered Piles in Glacial SandBy Terrence M. Carroll, Chu E. Ho, Dimitrios Niarchos
"Construction of the new extension to Terminal 4 at John F Kennedy International Airport in Queens, New York involved the application of tapered piles for foundation support. Initial design based on p
Jan 1, 2017
-
Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole InspectionBy Sastry Putcha, Santosh Mummaneni, Avasarala Swamy
"Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that
Jan 1, 1900
-
Ductile Iron Pile Foundation Solution for Interior Retrofit ProjectsBy Keithe J. Merl, Brendan FitzPatrick, Gregg Piazza
Urban and industrial construction projects commonly involve interior work within buildings, warehouses and manufacturing facilities. Renovations of these existing structures must address both structur
Jan 1, 2019
-
Performance of Open-Ended Pipe Piles in Cretaceous Soils of BaltimoreBy Sanjeev Malhotra
"This paper presents the results of a pile installation monitoring and performance assessment program for pile foundations supporting 14 piers and 2 abutments of the 1700-ft long bridge crossing over
Jan 1, 2005
-
Dealing with Complexities Associated with the Application of Bored Pile Retaining Walls in Urban DevelopmentsBy Abid Adekunte
"Engineers and developers have witnessed the growing popularity of deep basement structures as components of urban commercial and residential developments. This is often attributed to inadequate surfa
Jan 1, 2017
-
Analytical and Field Estimates of Shaft Resistance in Socketed Piles: Bandra-Worli Sea Link, MumbaiBy Sunil S. Basarkar, Dilip M. Dewaikar, Rajesh H. Gajjar
"A load transfer program AXPILE was developed for simulation of the loadmovement characteristics of socketed piles of the Mumbai reg ion. This program used empirical relationships for ultimate shaft r
Jan 1, 2005