Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Settlement Of A Building After Cutting Off Pile Tips Due To Tunnelling

    By Richard A. Forth

    During the construction of the Island Line (ISL) in Hong Kong between 1982 and 1986 piled foundations of a building were encountered in a tunnel drive. As the tunnel alignment could not be changed wor

    Jan 1, 2002

  • DFI
    Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes

    By John E. Lens

    Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at

    Jan 1, 2011

  • DFI
    Design Of Concrete Tunnel Liners And Pipes By Ring Compression Theory ? Synopsis

    By W. Lum

    In the U.S., flexible metal pipe culverts are designed by ring compression theory because the pipes are capable of deflecting and deriving side support from surrounding ground. For economy, tunnel

    Jan 1, 2010

  • DFI
    Evaluation Of Pile Foundation Design Methods Using Load Tests

    By SungWon Park

    The efficiency of the current design methods for computing pile resistances is evaluated using field load-settlement tests results. Twelve load-settlement test data for drilled shafts and bored piles

    Jan 1, 2009

  • DFI
    Evaluation Of Ultimate Resistance Of Steel-Concrete Composite Drilled Shafts Through Static Loading Tests

    By Moonkyung Chung

    Static pile load tests were performed in order to evaluate bearing capacities and mechanical behaviors of three different pile types: (1) steel-concrete composite drilled shaft with rebar reinforcemen

    Jan 1, 2010

  • DFI
    Lateral Behavior Of Post Grouted Drilled Shafts

    By Emad Farouz, Ehab S. Shatnawi, Charles Winter

    The increasing demand for small deformations and high-capacity drilled shafts without enlarging drilled-shaft diameters has motivated the development and increased use of a base grouting (BG) techniqu

  • DFI
    A Case Study, Design Change from Spread Footing to Drilled Shafts

    By Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal

    "This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi

    Jan 1, 2016

  • DFI
    Design Of Foundation On Granular Piles For Five Storeyed Esidential Complex At Nazira, Assam - Synopsis

    By B. N. Hira

    A multistoreyed residential complex was at the penultimate stage of construction by ONGC at Nazira, Assam. The site was situated at high earthquake zone. The subsoil was very weak and contained soft t

    Jan 1, 1996

  • DFI
    New Insights On Detecting Flaws With Csl And Tip

    By Andrew Z. Boeckelmann, David S. Graham, Paul J. Axtell

    In the last fifteen years, several research studies have evaluated the ability to detect various types of deep foundation concrete integrity flaws with crosshole sonic logging (CSL) and thermal integr

    Oct 1, 2022

  • DFI
    Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998

    By D. M. Holloway

    As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity

    Jan 1, 1998

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab

  • DFI
    Non-Destructive Geophysical Evaluation Of Deep-Mixed Soil: A Computer Modeling Study

    By David A. Staab

    Numerical modeling was used to investigate the feasibility of using two geophysical imaging techniques, cross-borehole ground penetrating radar (XBGPR) tomography and electrical resistivity (ER) tomog

    Jan 1, 2004

  • DFI
    Effect Of Slope On P-Y Curves; Under Passive Loading

    By K. [Muthukkumaran

    An extensive program of laboratory model tests was undertaken to study the effect of slope on p-y curves under passive loading in dry sand. The paper concerns the method developed in a series of labor

    Jan 1, 2006

  • DFI
    Settlement Monitoring Of A Building Underpinned With Micropiles And Soil Nails

    By Bill Zietlow

    A micropile and soil nail underpinning system was installed to support a building immediately adjacent to a 25-ft deep excavation in downtown Salt Lake City, Utah. Both the building and the underpinn

    Jan 1, 2008

  • DFI
    Dam Wall Toe Stabilisation Using Mass Soil Mixing Techniques

    By David W. Martel, Tom George

    "As part of the regional water authority review and upgrade of local dams a 35m x 5m x 3m wet soil mixed block was required for stabilisation of a dam wall toe in remote Victoria, Australia. Remote ac

    Jan 1, 2015

  • DFI
    Steel H-Section Piles Support 2,120-Foot Long Cable Stayed Bridge Verona Island And Prospect, Maine

    By James W. Weaver

    The 2,120-foot long cable stayed Penobscot Narrows Bridge that carries US Route 1 over the Penobscot River between Verona Island and Prospect, Maine is supported on four foundation units, one below ea

    Jan 1, 2011

  • DFI
    Recommended Steps And Procedures For Planning And Performing A Geotechnical Investigation For A Seismic Retrofit ? Introduction

    By Mark DeSalvatore

    Currently, at Caltrans, the Office of Structure Design is carrying out an extensive seismic retrofit program involving transportation structures throughout California. The goal of the retrofit program

    Jan 1, 1993

  • DFI
    Automated Pile Load Test Monitoring

    By Joel L. Volterra

    Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site

    Jan 1, 2008

  • DFI
    An Unusual Permanent Shoring Job

    By Gordon Demetrick

    3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi

    Jan 1, 1987

  • DFI
    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991