Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
- 
                     Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - Summary Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - SummaryBy William D. Spielvogel The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t Jan 1, 1994 
- 
                     Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - Summary Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - SummaryBy Francis D. Leathers Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform Jan 1, 1994 
- 
                     5 Pile Testing - Pile Testing 5 Pile Testing - Pile TestingBy George Goble I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is Jan 1, 1994 
- 
                     Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - IntroductionBy P. A. Neill, O&apos The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee Jan 1, 1994 
- 
                     100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage 100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution Jan 1, 1994 
- 
                     Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3 Jan 1, 1994 
- 
                     Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume: Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:By A. L. Garassino Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside Jan 1, 1994 
- 
                     3 Recent Developments In Pile Design - Developments In Pile Design 3 Recent Developments In Pile Design - Developments In Pile DesignBy W. F. Van Impe The design of piles and of pile groups has remarkably progressed over the past two decades. The increasing complexity of the building concept implements a more rational approach of the deep foundatio Jan 1, 1994 
- 
                     Special Topic On Eurocode 7 And Standardization - Eurocode 7 - A European Geotechnical Design Code - The Eurocode System * The Objectives Of The Eurocodes Special Topic On Eurocode 7 And Standardization - Eurocode 7 - A European Geotechnical Design Code - The Eurocode System * The Objectives Of The EurocodesBy Niels Krebs Ovesen Close economic cooperation was established among the countries in western Europe during the seventies. As a consequence, among others, a need for harmonized technical specifications for civil engineer Jan 1, 1994 
- 
                     Deep Foundations On Deer Island Deep Foundations On Deer IslandBy Michael W. Oakland Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts. Jan 1, 1994 
- 
                     List Of Exhibitors List Of ExhibitorsA technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall. Jan 1, 1994 
- 
                     Tied-Down Boat Section Construction Tied-Down Boat Section ConstructionBy Romano J. Micciche One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High Jan 1, 1994 
- 
                     Specialized Slurry Wall Equipment - The Hydromill - Summary Specialized Slurry Wall Equipment - The Hydromill - SummaryBy Mario Mauro The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l Jan 1, 1994 
- 
                     Errata (5268ac87-18a9-458e-b334-4f72060324e3) Errata (5268ac87-18a9-458e-b334-4f72060324e3)Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons' Jan 1, 1994 
- 
                     Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - Introduction Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - IntroductionBy Nino Catalano The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso Jan 1, 1994 
- 
                     1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers 1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papersBy J. Hartikainen 19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an Jan 1, 1994 
- 
                      
- 
                      
- 
                     Equipment Installation - Recent Developments: General Report On 'Installation Equipments' ? 1 Introduction Equipment Installation - Recent Developments: General Report On 'Installation Equipments' ? 1 IntroductionBy A. Paviani The subject of this session is "Equipment Installation, Recent Developments". This is a subject which is not usually addressed at conferences of Foundation Engineering. It is rare to find sessions Jan 1, 1994 
- 
                     4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction 4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. IntroductionBy B. De Paoli At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e Jan 1, 1994 
