    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • DFI
    D-Wall Extreme – Contrast Between Going Deep And Getting Small

    By Alexander Blatt, Franz-Werner Gerressen

    Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep groundwater barriers, named Cut-Off-

    May 1, 2022

  • DFI
    Real Time Monitoring Of Utility Vaults during Reconstruction of the Elliot Bay Seawall

    By Pierre Gouvin

    "This paper discusses real time monitoring of utility vaults during the reconstruction of the Elliot Bay Seawall in Seattle. The project, undertaken because deterioration of the old wall posed increas

    Jan 1, 2017

  • DFI
    Piling Practice in Sedimentary Granular Soils of Santa Cruz, Bolivia

    By Mario Terceros H, Bengt H. Fellenius

    "ABSTRACTThe city of Santa Cruz, Bolivia, is historically dominated by houses and three to five storey buildings.The geology in and around the city is such that even very light buildings need to be su

    Jan 1, 2014

  • DFI
    Bearing Capacity Of Nodular Piles

    By S. Kanai

    Nodular piles is to be piles provided with several nodular projections along the pile shaft, as shown in Fig. 1. Nodular piles are usually installed through either driving method with hammer or prebor

    Jan 1, 1989

  • DFI
    Design And Performance Evaluation Of Bored Piles In Sand

    By Ashutosh S. Dhar

    Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in

    Jan 1, 2006

  • DFI
    A Novel Approach to Incorporate Shear-Moment Coupling Effects in Foundation Stiffness for Caisson Piles for Izmit Bay Bridge in Turkey

    By Arash Khosravifar, Amalia Giannakou

    "Nonlinear foundation springs for bridge caisson foundations show significant coupling between the shear force and bending moment. Implementing foundation stiffness matrix with coupling effects (off-d

    Jan 1, 2017

  • DFI
    LRFD Resistance Factors for Design of Driven Piles Using the Texas Cone Penetration (TCP) Test

    By Rozbeh Moghaddam, William D. Lawson, Priyantha W. Jayawickrama, Hoyoung Seo, James G. Surles

    "This study provides calibration of resistance factors (?) for design of driven piles to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetration (TCP) Te

    Jan 1, 2017

  • DFI
    Development Of Design Charts For Sand Compaction Pile Method Of Improvement For Loose To Medium Dense Sands

    By N. Aarthi, G. R. Dodagoudar

    The improvement of soft clay deposits using stone columns is a well-established ground improvement technique in the western world. This technique has been well documented and has proper design codes f

    Nov 1, 2022

  • DFI
    Response Of A Pile In Soft Clay Under One-Way Cyclic Lateral Loading

    By Padmavathi V. Sagi

    In this paper, effect of cyclic loading on the behavior of a long, flexible, unrestrained vertical pile loaded laterally in soft clay is examined. For cyclic loading, the analysis is carried out usin

    Jan 1, 2006

  • DFI
    New Concepts For CFA (Auger Cast) Pile Controle - Synopsis

    By Shachar Magali

    This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique

    Jan 1, 2000

  • DFI
    Laterally Loaded Caissons for Ontario College of Art & Design

    By William F. Starke

    "The Ontario College of Art & Design (OCAD) located in Toronto, Ontario, found itself in dire need of space due to increased enrollment, leading them to embark on a major expansion and redevelopment o

    Jan 1, 2004

  • DFI
    Kosciuszko Bridge Main Pylon Deep Foundation Solution

    By A. Daugiala, D. Coleman

    In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E

    Jan 1, 2016

  • DFI
    Small Diameter Piling System Used In Australia

    By P. J. Yttrup

    Small diameter timber piles are used in Australia to solve foundation problems in soft or filled ground and expansive soil. The paper describes the results of pile load tests to develop simple methods

    Jan 1, 1989

  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008

  • DFI
    Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis

    By Robert Jakiel

    The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange

    Jan 1, 2000

  • DFI
    An Overview Of Soil Mixing In The United States ? Introduction

    By Peter J. Nicholson

    Since the reintroduction of soil mixing to the United States over 10 years ago, the work installed by soil mixing technology has grown dramatically. From an annual turnover of less than ten million do

    Jan 1, 2001

  • DFI
    Advances in Desaturation of Sandy Soil to Mitigate the Liquefaction Hazard

    By Dhanaji S. Chavan, Thallak G. Sitharam

    "It is well known that sites comprising of saturated loose sand undergoes large deformations, due to liquefaction, during seismic shaking. To cope with this, different mitigation techniques such as vi

    Jan 1, 2017

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    Capitol Complex Phase 1 Expansion

    By Eric S. Lindquist, Charles A. Luxford

    The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par