    Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • DFI
    Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.

    By P. M. Wiltcher

    The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high

    Jan 1, 2006

  • DFI
    Case History: Augered Cast-In-Place Piles For The Pittsburgh International Airport Midfield Terminal

    By Randy R. Huberty

    Although originally designed with deep foundations consisting of all driven steel H piles and drilled caissons, a unique application of Augered Cast-in-Place (ACIP) piles as an alternate design result

    Jan 1, 2001

  • DFI
    When Real Estate Values Beckon - The Means And Methods Employed In The Underpinning Of 1501 Broadway

    By Edward J. McNamara

    People in the real estate industry are fond of saying that the three most important features of a piece of property are, in order, location, location, and location. This is perhaps the reason that the

    Jan 1, 2000

  • DFI
    Seal Slab Prestressed Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p

    Jan 1, 2013

  • DFI
    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • DFI
    Construction Considerations For Ground Modification Projects ? Synopsis

    By J. P. Welsh

    Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan

    Jan 1, 2010

  • DFI
    Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits

    By Franklin M. Grynkewicz

    As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc

    Jan 1, 1992

  • DFI
    Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - Synopsis

    By Yvone Franco Crosato

    The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat

    Jan 1, 2000

  • DFI
    3 Recent Developments In Pile Design - Developments In Pile Design

    By W. F. Van Impe

    The design of piles and of pile groups has remarkably progressed over the past two decades. The in­creasing complexity of the building concept implements a more rational approach of the deep foundatio

    Jan 1, 1994

  • DFI
    Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance Program

    By Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols

    Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou

    Jan 1, 2018

  • DFI
    Minimising The Environmental Impact Of Construction Dewatering

    By Peter Jackson

    The dewatering of the large construction pits required for major infrastructure projects often has a significant impact on the environment. This is particularly so in urban areas and where groundwater

    Jan 1, 2000

  • DFI
    Design Of The BMIP Boat Section - Introduction

    By Kenneth Pidgeon

    The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.

    Jan 1, 1994

  • DFI
    Helical Foundations And Tiebacks: Quality Control, Inspection And Performance Monitoring

    By John S. Pack

    The last 25 years have seen rapid expansion in the use of helical screw pile foundations and tiebacks for new and retrofit construction of buildings and earth retention structures. An estimated $100 m

    Jan 1, 2003

  • DFI
    Post-Grouted Drilled Shafts: A Case History Of The PGA Boulevard Bridge Project

    By Gray Mullins

    A post grouted drilled shaft foundation system was successfully used in place of the specified driven pile foundation system as a Value Engineering Cost Proposal (VECP) for the new PGA Boulevard Grade

    Jan 1, 2003

  • DFI
    Establishement Of Bearing Capacity And Integrity Of Cast-In-Place Piles By Means Of Dynamic Pile Tests ? Synopsis

    By H. Meseck

    Dynamic pile test methods to establish the bearing capacity of driven piles were developed in the USA more than 20 years ago. In the Federal Republic of Germany, the first dynamic pile tests were carr

    Jan 1, 2010

  • DFI
    Design & Construction Of Pile Foundations For A Building Complex - A Case History

    By S. K. V. Avasarala

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c

    Jan 1, 1995

  • DFI
    Building Response To Construction Activities

    By Marco D. Boscardin

    Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have

    Jan 1, 2003

  • DFI
    Practical Aspects Of Compensation Grouting ? Synopsis

    By Philip J. H. Ball

    The new application and development of grout jacking processes has combined, over the last decade in particular, to provide a method by which the effects of new underground construction on superficial

    Jan 1, 2000

  • DFI
    5 Pile Testing - Pile Testing

    By George Goble

    I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is