Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Drilled Piers In The Piedmont - Introduction

    By Stanley A. Schwartz

    In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The

    Jan 1, 1988

  • DFI
    Ground Water Control In The Urban Environment - Introduction

    By Robert G. Lenz

    Control of ground water for construction purposes is an everyday occurrence in the U.S. Thousands of pumps are in service at any given time. Most of these applications simply consist of pumping water

    Jan 1, 1988

  • DFI
    Session 16 "Deep Mixing Method IV"

    By Mary Ellen Bruce

    Let me first address the issue of the wet grab samples. The wet grab samples that were attempted to take on the Central Artery were hindered by the fact that the way the mixing was being done was only

    Feb 10, 2003

  • DFI
    Deep Stabilisation in Sulphide Soil for Embankments in Sweden - Laboratory and Field Studies

    By Bo Westerberg, Mattias Andersson, Yvonne Rogbeck

    "Deep stabilisation has been used in Sweden for decades. The method has been improved to allow it to be used in different types of soils and with new binders. One challenging soil type in Sweden is so

    Jan 1, 2015

  • DFI
    Upgrading of the Equipment on CDM Vessels to Accommodate Water Depth and Environmental Considerations

    By Takashi Enomoto

    "The cement deep mixing (CDM) method has a wide range of applications, both on land and at sea. This paper describes the features of the equipment on CDM vessels engaged in maritime construction in Ja

    Jan 1, 2015

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike Rehabilitation

    By Michael Arnold

    "BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d

    Jan 1, 2015

  • DFI
    Comparison of Non-Destructive Integrity Tests on Experimental Drilled Shafts

    By Armin W. Stuedlein, Jim Zammataro, Bernie Hertlein, Daniel Belardo, Qiang Li, Antonio Marinucci

    "An experimental program focusing on four drilled shafts was conducted to determine the effect of high strength steel reinforcement bars on lateral resistance, steel casing on axial and lateral resist

    Jan 1, 2016

  • DFI
    Anchored Pile Foundations In British Columbia

    By Cory J. E. Yacyshyn

    Anchored steel pipe piles are being used more frequently in British Columbia for shoreline projects such as public ferries, cruise ship docks, containership terminals and locally in the expansion of t

    Jan 1, 2004

  • DFI
    Numerical Analysis of CFA Piles for High-Rise Building of Administrative Centre Lakeside Park in Bratislava

    By J. Stacho, Frankovská. J.

    "Abstract The use of continuous flight auger (CFA) piles in Slovakia has increased significantly in recent decades. High-rise building of administrative centre Lakeside Park in Bratislava is based on

    Jan 1, 2014

  • DFI
    Influence of Different Parameters on the Behavior of Laterally Loaded Piles in Sand

    By Musbah A. Hasan, Ahmed M. Nasr, Fauzi Jarushi

    Many transmission towers, high-rise buildings and bridges are supported by piles. These structures may be subjected to large lateral loads. Therefore, experimental investigations on model piles under

    Jan 1, 2017

  • DFI
    Improvement Of Toe Resistance Of Drilled Shaft Foundations Using Smart Cells

    By Mario A. Terceros Herrera, Mario Terceros Arce, Antonio Marinucci

    A Smart Cell is a closed-type tip post-grouting device that is attached to the bottom of the steel reinforcement cage of a drilled shaft and is used to enhance performance and to reduce uncertainty th

  • DFI
    On Driven Piles In Coralline Deposits: A Selected Case From The Red Sea Coast Of Saudu Arabia

    By Waddah Akili

    At an offshore site along the Red Sea coast of Saudi Arabia, marine structures were supported on tubular steel piles driven into coral and coral contaminated sands and silts. Surprises and disappointm

  • DFI
    Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, Malaysia

    By Vijayakumar Viramuthu, Martin Heinrich

    Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas T

    May 1, 2022

  • DFI
    Application of Non-Destructive Testing to Drilled Shafts

    Technically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde

    Jan 1, 2004

  • DFI
    Standard Testing Method for Deflection Characteristics of Pile Driving Cushion Material

    By David M. Rempe

    The purpose of this standard is to provide a method for testing of cushion materials that leads to uniform results when employed by various organizations and laboratories. The load-deflection charact

    Dec 1, 1984

  • DFI
    Advancing Severe Flood-Related Engineering Knowledge

    By Anne Lemnitzer

    When a major storm system stalled over Western Europe last summer, it pro- duced the deadliest flood on European territory in the last two decades. Beyond record-setting rainfall over countries such

    Feb 1, 2022

  • DFI
    The Effects Of Heating And Cooling Energy Piles Under Working Load At Lambeth College, UK

    By Tony Amis

    There is very limited information relating to the potential impact of temperature cycles, outside the variation that occurs naturally, on the behaviour of foundation piles. Such thermal loading occurs

    Jan 1, 2008

  • DFI
    Performance Of Drilled Displacement Piles In The Midwestern United States

    By W. Morgan NeSmith

    Drilled displacement (DD) piles often develop significantly larger unit shaft resistance values than other drilled or augered pile systems in coarse grained materials. Minimal vibration and limited sp

    Jan 1, 2009

  • DFI
    Anchoring Tall Buildings In Lower Manhattan

    By Andrew Pontecorvo

    The design of foundations for the tall buildings of lower Manhattan rely on the use of high capacity, rock anchors to resist overturning forces generated by lateral loads from wind, earth, water and,

    Jan 1, 2011