Search Documents
Search Again
Search Again
Refine Search
Publication Date
Refine Search
Organization
-
Phase Composition of Gold from Massive Sulfides of the Semenov-2 Hydrothermal Field (13º31.13´N), Mid-Atlantic Ridge ? IntroductionBy I. Yu. Melekestseva
The Semenov hydrothermal sulfide cluster (13º31´N), consisted of five fields (Semenov-1, -2, -3, -4, and -5), was discovered in 2007 in the 30th cruise of R/V Professor Logatchev [Beltenev et al., 200
Jan 1, 2010
-
Pilot Mining Robot for Polymetallic Nodules and Pre-Pilot Mining TestsBy Sup Hong
A pilot mining robot, named MineRo-II, has been developed by KIOST during 2011-2012. The pilot scale was defined as 1/5 of the commercial mining capacity, 1.5 million dry-tons of nodules per year. The
Sep 14, 2011
-
Comparison Of The Tag Mound And Stockwork Complex With Cyprus-Type Massive Sulfide Deposits: Results From Leg 158 DrillingBy Mark D. Hannington
Drilling of the active Trans-Atlantic Geotraverse (TAG) deposit during ODP Leg 158 indicated that the size of the mound-stockwork complex is approximately 3.9 million tonnes, including 2.7 million ton
Jan 1, 1998