Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016

  • DFI
    Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)

    By Ed Revoort, Robert Schippers

    In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h

    May 1, 2022

  • DFI
    Novel Methods Of Restraining Embedded Retaining Walls

    By Abid Adekunte

    Traditionally, designers and contractors provide additional external supports to retaining walls through the use of tie-back anchors or braces. Both approaches are known to have their shortcomings; br

    Jan 1, 2010

  • DFI
    Role of Probabilistic Methods in Sustainable Geotechnical Levee Integrity Analysis

    By Juan M. Pestana-Nascimento, Robert G. Bea, Hamed Hamedifar, Emery M. Roe

    The current State-of-the-Practice is grounded heavily on deterministic characterization and assessment of the performance of civil engineering infrastructure. In particular, flood defense systems, suc

    Jan 1, 2017

  • DFI
    The Effects of Cylindrical Pile Insertion on the Vertical Stiffness and Strength of the Surrounding Soil

    By Emre Biringen

    "Results from a small-scale laboratory experimental program show the changes in the vertical stiffness and strength of a soft clayey soil adjacent to the shaft of an inserted pile (i.e. expansion of a

    Jan 1, 2005

  • DFI
    Field Test Verification Of Ground Bearing Pressure Under Rig Tracks And Implications For Working Platform Design

    By Steffen Schweizer, Tadeusz Brzozowski, Alfred Koller, Michał Topolnicki, Jürgen Wäger, Grzegorz Sołtys

    A full scale test has been conducted to determine ground bearing pressure under rig tracks. The track loads were recorded in real time using Liebherr's Ground Pressure Visualisation system, and the ve

    May 1, 2022

  • DFI
    Piling In Calcareous Red Bed Soils and Weak Rock Formation – Design Development for a Gas Processing Facility

    By Rick Piovesan, Pramod Rao, Nihal Bohra, Mark Wahler

    "This paper discusses the approach followed for the geotechnical design of 355 mm and 457 mm diameter driven open-ended steel pipe piles used for a gas plant at a green field site in Pilbara region in

    Jan 1, 2015

  • DFI
    Alternative Deep Basement Solutions for Built- Up Areas

    By Abid Adekunte

    "In recent years, developers have had to deal with complexities associated with numerous cases of deep basement construction in built-up areas. Design and construction of deep excavation support syste

    Jan 1, 2015

  • DFI
    Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A Ramp

    By Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das

    Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r

    Sep 1, 2022

  • DFI
    Rehabilitation of U.S. 70 Bridge over Lake Hamilton

    By Ryan P. Sullivan, G. Alan Klevens, Jian Huang

    "BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91

    Jan 1, 2007

  • DFI
    Rehabilitation of U.S. 70 Bridge over Lake Hamilton (de2c0766-552c-4812-a9ab-394a9bebc445)

    By Ryan P. Sullivan, G. Alan Klevens, Jian Huang

    "BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91

    Jan 1, 2007

  • DFI
    High Capacity Drilled Piles in Brooklyn

    By Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe

    "The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount

    Jan 1, 2016

  • DFI
    Building Drilled Shafts to Bridge the Mississippi

    By Brian Koch

    Michels installed 242 drilled shafts to support the piers for a new basket-handle, true-arch twin bridge across the Mississippi River from Moline, IL to Bettendorf, IA. The installation of the drilled

    Jan 1, 2019

  • DFI
    Determination Of Pile Spring In Stratified Layers

    By Sandeep Pattnaik

    Spring stiffness of soil and rock at different depth is often required for a pile structural model. If the pile is rested in multiple layers of soil, then it is rather more complex to simulate the soi

    Nov 1, 2022

  • DFI
    Rehabilitation of an Existing Mechanically Stabilized Earth Wall Using Soil Nails

    By Daniel A. Thome, Robert C. Janke

    "Installation of permanent soil nails through distressed mechanically stabilized earth retaining walls is a cost effective and aesthetically pleasing solution when using the appropriate equipment and

    Jan 1, 2005

  • DFI
    Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro Station

    By Babak Mamaqani, Pirooz Barar

    Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th

    Jan 1, 2019

  • DFI
    Meadowlands Megaproject: 9,000 Piles and Counting

    By Ronald D. Boyer

    "Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,

    Jan 1, 2009

  • DFI
    Electronic Instrumentation in Support of Installation of Special Foundation Projects as Part of the Digital Future - Ensuring Safe Production and Improving Quality Control

    By Franz-Werner Gerressen

    New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical su

    Jan 1, 2019

  • DFI
    A Case Study, Design Change from Spread Footing to Drilled Shafts

    By Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal

    "This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi

    Jan 1, 2016

  • DFI
    Deep Excavation with Well Point Dewatering in Soft Soil

    By Mihir B. Roy

    "Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of

    Jan 1, 2015