Site Procedures for a Blast Vibration Program and Impact AssessmentBy David E. Siskind
"This report describes recommended vibration monitoring and assessment practices at blasting sites.Intended is regular monitoring, tracking of trends, responding to complaints of alleged damage, and t
Jan 1, 1999
-
Development of Mining Explosives for Cominco OperationsBy W Russell
This is an account of Cominco's explosives development work spanning 20 years from the introduction of ANFO into underground operations through to the present day where the use of blasting agents and
Jan 1, 1982
-
General Requirement for Effective Overburden CastingBy James D. Cook, Dan McCutchen
Effective overburden casting requires the efficient use of todays explosives and initiations systems if a mine is to survive. This paper uses a major coal stripping operation as an example of the prop
Jan 1, 1994
-
Regulating the Velocity of Detonation of ANFO Utilizing Blends of Non-Explosive MaterialsBy Michael E. Curtis
This paper outlines a study performed to analyze the advantages of utilizing a blasting agent with a velocity of detonation that is 1.3 to 1.4 times the P-wave velocity of sedimentary shales and sands
Jan 1, 1997
-
Blasting Procedures, Veterans Administration Medical Center, Birmingham, AlabamaBy Beau Bryson, Tony Cooley
The following paper is a technical discussion depicting the type of blasting procedures used to control vibration levels. The blast vibration control criteria that was established and the type of moni
Jan 1, 1985
-
Drill/Blast Hands-On TeachingBy D Reid Watson
A unique blend of theory and hands-on teaching of blast hole drilling and explosives technology is being provided at a Canadian Community College. Students graduate at an apprentice level quite capabl
Jan 1, 1987
-
Mine Planning - Its Effect on Drilling and BlastingBy Alan R. Gadberry
Good mine planning is critical to the success of a safe, cost effective mine. Many factors contribute to the overall success of an open pit mining operation: proper pit location and development, good
Jan 1, 1981
-
Blast Optimisation at an Australian Gold MineBy Stuart Pether, Cedric Goode
The Mt Morgans Minesite is located 800km North East of Perth, the Capital City of Western Australia. The surrounding region has been a significant producer of gold since the turn of the century. The m
Jan 1, 1996
-
Potential Blaster Liability under CERCLABy Charles A. Kliche
The Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) established a national program for responding to releases of hazardous substances into the environment. The fu
Jan 1, 1997
-
Assessment and Mitigation of Ground Vibrations and Flyrock at a Limestone QuarryBy R M. Bhatawdekar, A I. Theresraj, H S. Venkatesh
Wadi Limestone Quarry is one of the largest captive mines of Associated Cement Companies Ltd, India. The mine management wanted to extend the excavation as close to the plant as possible for maximum e
Jan 1, 1999
-
Organization - Key to SuccessBy Sandra K. Penttinen
A difficult blasting project can go very smoothly when every precaution is taken prior to and during the blasting procedures. These precautions include conducting careful preblast condition surveys of
Jan 1, 1994
-
New Underground Drilling, Blasting and Mining Methods at the Manic-5 Additional-Power Hydro-Electric ProjectBy M Sampara, W Comeau
The introduction of large-diameter holes to underground mining has made possible the development of new mining methods such as the Vertical Crater Retreat (V.C.R.) method. It is not only the safest un
Jan 1, 1981
-
Blast Optimization for Improved Dragline ProductivityBy Hike Humphreys, Geoff Baldwin
A project aimed at blast optimisation for large open pit coal mines is utilising blast monitoring and analysis techniques, advanced dragline monitoring equipment, and blast simulation software, to ass
Jan 1, 1994
-
Blasting, Graphical Interfaces and UnixBy Dale S. Preece, Steven Knudsen
A discrete element computer program, DMC (Distinct Motion Code) was developed to simulate blast-induced rock motion. To simplify the complex task of entering material and explosive design parameters a
Jan 1, 1994
-
Residential Blast Complaint ReductionBy Sheila Luchansky, F M. Babcock, Daniel M. Sanders
A cooperative effort between a blasting vibration consultant, a blasting contractor, and personnel from the City of Las Vegas has dramatically reduced complaints from residential areas near developmen
Jan 1, 1993
-
Blasting Databases: A Unique Method for Saving and Retrieving Blasting DataBy Calvin J. Konya
Precision Blasting has designed easy to use, yet, highly powerful databases for storage and retrieval of blasting data. Three different Databases are available for blasting data management. The Vibrat
Jan 1, 1991
-
Blast Vibration Monitoring Instrumentation at Noranda MineralsBy David Sprott
The effect that underground blasting has on the stability of hangingwalls, pillars and other rock structures is an inherent part of Noranda's geomechanics and mine design program to improve mine safet
Jan 1, 1988
-
Blasting on the Iroquois TrailBy Charles Joyce, William C. Burkle, Dan Murphy
Rare indeed has a major cross country natural gas pipeline met and surmounted such obstacles as the Iroquois Gas Transmission Line from Canada to Long Island, New York. Of the 370 miles long length a
Jan 1, 1992
-
Geologic Data for Blasting at the Minntac MineBy John Eloranta
This paper is a case study showing the assembly of available rock property parameters for the purpose of blast design. Blast optimization now includes subsequent milling and requires a full knowledge
Jan 1, 1996
-
Semi-Automated Fragmentation AssessmentBy Glenn Ludwig, Stephen H. Chung
Fragmentation has a direct impact on mine costs and productivity. Computer programs have been developed to calculate fragmentation using data on the properties of the explosive, the characteristics of
Jan 1, 1992