Session 7: Grouting Compaction Grouting For Sinkhole Repair at WAC Bennett DamBy James Warner
Investigations of the sinkhole indicated that the loose, disturbed ground was completely encircled by dense competent core. This confinement substantially increased the effectiveness of the compaction
Feb 10, 2003
-
Permanent Displacement And Pile Driving Vibrations - SummaryBy Charles H. Dowding
Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta
Jan 1, 1991
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, WashingtonBy David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990
-
Application Of Neurofuzzy Approach To Estimate Duration And Evaluate Delay For Diaphragm Wall And Barrette ConstructionBy Thoedtida Thipparat
The diaphragm walls and barrettes are very important to the constructions of multi-storeyed buildings, elevated expressways, subway railway stations, etc. Uncertainties particularly increase in accord
Jan 1, 2006
-
100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution
Jan 1, 1994
-
Effect Of Curing Stresses On The Mechanical Properties Of Soil-cement Mixed MaterialsBy George Onorato, Giovanni Bonita
Deep soil mixing (DSM) has now become a ubiquitous ground improvement technique across the globe for producing soil-cementous materials for many types of complex civil and environmental applications.
-
Information Technology And The Foundation IndustryBy Andreas Massarsch
Information Technology, IT, is rapidly affecting all aspects of private life and how professional activities are conducted. Probably the most important development is the Internet, which makes it poss
Jan 1, 2002
-
Pile Foundations General - .1 Equipment informationBy Bengt H. Fellenius
.1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1
Jan 1, 1991
-
Anchored Hollow Bar Tangent Pile System For UnderpinningBy Marco D. Boscardin, Benjamin H. MacKinney, Kenneth R. Allard, Kenneth A. Pidgeon, Adriane G. Boscardin
This paper presents a case history for a unique application of a system of vertical micropiles with horizontal soil nail bracing and shotcrete facing for underpinning. The system was used to support a
Oct 1, 2022
-
Evaluation Of Ultimate Resistance Of Steel-Concrete Composite Drilled Shafts Through Static Loading TestsBy Moonkyung Chung
Static pile load tests were performed in order to evaluate bearing capacities and mechanical behaviors of three different pile types: (1) steel-concrete composite drilled shaft with rebar reinforcemen
Jan 1, 2010
-
Ground Movements - A Hidden Source Of Loading On Deep FoundationsBy Harry G. Poulos
Ground movements can arise from a large number of sources and can have a significant effect on nearby piles and deep foundations. The loading of the piles by ground movements is a different mechanism
Jan 1, 2006
-
A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test ResultsBy Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000
-
Evaluation Of Pile Foundation Design Methods Using Load TestsBy SungWon Park
The efficiency of the current design methods for computing pile resistances is evaluated using field load-settlement tests results. Twelve load-settlement test data for drilled shafts and bored piles
Jan 1, 2009
-
Uncertainties Arising During Drilling And Performance Of Flight Auger - Cast PilesBy F. M. Abdrabbo
Flight auger bored piles are formed by screwing a continuous flight auger into the ground, and pumping cement/sand grout or concrete down the hollow stem of the auger as its withdrawn. The auger is dr
Jan 1, 1993
-
Unknown Bridge Foundation Investigation With Nondestructive Methods ?The Combined Parallel Seismic/Seismic Cone Penetrometer MethodBy Larry D. Olson
Research, hardware development, and field testing have been conducted on systems to allow easy and accurate determination of both foundation tip depth as well as the properties of the soils at and abo
Jan 1, 2007
-
Using Seismic Tomography To Evaluate Foundation StructuresBy Ed Kase
Cross-hole sonic logging (CSL) has become the universal standard, nondestructive testing (NDT) method used in evaluating the integrity of foundation structures to maintain quality assurance and qualit
Jan 1, 2003
-
Geosetta: Unearthing Geotechnical Data for the Benefit of AllBy Ross Cutts
As a public servant geotechnical engineer, I observed how costly and valuable geotechnical field explorations are to the success of every project. Often however, the field exploration is a long and co
Nov 1, 2023
-
Design Of An Unbraced Elliptical Slurry Wall Cofferdam For Deep Pump Station ConstructionBy Gordon Chen
As part of a value engineering envisioned by East Coast Slurry, Weidlinger Associates, Inc. designed a unique elliptical slurry wall cofferdam for construction of the 65 ft. deep MWRA North Dorchester
Jan 1, 2010
-
Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load TestingBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l
Sep 8, 2021
-
Permanent Soil Nail Earth Retention System, Stanley Hall Replacement Project, UC BerkeleyBy Pirooz Barar
The new Stanley Hall building will house the center for bio-engineering and technology research for the UC Berkeley campus. The structure is located at the northeast part of campus, adjacent to Donne
Jan 1, 2004