    Optimized and Calibrated Migration to HXNBlast at Minera San Cristóbal

    By Javier Castaneda, Luis Zozaya, Noel Huarachi, María Rocha

    The objective of the project was to implement and calibrate drill and blast models supported by Geotechnical and Geological models as well as the mine and operation characteristics. The models would t

    Feb 1, 2020

  • ISEE
    Drilling Cost Optimization by Using a Water-Powered Drilling Technique at an Underground Sublevel Stoping Operation

    By Alexandra Yuyali

    The objective of this research work is to increase the drilling ratio represented in tons per drilled meter (ton/m) to reduce mining costs. One of the key characteristics of this research is the use o

    Jan 21, 2025

  • ISEE
    Impact of the Mine to Plant Methodology on the Global Profitability of the Mining Industry

    By Ronald Ticona

    Generally, the drilling and blasting operation are managed independently to the processing plant outcomes. Therefore, the technical segmentation to determinate the ore drill and blast designs do not i

    Feb 6, 2023

  • ISEE
    Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)

    By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin

    An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting

    Feb 6, 2023

  • ISEE
    Case Study: Mining Blast Information Management.

    By J Silva Castro, Braden Lusk

    Information management is important in all disciplines. In mining; collection and analysis of information before, during and even after mining is a keystone to performance. During mining, information

    Jan 1, 2012

  • ISEE
    Applying the Concept of Difficulty of Tunnelling to Brazilian Cases

    By Luiz Guilherme Isfer Maciel, Marilena Cardu, Fernando Golin, Jacopo Seccatore

    "This study applies the concept of the difficulty of tunnelling by drilling an blasting (D&B) to selectedcases from the Brazilian tunnelling industry. The difficulty of tunnelling has been defined in

    Jan 1, 2017

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004

  • ISEE
    Voronoi-based numerical investigation of fragmentation and gravity flow of SLC

    By Armin Iravani, Changping Yi, Matthias Wimmer, Daniel Johansson, Santiago Gómez, Håkan Schunnesson

    Sublevel caving (SLC) is a mass mining method based upon the utilization of gravity flow of blasted ore and caved waste rock. Drilling and blasting are the initial and the major impact on primary frag

    Feb 6, 2023

  • ISEE
    The Demolition of Genoa's Silos, An Example of Synergy

    By Amanda Verno, Danilo Coppe, Andrea Reggiani, Adolfo Bacci

    The methodological example that comes from the demolition of the Genoa grain silos, should not been considered as an auto-celebration of a difficult project successfully executed, but should serve as

    Jan 1, 2005

  • ISEE
    An Empirical Method of Comparing Brisance of Various Bulk Explosives

    By Neal Lee, Braden T. Lusk, Brendan McCray

    "Selection of a blasting agent for optimum performance is based on many variables. Often, a decision is made with regard to product cost and field testing. Defining optimum performance can be difficul

    Jan 1, 2017

  • ISEE
    Development of Scaled Damage Criteria for Blasting

    By Jorge Alvarez

    In a large-scale open-pit mining operation, continuous efforts are made to control damage to the slope walls. An essential tool in this effort is determining the PPVc (critical peak particle velocity)

    Jan 21, 2025

  • ISEE
    Cast Blasting Advances and Challenges at Arco's Black Thunder Mine

    By Robert L. Martin, Brian W. Stump

    "The Black Thunder Mine is located in the Powder River Basin of Northeastern Wyoming. Over 39.2million tons of coal were produced at the Black Thunder Mine in 1996. Just over 100 million pounds ofANFO

    Jan 1, 1997

  • ISEE
    Wall Control Blasting Practices at Kisladag Gold Mine

    By Ekin Güngor, Berkant Ozdemir, Erkan Bayrak, Serdar Ergün, Sedat Esen

    "This paper presents the final wall blasting practices at Eldorado Kisladag Gold Mine in Turkey. Benchmark and improved wall control designs were explained in detail. Kisladag Mine has been implementi

    Jan 1, 2017

  • ISEE
    Open Face Design Optimization

    By Owen Collins

    In surface mining, designing patterns to reduce the probability of flyrock and optimizing fragmentation through powder factor calculations are important for safe, efficient blasts. The designed powder

    Jan 26, 2026

  • ISEE
    Managing Risk – Evaluating Existing and New Tools Used in Industry

    By Kristen R. Bingham

    "Today, more than ever, drilling and blasting contractors are challenged to manage the ever-changing risks associated with blasting operations. New neighborhoods are encroaching upon mine sites and bl

    Jan 1, 2017

  • ISEE
    10th International Symposium on Rock Fragmentation by Blasting - Fragblast 10 (FB 10) 24-29 November 2012, New Delhi India

    By Agne Rustan

    The goal of this paper is to describe Fragblast 10 for those who did not have the opportunity to attend the Symposium and also give some examples of new research findings used in practise in some coun

    Jan 1, 2013

  • ISEE
    In-Transit Security, Technology & Best Practices

    By Mark Bauckman

    Discussion Topics • Market Needs • Technology Developments & Best Practices • Industry & Government Developments • Future Possibilities & Your Role

    Jan 1, 2006

  • ISEE
    Presplit Design Based on Borehole Pressures

    By Dr. Calvin J. Konya, Anthony Konya

    Beginning on the Niagara Power Project, presplitting became a widely used blasting technique to obtain smooth walls in mining and construction projects reducing scaling, creating more stable pits, all

  • ISEE
    Presplit Design Based on Borehole Pressures

    By Anthony Konya, Calvin J. Konya

    This paper will present this research which correlates the borehole pressure to variables such as the Young's Modulus and Tensile Strength of various rock types giving blast designers the ability to d

    Feb 1, 2020

  • ISEE
    Managing Production Blasting Vibrations: A Machine Learning Based Prediction of PPV in Chilean Copper Mines

    By J. Rafael Otaíza, Francisco Mardones

    This work has addressed the problem of creating a predictive model of the maximum particle velocities in the rock mass (PPV). The model designed specifically can model the subsequent vibrations of bla

    Jan 21, 2025