Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Unmanned Aircraft Systems Use in Blasting Operations

    By Lon Santis, Dale Ramsey

    The use of aircraft to support blasting operations in mines, quarries and construction sites goes back to the early days of aviation. Invaluable at times, aircraft use has been limited by cost, the un

    Jan 1, 2016

  • ISEE
    Energy-based Vibration Predictor Equations and Blast Damage Index for Blasting Gallery Panels

    By Sri C. Sawmliana, P. Pall Roy

    Damage to underground roof and pillars in blasting gallery (BG) panels has been an increasingly important area of study in recent years due to the invention of new explosives and cord systems which ha

    Jan 1, 2004

  • ISEE
    Rapid Raising

    By Jim Peterson

    Raising equipment that is commonly used include handheld drills such as Jacklegs or Stopers, Alimak raise climber also using handheld drills, drop raises using long-hole drills whether top hammer or I

    Jan 1, 2014

  • ISEE
    Journal: Junction Chamber Blasting November 22,1999

    By Edward Walter

    Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m

    Jan 1, 2001

  • ISEE
    A Practical Approach to Managing Control of Flyrock

    By Simon St. John Tose

    We have had a long history in supporting the development of training material to ensure “safe” blasting. This has been provided as both significant technical guidance to the industry and input into th

    Jan 1, 2013

  • ISEE
    Calibration of a Fragmentation Model for a New Mining Operation

    By Cristian Rodriguez, Tom BoBo, Maria Rocha, John Kemeny

    Blast fragmentation depends on many factors. First of all, it depends on the specific blast design, which includes the amount and type of explosive, the blasting pattern, the timing and sequencing, an

    Jan 1, 2014

  • ISEE
    Blast Designs and Instant Diagnostics Using the SVC1000 Digital, High-Speed Smart Video Camera System

    By Bruce Vandenberg, Andy Bartfay-Szabo, Steve Conway

    Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to 500 frames per second. Up to 8 seconds of data can b

    Jan 1, 1995

  • ISEE
    A Case Study Applying the Multiple Blasthole Fragmentation Model (MBF) at an Open Pit Mine

    By C. McAllister, D. Preece, J. Berendzen

    The Multiple Blasthole Fragmentation (MBF) model was developed recently and has been reported in previous papers. The MBF model accepts inputs from the blast design, such as: location and orientation

    Jan 1, 2016

  • ISEE
    Numerical Modeling of the Circular-Cut using Particle Flow Code

    By Young-Dong Cho, Yonghun Jong, Dong-See Shim, Seokwon Jeon, Chung-In Lee

    The most important operation in the tunnel blasting procedure is to create an opening in the face in order to develop more free surface in the rock mass. This operation is highly dependent on the cut

    Jan 1, 2005

  • ISEE
    A Safer and Green Detonator with NHN Substituting ASA

    By AN Gupta, N V. Srinivasa Rao

    Initiating devices like detonators use sensitive primary explosives. Successful detonation of secondary explosive is achieved by suitable source of energy from primaries. The most widely used primarie

    Jan 1, 2014

  • ISEE
    Blasting in Challenging Environments

    By Richard Goodridge, Stephen Thomsqn, S Rodgers, D Tunaley

    The mining, quarry and construction industries are facing’new challenges everyday. These challenges can be imposed by economic objectives or through external factors such as extreme geological conditi

    Jan 1, 1998

  • ISEE
    Improved Blasting Using Low Density Ammonium Nitrate Prills; Improved Fragmentation via the Use of Blast Controls Plans

    By Ron Frye, Carl Liibbe, Wayne Curtis, Julie Pecori, Dan Leach

    Test work comparing the performance of a Low Density Porous Ammonium Nitrate Prill to regular Porous Ammonium Nitrate conducted in Pennsylvania and New York showed that less ammonium nitrate was requi

    Jan 1, 1997

  • ISEE
    Journal: Coal Creek rebirth: Just add explosives

    By Michael Milstein

    Northwest Research Station said as more and more older dams are removed to benefit fish, it’s become clearer that rivers rework themselves quickly.“Where the dam is relatively small, it’s a quick resp

    Jan 1, 2010

  • ISEE
    Protection from Liability Before, During, and After Blast Detonation

    By Ralph E. Burnham, J. Kelly Ratliff

    "The words “dynamite,” “TNT,” “explosives,” and “blasting” typically cause the general public, andjurors, apprehension and fear. Although blasting operations conducted by well-trained, skilled, andexp

    Jan 1, 2016

  • ISEE
    Journal: 20th Annual Photo Contest / Boiler House

    By Ryan Redyke, Jared Redyke

    The demolition of an old power plant boiler house in Parsons, Kansas calls for the use of some linear shaped charges. The steel is thick and the structure is heavy but gravity can be a blaster’s best

    Jan 1, 2015

  • ISEE
    "Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"

    By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo

    For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish

    Jan 1, 2016

  • ISEE
    Tunnel Excavation on the Abutment of an Existing Dam

    To meet the energy requirements, hydroelectric projects are planned and executed in many countries. Though these projects requires a high capital investment, the returns are regular with minimum maint

    Jan 1, 2016

  • ISEE
    Journal: Safety Talk, The Blaster’s Duty of Care

    By William Reisz

    In our line of work,like many other professions, there may be times when circumstances or a series of events may arise, contributing toward unacceptable risk. When multiple parties are involved, there

    Jan 1, 2014

  • ISEE
    Wight Pit High Grade Wall Slash

    By Art Frye, Lee Pratt, Gaichang Zhao, Greg Newman

    This paper will discuss the Wight Pit wall slash at the Mount Polley open-pit copper-gold mine that scavenged a high grade block of ore from two double-benches of the pit wall. The Wight Pit orebody,

    Jan 1, 2011

  • ISEE
    Seismic Wave Frequency Filtering During Computer Modeling of Geophysical Charges

    By E. McCullough, D. Preece, M. Ortel

    The mining and oil industries employ techniques such as geologic mapping, core drilling and electromagnetic field techniques to explore for new deposits. New discoveries of major near-surface ore bodi

    Jan 1, 2013