Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Digital Detonators in Iron OreBy Keith Maki
This paper details a simple substitution of precise electronic timing in the holes for standard pyrotechnic delays. In addition, we wanted to use two electronics in bottom and top to test the collidin
Jan 1, 2007
-
Seismic Modelling Control Of Blasts In A Nuclear Power PlantBy Alain Blanchier, Pascal Bernasconi
Blasting operations took place on Channel coast NW of France to extend Flamanville Nuclear Power Plant (EPR new generation). The closest operating reactor building was monitored by a 24 remote vibrati
Jan 1, 2008
-
Experiences with Electronic Delay Detonators in Major Production BlastsBy Claude Cunningham
Ths oonoept of precise. eooursts timing with Elsotronic Delay Detonators (EDD’s) was first ssriously sddresssd in ths mid 80’s end much wss made of the cheapness end profusion of digital wstohes in te
Jan 1, 1994
-
Method for Developing Explosion Damage Potential Contours in Urban AreasBy Braden Lusk
The problem of predicting damage in densely developed areas due to incidental or malicious explosions is one of considerable importance to local, state, and federal governmental bodies. The difficulty
Jan 1, 2010
-
Journal: Effects of Temperature and Humidity on Airblast Sound Pressure LevelsBy Randal Martin
Recently, questions regarding the influence of atmospheric temperature and humidity levels on airblast levels have arisen at a number of blast sites. Humidity is alleged to have contributed to high le
Jan 1, 2001
-
Blasters Initiate Quality Control of ANFO at the BoreholeBy George E. Jackson
ANFO, as a blasting agent, is used in large quantities in coal surface mines. It can be purchased on the open market or through reliable suppliers. The blaster in the field must assume that his ANFO i
Jan 1, 1978
-
Simple Models for Gas Flow and Burden Movement During BlastingBy Italo Onederra, Jason Furtney, Ewan Sellers
The detonation reactions occurring during rock blasting result in high pressure gas phase products from the condensed explosives typically used in mining applications. After detonation and the initial
Jan 1, 2012
-
Use of a Scaled Concrete Model to Determine the Origins of Air OverpressureBy N. Skopak, W. Birch, A. Douglas, C. Johnson
Determining the origins of air overpressure has been a long-debated topic within the explosives engineering community. Historically, it has been accepted that the initial face movement gave rise to ai
Jan 1, 2024
-
Controlled Demolition of a Reinforced Concrete Building in Seoul, KoreaBy Kwang-Tae Kim, Yong-Kun Choi, Jeong-Soo Chong, Yun-Jae Lee
An annex building at the former Agency for National Security Planning(NSP) complex located in downtown Seoul was demolished by progressive collapse method. This work was done as a part of efforts to r
Jan 1, 1998
-
Evaluation of Environmental Effects Induced by Blasting Around a Waste Water Tunnel Project in High-Urbanized Area in TurkeyBy Ali Kahriman
This paper presents the results of ground vibration and air blast measurements from tunnel blasting activities during the construction of the Beylerbeyi-Kucuksu waste water tunnel under a residential
Jan 1, 2006
-
World-Wide Survey of Distress Blasting Practice in Deep Hard Rock MinesBy Marwan M. Mohammed, Hani S. Mitri, Wilfrid Comeaul, Baoyao Tang
In many parts of the world, rockbursts have become a major problem of mining at depth. As orebodies are being mined deeper, rockburst phenomena have become familiar to deep hard rock mines. Rockbursts
Jan 1, 1999
-
Technical Challenges of Close Proximity Blasting to an Active LandslideBy Aaron Nickoli, Brad Clark, Thomas Horan E. I. T.
The Canal Road Dip Slide is an active landslide located on South Pender Island, British Columbia. The effects of the fall 2021 atmospheric river prompted the British Columbia Ministry of Transportatio
Jan 26, 2026
-
Optimizing Drill and Blast Parameters for Enhanced Fragmentation and Cost Efficiency in Open Pit Mines.By Shadrack Nuamah, Erik Westman, Bright Afum, Jesse Addy
Rock fragmentation is the most critical aspect of hard rock production blasting due to its significant impact on drilling and blasting costs and the economics of subsequent loading, hauling, and crush
Jan 21, 2025
-
Attenuation of Ground Vibration Induced by Blasting at Can Open - Pit Lignite Mine in TurkeyBy Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Savas Gorgun
The principal disturbances created by blasting in open pit mines are vibrations, air blast and fly rock. All of them, under some circumstances, caused damage to structures nearby and apart from this c
Jan 1, 2001
-
Thedaveytronic-Theintegrated Electronic Delay DetonatorBy Rapheal Trousselle
For over 5 years, Davey Bickford has been developing and testing an electronic detonator blasting system. These new-technology detonators provide more accurate timing than conventional systems that re
Jan 1, 1997
-
Blasting For A Lokotrack SystemBy Roger L. Keller
Cautious, productive blasting is employed in the adaptation of a mobile crushing system extending into a highway through cut. In Hong Kong's final chapter of infrastructure development in preparation
Jan 1, 1998
-
Advancing the Environmental Acceptability, of Open Burning/Open DetonationBy K D. Sexton, T J. Tope
Manufacturers and users of energetic material (e.g., propellants, explosives, pyrotechnics (PEP)) generate unserviceable, obsolete, off-specification, damaged, and contaminated items that are characte
Jan 1, 1996
-
Optimizing Blast Hole Loading with MWD and 3D Image AnalysisBy Tristan Worsey, Brad Gyngell, Todd Buschjost, Gus Diehr
This paper highlights the opportunities provided by integrating MWD data and drone generated 3D model to industries that use explosive energy to perform useful work as an integral part of their rock e
Feb 1, 2020
-
A Modern Look at the Origins of Intra-plant Distance TablesBy Lon Santis
In 1923, Ralph Assheton compiled a report for the Institute of Makers of Explosives (IME) on accidental explosions in manufacturing plants. The report chronicles the type and amount of explosive invol
Jan 1, 2010
-
Regulatory Control of Blast Vibration Levels in the UKBy Rob Farnfield
In the UK all new developments, including mines, quarries, tunnels, etc., are subject to a system of planning control. If the use of explosives is anticipated then such developments will attract a num
Jan 1, 2005