A Case History of Intrinsic Remediation of Reactive Tailings Seepage for Questa Mine, New MexicoBy SungJe Chi
Intrinsic remediation is the effect of natural attenuation mechanisms - dilution, dispersion, sorption/precipitation and biodegradation - reducing contaminant concentrations in ground water to specifi
Jan 1, 2017
-
New Developments of Jacked PilesBy Victor Li, Joley Lam
"INTRODUCTIONJacked piles are piles that are pressed into the ground, usually by hydraulic jacks. For this reason, jacked piles are also known as pressed in piles. Jacked piles are mainly used for the
Jan 1, 2004
-
Thornton Road, Listerhills, BradfordBy B. C. Slocombe
A large derelict inner city site was regenerated for use as a distribution warehouse. Difficult topography and soils conditions required the adoption of a combination of specialist geotechnical proces
Jan 1, 1989
-
Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their AnalysesBy Eiji Kojima
In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn
Jan 1, 2006
-
D-Wall Extreme – Contrast Between Going Deep And Getting SmallBy Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep groundwater barriers, named Cut-Off-
May 1, 2022
-
Integrity Testing Of Deep Foundations - SynopsisBy R. T. Stain
Integrity testing of deep foundations is now common practice in Europe, indeed in the City of London such testing is a contractural requirement on every site. This paper is in two parts: Part
Jan 1, 1987
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile SystemBy Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Recycling Jet Grout Backflow: Waste Mitigation and Cost BenefitsBy Craig T. Jones, Zachary Q. Maassen
"Jet grouting is a method of ground improvement that relies on the erosive capacity of high-speed jets to cut and mix the ground in place with a cementitious grout. A continuous return flow of cutting
Jan 1, 2017
-
Argosy Casino Expansion: Open Cell Sheet Pile® Harbor ProjectBy Michael Lane
With the success of their existing casino operation on the Ohio River in Lawrenceburg, Indiana, the Indiana Gaming Co., LP planned a major expansion of the current facilities. This expansion includes
Jan 1, 2008
-
Long-Term Performance Of Wind Turbine Foundations Through Numerical ModelingBy Spencer Ness, Yazen Khasawneh, William Tjaden, Mohammad Nassim
The evaluation of long-term performance of the wind turbine structures is essential in lowering the Levelized Cost of Electricity (LCOE) from wind sources. The required maintenance of the wind turbine
Oct 1, 2022
-
Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial DepositsBy Franklin M. Grynkewicz
As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc
Jan 1, 1992
-
Seismic Rehabilitation Of Seattle's Pier 69By David Pierce
The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to rehabilitate Pie
Jan 1, 1992
-
John F. Kennedy Airport Site Redevelopment: Tapertube Pile FoundationBy Gisele R. Passalacqua, Aly Mohammad, Joanna Smith
The $13 billion John F. Kennedy (JFK) airport construction redevelopment program includes new terminals and buildings that are supported on piles to meet the airport expansion demand due to increased
-
Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - IntroductionBy Nino Catalano
The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso
Jan 1, 1994
-
Drilled Shaft Difficulties and a Micropile SolutionBy Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018
-
Seismic Response of Raft Foundations Supported on Aggregate Piers (f3188351-761b-458f-b00c-1bcc1cb9cf93)By Alper Turan, Hesham El Naggar
"The use of aggregate pier foundation systems has become widespread as the engineering practice moves towards cost-effective ground improvement solutions that provide accelerated construction schedule
Jan 1, 2017
-
Analysis Of Piled Raft Foundation ? SynopsisBy Gandhi
Piled raft foundation under uniformly distributed vertical loads has been analyzed using Finite Element Method. The soil is considered to be linear elastic, isotropic, homogeneous. The raft,pile and t
Jan 1, 1996
-
Sandwich Wall Beneath Amsterdam Centraal Station - An Innovative Approach For Jet Grouting Under Difficult ConditionsBy J. C. W. M. de Wit
An excavation, within which a tunnel is sunk as a part of the Centraal Station underground station (platform section) of the Noord/Zuidlijn ('North/South Line'), is to be created beneath the
Jan 1, 2006
-
Comparison of Static Lateral Behavior of Vertical and Battered Pile Groups of the I-10 Twin Span Bridge Using Finite Element SimulationBy Ahmad F. Souri, Murad Abu-Farsakh
"In this study, the static lateral resistance of vertical and battered pile groups was analyzed using 3D finite element analysis. The battered pile group finite element model was verified using the re
Jan 1, 2017
-
Installation Of Augered Cast-In-Place Piles - Equipment (b596934a-6910-4dd1-8c4a-72745306d21b)By Tracy Brettmann
? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2001