Principles and Soil Mixing Examples of Portland Cement-Based Solidification/Stabilization TreatmentBy Charles M. Wilk
"Solidification/stabilization (S/S) treatment is used to treat hazardous wastes for disposal and in the remediation/site restoration of contaminated land . SIS is also an increasingly popular technolo
Jan 1, 2005
-
Development Of Design Practice For Piles In Stiff Glacial TillBy Kenneth Gavin
Design practice for piles installed in Irish glacial till has developed in an ad-hoc manner, based on the results of un-instrumented load tests. This had led to designers using similar design paramete
Jan 1, 2009
-
The Deep Soil Mixing for the Galataport Project in Istanbul, Turkey.By Federico Pagliacci, Marco Chiarabelli, Salvatore Miranda
The paper describes the adopted technologies and performance controls related to a special geotechnical engineering solution provided within the scope of the Galataport Project, in Istanbul, Turkey. T
Jan 1, 2018
-
The Emergence Of The Soil-Cement Mixed Wall Technique And Its Application In 1980'sBy Osamu Taki
The innovative Soil-Cement Mixed Wall Technique emerged in Japan and obtained recognition in the engineering and construction communities in the 1980's. This technique was introduced to the Unite
Jan 1, 1990
-
Large Diameter CIDH Construction In Cohesionless Soils By The Use Of Rotator/Ocsillator Techniques: A Case Study - 116th Avenue Bridge Over The Gila River Phoenix, Az.By M. Cornelius
Drilled shaft construction through caving soils has historically been an uncertain, risky and costly operation. Uncertain, because the zone of caving may or may not be known, risky because the loss of
Jan 1, 1999
-
Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of MexicoBy Justin Simmons, Michael Arnold, Bob Faulhaber
"In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms
Jan 1, 2017
-
Are Specifications for Deep Foundation Concrete Up-To-Date?By Karsten Beckhaus
"Abstract Tremie concrete for special geotechnical works needs special properties, especially during the casting process. Today’s execution standards for bored piles and diaphragm walls, EN 1536 and E
Jan 1, 2014
-
Evaluation Of Causes Of Bleeding Of Free Water From A Bentonite SlurryBy Tony P. Suckling
This paper describes an investigation into the bleeding behaviour of bentonite slurry observed on a trial diaphragm wall panel. The bleeding is thought to be due to the bentonite experiencing a chemi
Jan 1, 2011
-
Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building TechnologiesBy P. Arz
With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al
Jan 1, 1989
-
Field Sampling and Testing for Soil Mixing – Uses and Misuses of Different QA/QC Tests for CDSM Projects – A Contractor’s PerspectiveBy A. David Miller, Chika Oya
"Field sampling and testing are part of the Quality Assurance/Quality Control (QA/QC) requirements for all Cement Deep Soil Mixing (CDSM) Projects. Field sampling and testing are also used for determi
Jan 1, 2017
-
Soil Inclusions In Jet Grout ColumnsBy Timothy D. Stark
Jet grouting has increasingly become one of the ground improvement technologies used to address seepage concerns and to provide strength improvement of soils. The technique of jet grouting uses high p
Jan 1, 2009
-
Lateral Earth Pressure On Lagging In Soldier Pile Wall SystemsBy Howard A. Perko
Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me
Jan 1, 2008
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
Mixed-in-Place Cut-Off Walls Create Artificial Polders in the NetherlandsBy R. Gerritsen, Erwin de Jong, E. van der Velde, C. te Boekhorst
"In recent years the market for Mixed-In-Place soil mix techniques in the Netherlands has been growing rapidly. Initially the technique was used to create cut-off walls near river dikes and as a vibra
Jan 1, 2015
-
Large Diameter Helical Piles for Refinery ExpansionBy Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
Deep Foundations In The Challenging Geology Of Central FloridaBy Gary Kuhns
Central Florida is among the fastest growing urban areas in the United States, and its rapid development has required the steady construction of various types of civil engineering works. The karst geo
Jan 1, 2003
-
The Synergy Between Theory And Practice In Geo-EngineeringBy Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
Drilled Shaft Load Testing Program for Design of Foundations for an Automated People MoverBy Samer Rabab’ah, John C. Niedzielski, Jason Valeria
The PHX Sky Train is an automated people mover system located at Phoenix Sky Harbor International Airport. Phase II of the PHX Sky Train includes the design of over 150 drilled shafts for support of f
Jan 1, 2019
-
Rehabilitation of U.S. 70 Bridge over Lake HamiltonBy Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007
-
Rehabilitation of U.S. 70 Bridge over Lake Hamilton (de2c0766-552c-4812-a9ab-394a9bebc445)By Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007