Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Lateral Stresses On Multilevel Tieback Walls

    By Liiban A. Affi

    The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also

    Jan 1, 2010

  • DFI
    Treatment of Soft Clays by Combined Encased Stone Columns and Vacuum Consolidation

    By Ganesh Kumar S.

    "Soil reinforcement using stone columns is one of the well-developed ground improvement techniques for soft clay deposits. The load carrying capacity can be further improved by encasing it with geosyn

    Jan 1, 2017

  • DFI
    Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical Soil

    By Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa

    "Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating

    Jan 1, 2014

  • DFI
    Innovative Methods for Underground Parking in Central Cities

    By Qi Wang, Zengzhu Kang, Jianguo Liu, Guanglei Liu

    "Due to the increase of automotive vehicles, available parking spaces become a new type of limited resource in central cities of China, especially in those old districts without visionary urban planni

    Jan 1, 2017

  • DFI
    PSC Piles Overcome Challenges for $650m Power Plant

    By Tim Siegel, III Fondren, Billy Camp

    "INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic

    Jan 1, 2004

  • DFI
    Session 17 "Grout for Enhancement of Piles and Piers"

    By Dennis Wrixon

    It was a little bit exceeded. The decision was the uniform settlement is measured at each one corner and the highest one corner is the important one. And in addition there is a differential settlement

    Feb 10, 2003

  • DFI
    TECHNICAL NOTE: Direct Solution of the Brinch-Hansen 90% Pile Ultimate Failure Load

    By Don W. Dotson

    In 1962, Kondner prepared several papers dealing with hyperbolic stress-strain response of cohesive soils. The following year, Brinch Hansen proposed 80% and 90% failure criteria for stress-strain be

    Aug 1, 2013

  • DFI
    Construction of Jacking Pits in Boston’s Central Artery/Tunnel Project

    By Arturo Ressi di Cervia

    "The Construction of the Thrust Pits for Jacking of the I-90 Tunnel for the Central Artery/Tunnel Project (Part of Contract No. C09A4) in Boston MA was nominated for DFI’s 2002 Outstanding Project Awa

    Jan 3, 2003

  • DFI
    SFMOMA Expansion – Multiple Uses of Ground Improvement – A Case Study

    By Scott A. Walker, Frank L. Rollo

    "The San Francisco Museum of Modern Art (SFMOMA) in downtown metropolitan San Francisco, California, is supported on a mat foundation. Although the mat foundation of the original museum was designed t

    Jan 1, 2014

  • DFI
    DFI Model Piledriving Contractor Proposal

    With respect to liability damages, claims and costs thereof relating to or ansmg out of contamination, special or non-special wastes, hazardous wastes or pollution in connection with the performance o

  • DFI
    Comparison Of Large Plate Load Test Result With Predicted Deformation In Deep Vibro Techniques Treated Ground For Iron Ore Stockpile Yard In Vietnam

    By Leong, William. Chong, Kam Weng

    Deep Vibro Techniques namely Vibro Compaction (VC) and Vibro Replacement (VR) are widely used in ground improvement to densify sands and strengthen cohesive soils. This paper describes the application

    Nov 1, 2022

  • DFI
    Session 27 "Grouted Cutoffs"

    By Trent Dreese

    For critical velocities in gravel units we use Bush-Luckner, Sichardt, other empirical equations, and equations derived from laboratory experiments too. On the base of these, we compiled critical velo

    Feb 10, 2003

  • DFI
    Real Time Monitoring Of Utility Vaults during Reconstruction of the Elliot Bay Seawall

    By Pierre Gouvin

    "This paper discusses real time monitoring of utility vaults during the reconstruction of the Elliot Bay Seawall in Seattle. The project, undertaken because deterioration of the old wall posed increas

    Jan 1, 2017

  • DFI
    Retaining Structure for Berth at Krishnapatnam

    By P. V. Chandramohan

    "The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as

    Jan 1, 2015

  • DFI
    Case History: Comparison of CSL Results to Physical Observations

    By David S. Graham, Paul J. Axtell

    Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b

    Jan 1, 2019

  • DFI
    Challenges Of Earthen Cofferdam In Deep Excavations For Waterfront Structures, A Case Study

    By Balasubramani M., Ramana P. V., Bairagi K.

    This paper is a case study of an earthen Cofferdam, constructed for a deep excavation at Intake location in river Aaundha, Maharashtra, India. A 12 m (39 ft) deep excavation was made to construct the

    Nov 1, 2022

  • DFI
    Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of Antwerp

    By Stefan Mewes

    Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa

    Sep 1, 2022

  • DFI
    No. 1 Queens Road - Melbourne, Australia

    By Tom George

    "INTRODUCTIONNo. 1 Queens Rd was an existing 10-storey office building founded on large pad footings. This project involved the construction of a 6-level, 15m (50-ft.) deep basement excavated immediat

    Jan 1, 2005

  • DFI
    Inspection and Observation Methods

    "Full time inspection of drilled shafts by qualified personnel is a necessary part of construction. Detailed inspection procedures for routine inspection are provided in the Drilled Shaft Inspector’s

    Jan 1, 2004

  • DFI
    Augered Pile World Record Depth within a Soil Mix Basement

    By Andres M. Baquerizo, Jeremiah J. Filjones, Nicholas Feldt

    The Estates at Acqualina located in Sunny Isles Beach, FL, is comprised of two, ocean-front, 50-story, luxury towers with podiums and villas. With city regulations now requesting that above-grade floo

    Jan 1, 2019