Experiences With Heavy Drop Hammer Testing Of Rock-Socketed ShaftsBy Frank Rausche
Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust
Jan 1, 2006
-
Is the use of Residual Strength Justified in Excavation Support Design?By George Aristorenas, Carlos Englert, Jesús Gómez
"Laboratory test data of strain softening soils exhibit the development of a maximum (peak) shear strength followed by a decrease in the strength with continued straining. The rate of strength loss de
Jan 1, 2015
-
Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design ParametersBy Martin D. Larisch
The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.
Nov 1, 2022
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
-
-
Augered Cast-In-Place Pile Manual (Model Specification with Commentary)"Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst
Jan 1, 2016
-
Consultants Can Be Safe, Too – A Collaborative ApproachBy Brian FitzPatrick, Michael J. Weaver
Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration
Jan 1, 2019
-
Summary of Main Standards and Guidelines on Grouting Available in North America and EuropeBy R. B. King
This document was prepared by the DFI International Grouting Committee with the intent to provide a summary of main Standards and Guidelines available for the North America and Europe grouting industr
Jan 1, 2021
-
Innovative Crosshole Sonic Logging Testing Drilled ShaftsBy Joshua C. Adams, Les Chernauskas, Edward L. Hajduk
"Drilled shafts are increasingly being used to support bridge and building foundations. Because these foundations usually carry very high design loads and often serve as non-redundant, single load car
Jan 1, 2009
-
Constructability Of Tiedback Wall Systems - I. IntroductionBy Thomas C. Anderson
Tiedback walls are now recognized and accepted as a good solution for a variety of structural problems: ? Retaining Walls and Bridge Abutments in cut situations ? Landslide stabilization ? Rep
Jan 1, 1991
-
Quality Control of Production Pile Installations for US-90 Replacement Bridge Over St. Louis BayBy Kevin Kuhl
With the destruction of the US-90 Bridge spanning St. Louis Bay by Hurricane Katrina, the State of Mississippi awarded its first major design-build contract in order to have a completed four-lane brid
May 11, 2007
-
Case Histories of Arch Action Low Improvement Ratio Cement Column Method (ALiCC Method)By Jun Ohbayashi, Yoshiyuki Yagiura, Hiroaki Miyatake, Masuo Kondoh, Naotoshi Shinkawa
"Reducing the improvement ratio of ground improvement is an extremely efficient way to reduce the construction cost and construction period of mitigation measures for soft ground. The Arch Action Low
Jan 1, 2015
-
Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current PracticeBy Jim Slatter, Ben Collingwood
"It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali
Jan 1, 1900
-
The Use of Shape Accel Arrays (SAAS) for Measuring Retaining Wall DeflectionBy Paul Thurlow, Richard K. Lipscombe
The measurement of deflection of designed diaphragm walls is critical for near real time information to assess wall and soil behaviour as the internal area is excavated in a controlled manner. Data en
Jan 1, 2017
-
Guidelines for Soil Mixing"1.0 INTRODUCTIONThese Guidelines reflect the state-of-the-practice of the Deep Mixing Method (DMM) in North America. DMM is an in situ mixing process that breaks down the soil structure; injects bind
Jan 1, 2016
-
Comparison of 2D and 3D Anchor Analysis MethodologiesBy Ruth McKeown, Gilson de F. N. Gitirana, Murray Fredlund, HaiHua Lu
The current design standards for the use of anchors in slopes is based on two-dimensional (2D) limit equilibrium analyses. Anchors are considered as discrete loads and the 2D anchor, factored based on
Jan 1, 2019
-
-
The Use of Controlled Modulus Column (CMC) Ground Improvement for Support of Large WarehousesBy Brandon T. Buschmeier, Sonia S. Swift, Michael P. Walker, Frederic Masse
"Ground improvement has undoubtedly become a cost-efficient and effective solution to support the development of poor soil sites. Ground improvement elements, such as Controlled Modulus Columns (CMCs)
Jan 1, 2017
-
Seismic Response of Raft Foundations Supported on Aggregate Piers (f3188351-761b-458f-b00c-1bcc1cb9cf93)By Alper Turan, Hesham El Naggar
"The use of aggregate pier foundation systems has become widespread as the engineering practice moves towards cost-effective ground improvement solutions that provide accelerated construction schedule
Jan 1, 2017