Design And Construction Of The Deepest Cfa Pile In AustraliaBy W. L. Chong
For a project located in Docklands Victoria, a high-rise development was proposed where the geology comprised soils of various compositions and consistencies to approximately 50m deep before being und
Nov 1, 2022
-
Pre-engineered Hydraulic Bracing SystemsBy Braxton P. Erbe, Douglas C. Brunot
A variety of systems and techniques exist to support deep excavations where sloping is not feasible. This paper will explore an example project involving the use of pre-engineered hydraulic bracing sy
-
International Workshop On Micropiles ? September 26-28,1997 - Title ? Table Of Contents - First International Workshop On Micropiles September 26-28,1997This Workshop was held at the Doubletree Inn, Seattle, Washington from September 26 to 28, 1997. Run under the auspices of the Deep Foundations Institute (DFI), it was co-funded by the newly formed Ja
Jan 1, 1997
-
The Deep Cut-Off at the Walter F. George Dam"TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow
Jan 1, 2014
-
Utilizing Drones to Improve Project WorkflowsBy Barritt Lovelace
Collins Engineers has been researching and implementing the use of drones on Civil Engineering Projects since 2015. Applications include bridge inspection, asset management, mapping, construction site
Jan 1, 2019
-
Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar StrainmetersBy Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula
"This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat
Jan 1, 1900
-
-
Innovative Alternate Underpinning Solution for Historic Structure in Boston SuburbBy Eric P. Bregman, Justin Zarrella, Ryan M. Coulson, Connor Johnson
Within a prominent Boston, MA suburb are a pair of historic stone and mortar structures built in the late 1800’s. Both the Main House and Carriage House have been maintained and occupied throughout th
Sep 8, 2021
-
Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction FatigueBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions
Jan 1, 2019
-
Installation Effects of Drilled Screw Pile In Soft ClayBy Jianhua Wang, Jianming Yao, Zhen Meng, Jinjian Chen
"Drilled screw pile is a newly developed displacement pile foundation which has been applied in soft clay for many years. Compared with traditional circular displacement pile, It is characterized by h
Jan 1, 2015
-
Building Drilled Shafts to Bridge the MississippiBy Brian Koch
Michels installed 242 drilled shafts to support the piers for a new basket-handle, true-arch twin bridge across the Mississippi River from Moline, IL to Bettendorf, IA. The installation of the drilled
Jan 1, 2019
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
One Seam At A Time: Interactive Quality Assurance To Identify Coal Seams During Foundation ConstructionBy Matthew Runion, Christopher Lawler
The Aeolus – Jim Bridger Transmission Line Project is located in southern Wyoming, home to some of the largest coal seams in the world. Coal seams present unique challenges to underground construction
-
LRFD and Its Implications for QC/QA of Deep FoundationsBy Bernard Hertlein, Chia K. Tan
"The move to LRFD methods for structural design by AASHTO, ACI, AISC , ASCE, and the FHWA has been a major change for the American construction industry. The deep foundations industry has arguably bee
Jan 1, 2005
-
Partnering And Technical Innovation Used To Stabilize Slurry Trench Walls Under Commuter Rail Station For Boston's Big DigBy Paul Pedini
The challenge of Contract C19E1 of Boston's Central Artery Project called for the construction of two roadways under the commuter rail yard at North Station. Two options were offered for the meth
Jan 1, 2002
-
Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle EastBy Brian Metcalfe, Kord Wissmann, Gianni Martinez
The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large
May 1, 2022
-
Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in LondonBy Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow
"Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of
Jan 1, 2005
-
Slurry Wall Design for Construction Using Soil Structure InteractionBy Nino Catalano, Meeok Kim, Gordon Chen
"The design of the below grade structure of Brigham Building for the Future (BBF) included three different areas to provide power generation and medical facilities as well as a parking garage. The thr
Jan 1, 2017
-
Characteristics of Strength Development of Fiber-Reinforced and Cement Improved Soft Clay of ShanghaiBy Mu Chen, Ye-Shuang Xu, Dong-Wei Hou, Shui-Long Shen, Huai-Na Wu
"This paper presents a laboratory investigation on the mechanical behaviors of the cement-clay admixture improved by polypropylene fiber. Cement can significantly improve the clay admixture. The fiber
Jan 1, 2015
-
“Value Engineering” — Four Case HistoriesBy Maral Papazian Bedian
"Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans
Jan 1, 2003