Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Piling In Coal Measures At The City Of Manchester Stadium For The Commonwealth Games 2002

    By Colin Curtis

    The City of Manchester is hosting the 2002 Commonwealth Games. A world class Stadium with a 38,000 capacity was commissioned for a site located close to the City Centre. The Stadium location is in an

    Jan 1, 2002

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2003

  • DFI
    Mathematical Background For The Design Of Rotating Machinery Foundations With Deep Piles ? Summary

    By Marius B. Wechsler

    There are considered deep piles which are fixed in blocks of rotating machinery foundations. A mathematical background is developed for determining the behavior of this kind of piles for motions cause

    Jan 1, 1987

  • DFI
    "Renovation Of The Amsterdam Concert Hall, Replacing 2000 Wooden Piles By 400 Vibration-Free Tubex Piles In Restricted Room."

    By Alexander J. Verstraeten

    Work started on the building of the Amsterdam Concert Hall in 1880 by driving over 2000 wooden piles of 13 m on which foundation-beams out of wood and brickwork were made. During construction the de

    Jan 1, 1987

  • DFI
    The Effect Of Drilling Fluid On Axial Capacity, Cape Fear River, NC

    By Dan Brown

    Two drilled shaft foundations were subjected to axial load tests in order to measure the influence of drilling fluid on performance. Other than the differing drilling fluids, the shafts were construct

    Jan 1, 2002

  • DFI
    Session 14 "Deep Mixing Method III"

    By Stefan Dahlin

    The laboratory tests indicated low permeability but as I said, as a rule, the permeability in the field has been found to be higher. A high permeability has also been found when doing back calculation

    Feb 10, 2003

  • DFI
    One Seam At A Time: Interactive Quality Assurance To Identify Coal Seams During Foundation Construction

    By Matthew Runion, Christopher Lawler

    The Aeolus – Jim Bridger Transmission Line Project is located in southern Wyoming, home to some of the largest coal seams in the world. Coal seams present unique challenges to underground construction

  • DFI
    Statnamic Load Testing; Overview And Case Histories Of Augered Cast-In-Place Piles

    By Mike Muchard

    Augered cast-in-place piles are one of the most cost effective deep foundation options available to designers but have been largely underutilized due to skepticism associated with quality assurance an

    Jan 1, 2000

  • DFI
    1785 Massachusetts Ave. NW, Washington, D.C.

    By Daniel Stevenson, Richard Guenther

    "The preservation of historic buildings is not only essential to the understanding of our national heritage, but it is also environmentally responsible to adapt existing buildings to compatible new us

    Jan 1, 2017

  • DFI
    Sustainability Assessment of Deep Foundations: Case Study

    By Krishna R. Reddy, Jyoti K. Chetri, Girish Kumar

    Geotechnical engineering encompasses a major portion of the civil and infrastructure projects. The large amounts of energy and resources typically used in these projects leads to undesirable emissions

    Jan 1, 2019

  • DFI
    Static And Dynamic Tests For Evaluation Of The Vertical Load Bearing Capacity Of Piles - Summary

    By Madan B. Karkee

    The understanding and the development of sound theoretical basis concerning the pile foundations has been phenomenal during the past few decades, considering the thousands of years the piles have evid

    Jan 1, 1997

  • DFI
    Deep Drilling at Mica Dam, British Columbia

    By Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer

    "Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow

    Jan 1, 2017

  • DFI
    High Capacity Grouted Helical Piles

    By Mohamed A. Mansour, Ahmed M. Soliman, M. H. El-Naggar

    "Grouted helical piles allow significant increase in pile capacity with low additional cost over that of conventional helical piles. They can be particularly advantageous in sites where installation d

    Jan 1, 2016

  • DFI
    Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction Fatigue

    By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam

    Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions

    Jan 1, 2019

  • DFI
    Founded on Creativity North Dakota’s Four Bears Bridge

    By Terrence R. Udland, Russell D. Call

    "Honored with a DFI 2006 Special Recognition Award, the Four Bears Bridge was constructed across Lake Sakakawea and opened to traffi c in September 2005. The very large lake size and severe winter con

    Jan 1, 2007

  • DFI
    Design of Grillage and Helical Pile Foundation for Limited Access Transmission Line

    By Benjamin Jennings, Jason Herron

    In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis

    Jan 1, 2017

  • DFI
    Times Square Tower: Urban Squeeze

    By Tony D. Canale, Anthony Mazzo

    "Times Square, arguably one of the best-known destinations in the world, has undergone and continues to undergo a re-development aimed at attracting corporate tenants to the area. Mueser Rutledge Cons

    Jan 1, 2005

  • DFI
    Embodied Carbon Assessment For A Multi-Phased Development Pile Testing Strategy

    By Jack Taggart, Chris Barker

    Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor

    May 1, 2022

  • DFI
    Characterization Of Loess For Deep Foundations

    By Robert L. Parsons

    This paper describes the results of a detailed analysis of a loess deposit at the deep foundations test site established by the Kansas Department of Transportation. Multiple CPT, SPT, and pressuremet

    Jan 1, 2009

  • DFI
    Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile Design

    By Jesse R. Jacobson

    A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of

    Jan 1, 2011