Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury Bridge
By Frederick C. Rhyner
Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw
Jan 1, 2004
-
PVC And Steel Access Tube Debonding During Sonic Logging Testing For The SC 170 Bridge Replacement Project
By Edward L. Hajduk
During sonic logging quality control testing of the drilled shaft foundations for the replacement bridges crossing the Broad and Chechessee Rivers for SC 170 in Beaufort County, South Carolina, irregu
Jan 1, 2004
-
Laterally Loaded Model Piles In Jointed Soft Rock Masses
By B. Francis
Literature provides only limited information regarding the behaviour of laterally loaded piles socketed into weak rock masses. A laboratory program, comprising a number of tests of scaled models of th
Jan 1, 2004
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History
By Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po
Jan 1, 2004
-
New Developments of Jacked Piles
By Victor Li, Joley Lam
"INTRODUCTIONJacked piles are piles that are pressed into the ground, usually by hydraulic jacks. For this reason, jacked piles are also known as pressed in piles. Jacked piles are mainly used for the
Jan 1, 2004
-
Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction
By Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2004
-
Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York City
By Willie M. NeSmith
Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp
Jan 1, 2004
-
Selection & Design Of Augered Cast-In-Place (ACIP) Piles
By Dan A. Brown
Outline ? Basic Concept of ACIP Piles ? Factors Affecting ACIP Pile Performance ? Applications: - Favorable Conditions - Unfavorable Conditions ? Design for Axial Loading ? Lateral Loa
Jan 1, 2004
-
New Tacoma Narrows Bridge Caissons (3b3023d3-bc2c-4a9b-8e78-d499291fb07f)
By R. Bruce Patterson
The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H
Jan 1, 2004
-
Non-Destructive Geophysical Evaluation Of Deep-Mixed Soil: A Computer Modeling Study
By David A. Staab
Numerical modeling was used to investigate the feasibility of using two geophysical imaging techniques, cross-borehole ground penetrating radar (XBGPR) tomography and electrical resistivity (ER) tomog
Jan 1, 2004
-
Advantages And Limitation Of Integrity Tests For Large Diameter Bored Piles In Bangkok Subsoil
By Narong Thasnanipan
In Bangkok due to the prevailing condition of subsoil (existence of considerably weak stratum at top part) deep-seated large diameter bored piles of over 50 m depth with 0.8 -1.8m in diameter have bee
Jan 1, 2004
-
Guide to Drafting a Specification for High Capacity Drilled and Grouted Micropiles for Structural Support
By Donald Bruce
The three types of specifications which are used for micropile work are: ? Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must
Jan 1, 2004
-
The Construction And Performance Of Post-Grouted Micro-Piles For Vancouver International Airport Domestic Terminal Building - Introduction
By Ernest Naesgaard
Post-grouted micro-piles were used for the seismic upgrading of the Vancouver International Airport Domestic Terminal Building (DTB). The micro-piles provided vertical resistance to both uplift and c
Jan 1, 2004
-
PSC Piles Overcome Challenges for $650m Power Plant
By Tim Siegel, III Fondren, Billy Camp
"INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic
Jan 1, 2004
-
Improvements In Deep Compaction Using Vibratory Pile Hammers
By Dennis Nottingham
Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971 L.B. Foster Company perso
Jan 1, 2004
-
Integrity Testing Methods
"Integrity tests refer to a variety of non-destructive tests (NDT) whose purpose is to measure or determine the quality and uniformity, and some- times dimensions, of cast-in-place concrete foundation
Jan 1, 2004
-
St Joseph Hospital Of Bellingham, Washington Addition Supported On Helical Pulldown Micropiles
By J. L. Goen
The Saint Joseph Hospital of Bellingham is located on a site underlain by glacial outwash. The construction of a five-story tower addition above an existing two-story wing was supported by five large
Jan 1, 2004
-
Anchored Pile Foundations In British Columbia
By Cory J. E. Yacyshyn
Anchored steel pipe piles are being used more frequently in British Columbia for shoreline projects such as public ferries, cruise ship docks, containership terminals and locally in the expansion of t
Jan 1, 2004
-
Introduction (10b9df94-8559-46e8-b74a-5e5ae2f990b0)
"The development of non-destructive testing (NDT) methods for deep foundations occurred in several parts of the world, gradually coming together into the present state of the art. The compilation of t
Jan 1, 2004
-
Load In A Drilled Foundation. Where Did It Go And When Did It Get There?
By Walter E. Vanderpool
Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.
Jan 1, 2004