Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Measuring Underground Face Drilling and Blasting

    By Thomas Barkley

    Recent developments in hardware and software have made accurate measurement of Underground Face (Development) Drilling a reality. New and compact laser profiling equipment makes it possible to measure

    Jan 1, 2003

  • ISEE
    Blasting-Related Carbon Monoxide Incident in Bristow, Virginia

    By Richard J. Mainiero, Marcia L. Harris, James H. Rowland

    In the past several years, there have been a number of blasting-related carbon monoxide migration incidents. In each case, there have been some common factors that appear to be related to carbon monox

    Jan 1, 2004

  • ISEE
    Quality: a New Approach to Improve Blasting Safety

    By John C. Brulia

    Blasting is both an art and a science with the primary objectives being safety and performance. Safety, the paramount objective, is a process that has limitless opportunities for improvement. Quality,

    Jan 1, 1993

  • ISEE
    History and Current Trends on Explosives Use for Avalanche Control in the USA

    By Bill Williamson, Doug Richmond, Kerri Kuntz, Gus Gilman, Larry Heywood

    This was a description by the poet of what occurred over two centuries earlier to Hannibal’s troops as he passed through the Alps. Interestingly, the pass that many feel is the route that Hannibal cho

    Jan 1, 2009

  • ISEE
    Optimization and Precision in Mining, The Simfrag Model

    By Jorge Cárdenas, Alejandro Luna

    In mining simulation for fragmentation results prediction is of utmost importance to study feasibility, ensure safety, and estimate the correct use of resources in drilling an explosive to meet requir

    Jan 21, 2025

  • ISEE
    Blasting and Comminution Choices for the Management of the Mining Business

    By Alexandre Passos, Giorgio De Tomi, Tatiane Marin, Dennis Cremonese, Jacopo Seccatore

    "In the mining industry, rock excavation is the first phase of the comminution process. Downstreamoperations such as secondary breaking, crushing and milling terminate the process, reducing the size o

    Jan 1, 2016

  • ISEE
    Journal: Haz Mat 101 / PART 3

    By Tom Snyder, John Brulia

    PART 3 – UN Identifi cation Markings for the Highway Transportation in Commerce of Bulk Explosives, Oxidizers, and Combustible Liquids

    Jan 1, 2015

  • ISEE
    Innovative Blasting - Oversize Reduction at the Timbarra Gold Mine in Australia

    By G. Hames, A. Drake, B. Sampson

    The Timbarra opencut gold mine is located about 30 km(19 miles) southeast of Tenterfield in northern NSW some 4 hours by car from Brisbane, the capital city of Queensland in Australia. It was a small

    Jan 1, 2003

  • ISEE
    Response of Un-Cracked Drywall Joints and Sheets to Blast Vibration and Weather

    By Jeffrey Meissner, Charles Dowding

    Cracking is one of the concerns cited by owners of structures adjacent to construction or mine blasting. During the past decade a large number of measurements have documented the low level of crack re

    Jan 1, 2011

  • ISEE
    Overpressure and Ground Vibration for Pipeline Construction Blasting - Measurements and Predictions

    By David Jones, Jeff Bregar, Damien Bell

    We have analyzed overpressure and ground vibration measurements for construction blasting for a large pipeline project. These field-measured levels have been compared to existing prediction curves in

    Feb 1, 2020

  • ISEE
    Dynamic Mud Flow Effects on Emulsion Explosives in Indonesia

    By Garfiansyah Rayes

    In 2023, an Indonesian coal mine experienced significant contamination of an emulsion blend explosive by dynamic mud and water flow, triggered by flooding due to exceptionally high rainfall. This intr

    Jan 21, 2025

  • ISEE
    Techniques for the Evaluation of Rock Mass Structure and Strength in Blast Design

    Blast performance is related to rock structure and strength, as well as to factors such as site geometry, drill patterns, explosives loading, firing sequences and delays.

    Jan 1, 1986

  • ISEE
    Electronic Blast Initiation Sequencing – Designing for Productivity

    By Greg Wyartt

    "At an Australian iron ore open-cut mine, 129 separate blast patterns (consisting of 38.5 million tonnes /42.4 million US tons, equaling 28% of annual blasted tonnes) were initiated using electronic d

    Jan 1, 2017

  • ISEE
    Garbage Plug Demolition Using a Low Detonation Velocity Explosive in “Presa Mixcoac” Dam, in Mexico City

    By Enrique Albarrán, Julian Hernández

    "In 1942 The “Presa Mixcoac” dam was built, along with 15 other dams, to control the rain fall waterin the mountains west of Mexico City. Mexico City’s population at that time was around 1.5 millionpe

    Jan 1, 2016

  • ISEE
    Using Internet Resources to Improve Claim Reports

    By Gregory Poole

    With access to the World Wide Web, many resources are readily available for improving claim reports. With a little time spent on line, a more thorough report can be created. Claimants will accept the

    Jan 1, 2006

  • ISEE
    Multiple Seed Waveform Vibration Model of blasts Established at Mont-Wright Mine

    By Joe Atalla, Leojenen Etulle, Jesse Desrochers, Joseph Mukendi Kabuya, Remi Proulx, Ruilin Yang

    The Mont-Wright mine is Canada's largest open-pit iron ore mine with multiple open pits in operation. It is operated by ArcelorMittal Mining Canada in the northeast of the province of Quebec, near the

    Jan 26, 2026

  • ISEE
    Iron Ore Company of Canada (IOCC) Blast Optimization with Emulsion Explosives

    By M Lemieux, R Mason

    The SABREX blast modeling program was introduced to I.O.C.C.'s Carol Lake Iron Ore Project in December 1987. As part of CIL's Technical Services, SABREX was used to implement an optimization program d

    Jan 1, 1989

  • ISEE
    Dutch Harbor, Alaska Unisea Quarry – Using Near Field Vibration Measurements to Improve Blasting Results Close to Structures

    By Mike Cammack, Logan Huppert, Gustavo Azpilcueta

    During the summer of 2015, Unisea Inc. sought proposals for the G1 Dock Replacement Project in Dutch Harbor, Alaska. It would be a one year project and construction was scheduled to begin in the sprin

    Jan 1, 2018

  • ISEE
    Blast Master Plan: the Key to efficiency and optimization. Case study at Ellatzite copper mine.

    By Grigor Mishev, Georgi Petrov, Benjamin Cebrian

    Before designing a single blast or all the blasts on a pit level, it is critical to assess the main goal on each. To do this, a series of constraints must be taken into account: wall protection, vibra

    Jan 1, 2016

  • ISEE
    Wireless Electronic Blasting

    By Daniel Mallette, Richard Goodridge, C M. Lownds

    Despite a world of mobile devices that has many of us taking the ability to communicate wirelessly for granted, an in-hole wireless initiation system was thought to be not viable. The known and common

    Jan 1, 2016