  • DFI
    Construction of Jacking Pits in Boston’s Central Artery/Tunnel Project

    By Arturo Ressi di Cervia

    "The Construction of the Thrust Pits for Jacking of the I-90 Tunnel for the Central Artery/Tunnel Project (Part of Contract No. C09A4) in Boston MA was nominated for DFI’s 2002 Outstanding Project Awa

    Jan 3, 2003

  • DFI
    Ground Support And Its Toolbox

    By G. Sauer

    "More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava

    Jan 1, 2003

  • DFI
    Lateral Pile Load Testing Under Cyclic Loads

    By Dan Brown

    This paper presents a case study of a cyclic lateral pile load testing program performed on two 18-in square prestressed concrete piles (PSC) in Savannah, Georgia. The load test program was developed

    Jan 1, 2003

  • DFI
    Historical Evolution Of The Micropile "Palo Radice" - Inception Of The Micropile

    By Pier Luigi Iovino

    As Technical Director of the Naples, Italy based Fondedile, a geotechnical construction firm specializing in static restoration of structures, Fernando Lizzi, Ing., devoted over 30 years to the pursui

    Jan 1, 2003

  • DFI
    Overview Of Earth Retaining Systems And Their Selection

    By Raymond J. Castelli

    The paper provides a general overview of the numerous types of earth retaining systems currently available, and organizes these various systems by several classification methods. These classifications

    Jan 1, 2003

  • DFI
    Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History

    By Gregory A. Stephan

    A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is

    Jan 1, 2003

  • DFI
    Drilled Shaft Side Shear Capacity In Compressible Materials What Influences Capacity?

    By J. A. Hayes

    For over a decade the Osterberg Load Cell has been successfully used to determine the shear capacities of drilled shafts. Since the test method measures side shear directly, analytical complications d

    Jan 1, 2003

  • DFI
    Using Seismic Tomography To Evaluate Foundation Structures

    By Ed Kase

    Cross-hole sonic logging (CSL) has become the universal standard, nondestructive testing (NDT) method used in evaluating the integrity of foundation structures to maintain quality assurance and qualit

    Jan 1, 2003

  • DFI
    Helical Pulldown? Micropiles Support Museum Celebrating The Bicentennial Of The Lewis And Clark Expedition

    By Roy Jennings

    The Discovery Expedition of St. Charles, MO chose to build its two-story museum in the flood plain of the Missouri River, near the starting point of the Lewis and Clark Expedition. Should the lower le

    Jan 1, 2003

  • DFI
    Auger-Cast Piles Founded In Compressible Bearing Stratum

    By Alfred H. Brand

    New York City contains extensive deep deposits of glacial lake varved silt and clay, often overlain by organic soil. An 18 story building was proposed for Manhattan's upper East Side in one such

    Jan 1, 2003

  • DFI
    Compaction-Induced Lateral Earth Pressures And Vertical Shear Forces Acting On Non-Moving Retaining Walls

    By George M. Filz

    Restrained basement walls and unrestrained but massive concrete walls on rock foundations experience very small movements in response to lateral earth pressures. Such walls are often designed using at

    Jan 1, 2003

  • DFI
    Augered Cast-In-Place Pile Installation, Grand Forks, North Dakota

    By Kyle A. Kershaw

    The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo

    Jan 1, 2003

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003

  • DFI
    Brightman Street Bridge Replacement Project

    By Arturo Ressi di Cervia

    Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, conc

    Jan 1, 2003

  • DFI
    Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press Foundation

    By David C. Kraft

    A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki

    Jan 1, 2003

  • DFI
    Numerical Analysis Of The Osterberg Cell Loading Test

    By Brunella Recinto

    Pile loading tests are carried out with two main objectives: 1) evaluating the ultimate resistance; 2) checking the behaviour of the pile under live load. In the first case and particularly for large

    Jan 1, 2003

  • DFI
    Helical Piles With Grouted Shafts - A Case History

    By Shawn Downey

    A helical pile with in-situ grouted shaft was used to underpin the existing slab of a large retail store in the Edmonton, Alberta Canada area. The existing structural slab did not have the capacity to

    Jan 1, 2003

  • DFI
    Micropiles In Soft Florida Limestone

    By James D. Hussin

    The Florida limestone is a relatively soft rock which presents many challenges to engineers when designing deep foundations. One alternative is micropiles which have grown significantly from their ear

    Jan 1, 2003

  • DFI
    Design And Construction Aspects Of A Deep Basement In Dublin - Synopsis

    By Philip J. Daynes

    As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase

    Jan 1, 2003

  • DFI
    Helical Foundations And Tiebacks: Quality Control, Inspection And Performance Monitoring

    By John S. Pack

    The last 25 years have seen rapid expansion in the use of helical screw pile foundations and tiebacks for new and retrofit construction of buildings and earth retention structures. An estimated $100 m

    Jan 1, 2003