Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Journal: Blastserve A Discussion Forum for ISEE Members

    Drilling through unconsolidated material I need to drill blastholes through a mix of consolidated and unconsolidated material. This material is hung up in an underground ore pass. The total length of

    Jan 1, 2011

  • ISEE
    Tunnel Lining Removal and Excavation by Controlled Blasting

    By Jeff Hammer, John McGregor

    "The Twin Tunnels, originally constructed in 1964, have become a major choking point for trafficheading up to and returning from the Colorado high country along the I-70 corridor. To increase traffic

    Jan 1, 2016

  • ISEE
    Highwall Safety

    By John C. Didlinger, John L. Didlinger

    As we begin the pre-blast survey we need to decide on the number of holes needed for production and a detailed highwall inspection. The survey consists of checking the highwall and placement of barrie

    Jan 1, 1996

  • ISEE
    Drone Technology Utilization to Increase Safety and Support Analysis for Blasting Process

    By Ery Wardhana, Stefanus Jagad, Relinda Sanistya, Hasucita Tausi, Rido Situmorang

    The blasting process is one of the most high-risk activities in mining operations. Shotfirers and blasting crews face hazards from slope failure, toxic gas and fumes, or unstable ground condition ever

    Feb 6, 2023

  • ISEE
    Journal: Blastserve, Look for the New Online Blasters Forum!

    Blastserve, ISEE’s Listserve is being replaced by our new Blasters Forum-online, an exclusive member benefit. Our goal is to provide an ISEE forum for you to network with your peers and exchange techn

    Jan 1, 2013

  • ISEE
    Applying the Concept of Difficulty of Tunnelling to Brazilian Cases

    By Luiz Guilherme Isfer Maciel, Marilena Cardu, Fernando Golin, Jacopo Seccatore

    "This study applies the concept of the difficulty of tunnelling by drilling an blasting (D&B) to selectedcases from the Brazilian tunnelling industry. The difficulty of tunnelling has been defined in

    Jan 1, 2017

  • ISEE
    Powder Factor vs Powder Distribution

    By Douglas R. Burns

    In New England, an area of the country where 3 ½" holes are considered large diameter,we are starting to experiment with 5" and 6" holes. The results are excellent in some areas and poor in others. Th

    Jan 1, 1997

  • ISEE
    Safer Blasting Using Electronic Detonators With Integrated Temperature Measuring Capabilities

    By G Mendoza, L Taddei, C Robertson

    It is a well-known industry fact that many mine sites around the globe experience blast holes that have elevated temperatures due to reactive ground, geochemical reactions, geomorphic reactions, sub l

    Jan 21, 2025

  • ISEE
    "Journal: 100 Years / Mining & Scientific Press San Francisco April 10, 1909 / Methods of Testing Electric Detonators"

    By William Nicoll

    Those who use electric detonators in firing blasts will be interested in a new electrical testing instrument known as the ‘Blasters’ Friend’, recently devised by the New York Blasting Supply Co. of Ne

    Jan 1, 2010

  • ISEE
    Breaking New Ground: Deflagrating Cartridges for Urban Tunneling at Grand Central

    By Joseph A. Meyers, Michael D. Stokes

    This paper will focus on the use of Deflagrating Cartridges for tunnel excavation in Midtown Manhattan at Grand Central and 42nd Street Station, where the excavation has challenges due to the proximit

    Jan 21, 2025

  • ISEE
    Perimeter Control Utilising Electronic Detonators

    By John Wall

    The use of electronic detonators in civil tunnelling applications, to reduce vibration is small firings has been successfully utilised for a number of years. As part of the mining industry’s commitmen

    Jan 1, 2012

  • ISEE
    Journal: Safety Talk / Standard Operating Procedures

    By Wm. Reisz

    There is no universal standard for Standard Operating Procedures (SOP’s). Every blasting operation has its own unique circumstances, its own methodologies and its own unique demands. It would be nearl

    Jan 1, 2010

  • ISEE
    Blast Design Analysis for Reduction of Boulders Production

    By Michael Karmis, Syed Muhammad Tariq, Zeshan Hyder

    This paper analyzes the blast design for lime stone quarries of two major cement plants in Pakistan. The production blast of these quarries was resulting in excessive boulders production. At some inst

    Jan 1, 2012

  • ISEE
    Vibration Data Analysis to Increase Slope Adhesion

    By August Ferraz Ribeiro, Guilherme Dias Mendona, Paula Henrique Lisboa, José Silvio Corsini

    Correct slope adhesion is related to the conformity of the slope’s real geometry to slope planning. It is very important in mining because slope design has economic and safety implications. Slope desi

    Feb 6, 2023

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004

  • ISEE
    Top Hammer Hydraulic Drilling Pushing the Practitioners' Envelope

    By William Hissem

    When we look out on our business landscape today, the words higher, faster, fdwther come to mind. Compliance issues, business integration, increasing production and profitability demands are convergin

    Jan 1, 2000

  • ISEE
    Seismic study to understand the pre-splitting filter capacity

    By Julio Cesar Barbosa de Freitas, Rafael Gonçalves Araujo, Túlio Soares, Jair Koppe, Augusto Ferraz Ribeiro, Pedro Barreto Garcia

    This study thesis was motivated by the fact that it is of fundamental importance for open pit mining that the slopes initially have a geometry in accordance with what is proposed in the mining plannin

    Jan 21, 2025

  • ISEE
    Pioneering with Medium Diameter Lifters

    By Luke Thornton, Jack Janssen

    An unconventional drill pattern is used in an aggregate quarry to reduce pioneering costs. The site is the Iron Mountain Quarry, Granite Falls, WA., an aggregate quarry with an annual production of in

    Jan 1, 1997

  • ISEE
    Journal: History of ISEE – Timeline / 35 Years

    1974 The Society of Explosives Engineers officially formed to “advance the art and science of explosives engineering” on August 20, 1974 in Pittsburgh, Pennsylvania.

    Jan 1, 2010

  • ISEE
    Vibration impact reduction to the community through low density bulk emulsion.

    By E. Líder, J. Pavez, J. Rivera

    The application of new technologies, methodologies, and the use of new products in mining operations is a practice that is becoming more common in the industry every day, added to the new challenges a

    Jan 1, 2024