Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock Slope

    By Herbert F. ?Buck? Darling

    A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat

    Jan 1, 2013

  • DFI
    Stone Columns At Trenton Water Treatment Facility - Suitable Alternative To Remove And Replace For Mat Foundation

    By Darrell Wilder

    The Trenton Water Treatment Facility in Trenton, New Jersey, is expanding to upgrade existing facilities and to meet the increasing demands of the public. The facility sits uncomfortably between the

    Jan 1, 2008

  • DFI
    Heating And Cooling Structures With Steel Pile Foundations Closed Loop Standing Column Well Technology

    By Paul Suver

    The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing co

  • DFI
    Innovative Micropile Retrofi t of an Existing Structure

    By Kenneth R. Chadwick, Thomas J. Tuozzolo, Terence P. Holman

    "Micropiles are often installed to retrofit existing foundations that experience distortion and to underpin structures prior to future construction. The Dublin Road Pump Station project is an example

    Jan 1, 2008

  • DFI
    Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall Panels

    There are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration

    Jan 1, 2005

  • DFI
    R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and Performance

    By Michael Cianchetti, Nadir Ansari, Matthew Janes

    "PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations

    Jan 1, 2007

  • DFI
    Forensic Evaluation Of Bored Piles For A Factory Project At Jhajjar

    By Sanjay Gupta, Sorabh Gupta, Ravi Sundaram

    A geotechnical forensic evaluation of piles for an industrial facility in Haryana was performed to assess the quality of the piles and to evaluate piles installed using two different types of rigs. Lo

    Sep 1, 2022

  • DFI
    Jobsite Safety Inspection Checklist

    By Sam Messina

    [Project: Job Number: Date: Superintendent: Person Making Inspection: Note: The following checklist shall be used on a regular basis as an overall assessment of the jobsite. The checklist

    Jan 1, 1998

  • DFI
    Increasing Lateral Pile Stiffness Through Limited Soil Improvement

    By Thomas J. Weaver

    Piles extending through soft soil near the ground surface will have a relatively low lateral stiffness. As a result, lateral serviceability limits may control the number of piles required for foundat

    Jan 1, 2006

  • DFI
    East Boston Branch Sewer Relief Project: Support Of Excavation Case Study

    By Eric P. Bregman

    As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

  • DFI
    East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)

    By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan

    "As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

    Jan 1, 2017

  • DFI
    Capitol Complex Phase 1 Expansion

    By Eric S. Lindquist, Charles A. Luxford

    The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par

  • DFI
    Recent Experiences With Bi-Directional Static Load Testing

    By M. England

    Keywords: Bi-directional tests, Osterberg cell, O-cell®, static load tests, Timeset® Static load testing, where loads are applied vertically to the top of the pile and often referred to as 'to

    Jan 1, 2006

  • DFI
    Design And Construction Of A Micropile Wall To Stabilize A Railway Embankment.

    By Jim Bruce

    This paper presents details of a slope stabilization scheme built in late 2003 at a 16m-high railway embankment in southern Ontario, Canada. The owner, faced with continuing maintenance and safety iss

    Jan 1, 2004

  • DFI
    Stabilization of an Existing Cellular Tower Foundation by Installing Jet Grouted Piles

    By David T. Farber

    "Stabilization of an existing cellular tower foundation system without dismantling the tower or compromising the existing foundation system was accomplished by installation of a jet grouted pile syste

    Jan 1, 2005

  • DFI
    Rammed Aggregate Pier System Provides Uplift Resistance At University Ice Arena

    By John G. DiGenova

    The Allwell Center Ice Arena at Plymouth State University, Plymouth, New Hampshire is located in the flood plain of the Pemigewasset River. To maintain the arena near the level of the surrounding are

    Jan 1, 2011

  • DFI
    Numerical Simulation Of Quasi-Static Pile Load Test

    By N. Q. Huy

    This paper describes the application of finite element analysis to simulate the static and quasi-static pile load tests in different drainage conditions. The possible effect of excess pore water press

    Jan 1, 2006

  • DFI
    Developments For Mitigating Measures From Deep Shafts Of North/South-Line Amsterdam

    By Klaus Pöllath

    This paper describes mitigating measures and the design of compensation grouting which will be executed from deep shafts of the Amsterdam North/South Metro line project. Due to the specific conditions

    Jan 1, 2006

  • DFI
    Geospatial Project Information Management System At Herbert Hoover Dike

    By Jamey Rosen

    A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of

  • DFI
    Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:

    By A. L. Garassino

    Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside

    Jan 1, 1994