Digital Automation Of Geotechnical Sites – The Development And Essential Role Of An Industry Standardised Design FormatBy Scott White, Pishun Tantivangphaisal, Andrew Bell, Chris Barker
There has been considerable advancement in recent years in the tools, both software and hardware, available to allow efficient digitalization of site records during the construction of geotechnical wo
May 1, 2022
-
Remedial Method for Collapse Soil Foundation of Mosul DamBy Arash Khosravifar, Ali N. Ibrahim
"Large areas of Iraq are covered with collapsible soils namely gypsiferous soil which is often used as the foundation soil for structures. In particular, the Mosul Dam foundation is comprised of high
Jan 1, 2017
-
Self-Hardening Slurry Wall Installation by Hydromill at the Herbert Hoover Dike – An Innovative Solution (05e83755-4ec2-4ed4-a26c-d1e81c41960c)By Mario Mauro, Jeff Taylor, Carlos Morales
"In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehab
Jan 1, 2017
-
DEEP FOUNDATIONS INSTITUTE 45th ANNUAL CONFERENCE ON DEEP FOUNDATIONSBy Sebastian Lobo-Guerrero
Welcome to DFI45! our first on-line annual meeting. We cannot deny the severe impacts that the COVID19 pandemic is having in our industry and our lives. We extend our support to all of our members tha
Oct 27, 2020
-
Ground Support for Shafts and Underground Construction Using Artificial Ground Freezing – Sophia Spoortunnel Rotterdam (Nl) – Cern Geneva (CH) – Leipzig (DE) – Berlin (DE)By Helmut Hass, Marco Ziller
"Abstract: 1 Sophia Spoortunnel Marco Ziller, Trevi S.p.A.:For the construction of 14 cross passages connecting the twin tunnels of the Sophiaspoortunnel the Artificial Ground Freezing technique was a
Jan 1, 2014
-
Disconnected Piled Raft Foundations Performance (DCPRF) With CushionBy Saeed Salehi Malekshah
In hybrid foundation system or piled raft foundation (PRF), the raft has adequate bearing capacity and piles are usually required to ensure overall stability of foundation and also to act as settlemen
Jan 1, 2011
-
From Linear To Circular Economy; Using Hollow Piles To Reduce Embodied Carbon And Promote Pile ReuseBy Andrew McNamara, Stuart Norman, Matthew Dearing, Michael Pelken, Asha Panchal
The deep foundations industry has largely remained unchanged since in the advent of CFA piling in the 1960s. Piles have consequently been designed and constructed following the traditional codes and s
May 1, 2022
-
Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage TunnelBy Ryan Sullivan, Lisa Smiley, Jewels Stover
The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-
-
Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2011
-
Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - SummaryBy Edmund J. Cardoza
The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is
Jan 1, 1992
-
Excavation Support At Historic Buildings In An Urban Environment - A Case StudyBy Tony Mazzo
It has often been said by consulting engineers that foundation contractors are in the business of taking risks. One would agree that the mere fact a foundation project can be budgeted, planned, engine
Jan 1, 2003
-
Evaluation of Soil-Bentonite Backfill Consolidation PropertiesBy Jeffrey C. Evans, Daniel G. Ruffing, Hejintao Huang
Soil-bentonite slurry trench cutoff walls are the most common type of vertical cutoff wall used in the US for seepage control and for passive control of contaminant migration at environmental sites.
Jan 1, 2016
-
Large Diameter Auger Cast Piles At Audi Field, Dc United's New Soccer StadiumBy Christophe H. Locussol
D.C. United, the professional soccer team located in Washington, D.C., completed a 20,000 seat capacity stadium in July 2018 named Audi Field. The project initially considered a foundation system cons
-
Numerical Analysis of Progressive Failure of DM Columns beneath Embankment on Soft GroundBy Zhou Haizuo, Diao Yu, Zheng Gang
"The conventional design method for the embankment supported by DM columns usually assumes the simultaneous failure of all the columns. However, the progressive failure may occur in practice, especial
Jan 1, 2015
-
Suction Piles And Suction Anchors For Offshore StructuresBy S. Bang
In recent years, suction piles and suction anchors have been used as underwater foundations for various offshore structures. They have been proven very versatile, effective, and environmentally frien
Jan 1, 2009
-
Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.By Mark Spence, Tom Lardner, Matthew Janes
"IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora
Jan 1, 2015
-
Managing SOE Construction Risk through Design-Build SystemsBy Rob Jameson
"The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,
Jan 1, 2017
-
Davison Freeway Reconstruction Utilizes Design/Build Retaining WallsBy Thomas C. Anderson
Thirty-four retaining walls are part of the $46 million upgrade of a 1942 depressed highway in Highland Park, Michigan near Detroit. This project will close a missing link between two newer roadways,
Jan 1, 1999
-
Diaphragm Wall Construction In Hong KongBy Arturo Ressi di Cervia
The utilization of diaphragm wall construction in Hong Kong began in 1974 with the construction of the New World Center, the first diaphragm wall job built in the British Colony. That landmark job
Jan 1, 1993
-
Reliability Analysis Of Load Bearing Capacity Of Single Pile Placed Adjacent To Existing Buried Conduit Or Utility TunnelBy Amit Srivastava, Monica Malhotra
In a congested city or urban area, so called “lifeline of the city”, i.e. Gas, Electricity, telecommunication, as well as other utilities or facilities are supplied or transported underground through
Sep 1, 2022