Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • DFI
    The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis

    By Dan A. Brown

    The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia

    Jan 1, 2011

  • DFI
    Rock Sockets

    By D. E. Sherwood

    Mr. Tamaro introduced his paper which concerned the construction of foundations for the buildings and related infrastructure of the World Financial Center on a reclaimed shoreline site at the Southern

    Jan 1, 1991

  • DFI
    Tanana River Bulkhead Expansion, Flexibility In Construction; Key To Arctic Dock Construction

    By Roy Peratrovich

    An innovative cost-saving design for a 1,100 ft bulkhead on the Tanana River at Nenana in central Alaska won Alaska Construction & Oil magazine's Construction Achievement Award. The designers uti

    Jan 1, 1985

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • DFI
    Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - Summary

    By Roy A. Bell

    A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet

    Jan 1, 1997

  • DFI
    Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesionless Soils

    By Mohammed Sakr

    The use of helical piles as a deep foundation option has considerably increased in the recent years to support a variety of loads, from small loads for several applications such as residential housing

    Jan 1, 2011

  • DFI
    Use Of Non-Invasive Helical Foundations For Urban Forest Canopy Walk Way ? Atlanta Botanical Garden

    By David C. Kraft

    Helical piles and ground anchors were used to meet critical design and constructability requirements for an urban forest Canopy Walk at the Atlanta Botanical Garden, Atlanta, GA. The 12-foot wide ped

    Jan 1, 2011

  • DFI
    Accessing History

    By Richard Pizzi

    Built in 1806, Boston's African Meeting House is the oldest surviving Black church building in the country. A $7 million dollar renovation was begun in 2006 to restore this historic building to

    Jan 1, 2011

  • DFI
    The Utilization Of Static-Load Piledriving Near Structures That Are Sensitive To Vibration - Static-Load Piledriving: - Concept;

    By Robert A. Field

    Static-Load Piledriving utilizes a hydraulic push to facilitate the installation of a pile. The pile is not rotated, impacted or vibrated. A smooth pushing force advances the pile incrementally into t

    Jan 1, 1997

  • DFI
    Challenge From Foundation Engineering To China ? Synopsis

    By R. L. Xu

    In this paper, the author would like to point out with figures that the building industry is one of the key industrial sectors of the national economy in China. And in the coming 15 years, the output

    Jan 1, 2010

  • DFI
    Use Of Nondestructive Testing To Evaluate Defects In Drilled Shafts: Status Of FHWA Research - Background

    By Clyde Baker

    Drilled shafts for many situations offer an economical alternative to driven piles. The Federal Highway Administration (FHWA) has spent considerable time and money in research and developing design an

    Jan 1, 1989

  • DFI
    Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew

    Jan 1, 2008

  • DFI
    Jet Grouting Underpinning Of A Building In The US

    By Gustavo E. Armijo

    This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose

    Jan 1, 2002

  • DFI
    New Focus: Environmental Impact Reduction of Proper Slurry Waste Management

    By Zachary Q. Maassen

    The purpose of this paper is to highlight the environmental benefits of properly managing slurry waste as it is generated on site. The following projects will be used to illustrate the importance of p

    Jan 1, 2018

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2005

  • DFI
    Environmental Considerations For Foundation Construction In The Boston Area - The New MCP

    By James V. Errico

    On October 1, 1993 the regulations for assessing and cleaning up contaminated soil and groundwater in the Commonwealth of Massachusetts were revised. These new regulations, known as the Massachusetts

    Jan 1, 1994

  • DFI
    Design And Construction Of A Cut-Off Wall In Warm Permafrost

    By Steven L. Anderson

    A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5

    Jan 1, 2010

  • DFI
    Numerical Analysis Of Load Bearing Capacity Of Drilled Shafts With Defects

    By Khamis Y. Haramy

    Quality assurance and quality control of drilled shafts has become a concern due to difficulties in accurately locating construction anomalies and determining load bearing capacity of defected drilled

    Jan 1, 2007

  • DFI
    Operator Independent Installation Of Lime Cement (L/C) Columns

    By Tobias Hansson

    The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva

    Jan 1, 2000