Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • DFI
    Design And Testing Of Deep Foundations For Wind Turbines In Western Alaska

    By Lorie M. Dilley

    Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alaska villages, has made a concerted effort to install wind turbines in the villages they serve in an

    Jan 1, 2010

  • DFI
    Design Of An Unbraced Elliptical Slurry Wall Cofferdam For Deep Pump Station Construction

    By Gordon Chen

    As part of a value engineering envisioned by East Coast Slurry, Weidlinger Associates, Inc. designed a unique elliptical slurry wall cofferdam for construction of the 65 ft. deep MWRA North Dorchester

    Jan 1, 2010

  • DFI
    Design And Construction Of Shear Pins For Landslide Stabilization

    By Fei-chiu Huang

    A 17-acre landslide occurred in February 2001, on a slope below Via Bellota in the City of San Clemente, California. Three homes were destroyed and many others placed in jeopardy. The landslide, inv

    Jan 1, 2010

  • DFI
    Hammer-Grout Piles At The Bronx-Whitestone Bridge

    By Ameir Altaee

    Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho

    Jan 1, 2010

  • DFI
    Current Business Trends In The People's Republic Of China ? Synopsis

    By V. Tang

    In this paper, Chinese economic situation are estimated and prospective developments predicted to assist those US firms who have been trying to do business in China, or are considering to pursue the C

    Jan 1, 2010

  • DFI
    Selection And Quality Control Of Deep Foundations At Ontario Hydro's Darlington Nuclear Generating Station - Synopsis

    By F Debidin

    The progressive rise of an H-pile during driving of an adjacent pile is described in this case history in which piles 15 to 18 m long were driven to end-bearing for the foundations for a 230 m long bu

    Jan 1, 2010

  • DFI
    Meadowlands Megaproject: 9,000 Piles and Counting

    By Ronald D. Boyer

    "Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,

    Jan 1, 2009

  • DFI
    A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay Soil

    By W. Tom Witherspoon

    Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric

    Jan 1, 2009

  • DFI
    New I-95 Woodrow Wilson Bridge Foundations

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2009

  • DFI
    TRD Soil Mixing at Herbert Hoover Dike

    By George Burke

    "Many soil mixing methods have evolved over the years, but the Trench Cutting Re-mixing Deep method (TRD) was developed in Japan, circa 1993, to construct continuous uniform cutoff walls, without the

    Jan 1, 2009

  • DFI
    Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37

    By Gordon Chen

    The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the

    Jan 1, 2009

  • DFI
    I-470 Mine Remediation

    By Sheryl D. Gallagher

    The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the

    Jan 1, 2009

  • DFI
    Sustainability and the Future for the Deep Foundations Industry

    By Tony Suckling

    "As we head toward the United Nations Climate Change Conference in Copenhagen in December, the environment and sustainability will become headline news for a while. Governments are expected to agree t

    Jan 1, 2009

  • DFI
    Characterization Of Loess For Deep Foundations

    By Robert L. Parsons

    This paper describes the results of a detailed analysis of a loess deposit at the deep foundations test site established by the Kansas Department of Transportation. Multiple CPT, SPT, and pressuremet

    Jan 1, 2009

  • DFI
    Bridge Pier Remediation, New London CT

    By Walter Kaeck

    In a recent upgrade of their system, Amtrak converted a bascule type draw bridge over the Thames River to a vertical lift structure supported by the existing piers. During the bridge replacement, sign

    Jan 1, 2009

  • DFI
    DYNA Force-An Elasto-Magnetic Sensor For Force Measuring Of Post Tensioning Ground Anchors

    By Lucian Bogdan

    On many occasions during construction and service life of the structure, it is crucial to know the load in post tensioning tendons and anchors. Although there are many methods to measure the tendon fo

    Jan 1, 2009

  • DFI
    St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test Program

    By Jeffrey A. Gebhard

    As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes

    Jan 1, 2009

  • DFI
    Innovative Design At Lake Lenexa

    By Jacques Moraille

    The public is asking for more aesthetic designs if they can be proven cost-effective at providing an appealing element to new dams. Lake Lenexa was designed and built around the idea of providing for

    Jan 1, 2009

  • DFI
    Micropiles Take Off at Dulles Airport

    By Eric Rehwoldt, Walt Rabe, Jesús Gómez, Tim Myers

    "An expansion plan for Washington Dulles International Airport is currently underway to prepare for growth at this northern Virginia facility in the future. While Dulles currently serves more than 20

    Jan 1, 2009

  • DFI
    Design And Construction Of Drilled Shafts In Iraq

    By Frederick C. Rhyner

    The United States government sponsored the construction of a new vehicular bridge over the Diyala River in Bubriz, Iraq. This paper describes the geotechnical engineering for design and construction

    Jan 1, 2009