Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Journal: The Kingdom ImplosionBy Douglas Anderson
Even though there is always a feeling of anticipation before a blast is detonated, most blasts are part of a day’s work. Once in a while there is an event that impresses even the most jaded blaster. F
Jan 1, 2001
-
Changing the Landscape of Surface Mining through Fully Wireless Initiation SystemsBy Nolan Eckroade, Nigel Pereira
Wireless electronic blasting systems are a new technology that enable truly wireless initiation through rock, air and water. This is achieved using low frequency magnetic induction waves to wirelessly
-
Quarry Blast Permitting in the Urban EnvironmentBy Chris Breeds, Ken Johnston, Omar Fulton
This paper describes the process typically involved with obtaining permits for quarry blasting in urban, suburban, and rural areas, including: content of SEPA (State Environmental Policy Act) driven d
Jan 1, 2003
-
Effects of Aggregate Production Blasting on an Adjacent 42” (1.067m) PipelineBy John Babcock, Bryan C. Smith
In a partnership between Luck Stone Corporation and Loudoun Water, a 42” (1.067m) steel pipeline was constructed along the perimeter of an extensive permitted reserve of diabase rock Luck Stone was ab
Jan 1, 2019
-
Journal: 100 Years / FIG. 2. Bridge wrecked by material from blast near Chattanooga, TennBy Robert Hopler
A blast caused the destruction of a bridge and loaded freight train and the death of three men, near Chattanooga, Tenn., on May 16, 1907. The blast and its disastrous effect has been described by Mr.
Jan 1, 2008
-
Determination of Blast Vibration Limits by Direct Strain MeasurementBy Adrian Moore, Alan Richards, Andrew Brodbeck
Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str
-
BLASTCAD Three Dimensional Underground Blast Design SoftwareBy David Sprott, Patrick Andrieux
In 1990 the Noranda Technology Centre commenced a project to develop an interactive three-dimensional blast design system using a commercial computer-aided drafting and design package (CADD). The obje
Jan 1, 1991
-
Tigerwin Code, Thermodynamics and DetonationsBy Pr-Anders Persson
This chapter deals with the concepts of shock waves and detonation waves together, because a detonation wave is really a shock wave, supported by the explosive reaction that the shock wave ignites and
Jan 1, 1995
-
Thermodynamic Work Principal Overture — Not Just Rock n’RollBy Michael Wieland
The resolving capacity of the thermodynamic work-principal model has been seriously refined over its twelve year history, so a review of the innovations, wrong turns and their rectification is warrant
Jan 1, 2009
-
Blast Vibration and Seismograph Section - Location, Location, LocationBy Kenneth Eltschlager
Business says that location is a primary component of being successful. So too is the importance of location in blasting. For blast seismograph data to be useful, the location of the blast and seismog
Jan 1, 2004
-
Underwater Explosions: Effect of Boosters Shape to its Ability to Igninte Insensitive Plastic Bonded Explosives (IM - PBX)By Martti Hagfors
The Finnish Defence Forces Technical Research Centre (PVTT) studied the effect of shape of boost-er to its ability to ignite insensitive (IM) plastic bonded explosive (PBX). Therefore an explosive fac
Jan 1, 2013
-
A Study on Post Blast Generation of Nitrogen DioxideBy : D. Lawrence
Certain blasting applications are more prone to the generation of significant levels of nitrogen dioxide post blast fumes, more commonly referred to as after blast smoke, generally ranging in color fr
Jan 1, 1996
-
Tunnel blast drill hole surveying – Benefits and MethodologiesBy G. Adderley, A. Wetherelt
The problems of poor drilling in underground operations have been highlighted on many occasions. Incorrect collaring and poor angular deviation can all lead to an increased block size, dilution, over-
Jan 1, 2009
-
The Effect of Faults, Delay Time and Scaled Distance on Vibration ParametersBy Enver Alan, MerkeziYapı
People are migrating because of economic, social, natural and political reasons. These natural and humane factors effects the distribution of populations. The need for tunnels has grown in order to pr
-
Preparing a Written Blast Plan (1b8a88a8-1e7f-429f-bd71-b32f7b3dbf86)By David Ziegler
A formal blast plan is sometimes required for projects involving rock excavation. A written blast plan submitted with a bid proposal can also be an important sales tool. A blast plan will cover the ba
Jan 1, 2003
-
The Evolution of Mining and Drilling and Blasting Practices in GhanaBy Stanton Johnson
Africa has a long history of mining and has been one’of the world’s greatest sources of gold and other mineral resources since the days of the Egyptian pharaohs. Mining in Africa has been dominated by
Jan 1, 1998
-
Direct Calibration of the Heelan Model Using Vibration DataBy Jonathan Zimmerling, Rob Alkins
The model of waves emanating from a blast hole proposed by Heelan, and further developed by Blair and Minchinton, provides an approximation of particle motion in an isotropic, continuous and homogenou
Jan 1, 2013
-
Mining Industry and US Government Cooperative Research: Lessons Learned and Benefits to the Mining IndustryBy Robert Martin, Brian W. Stump, David P. Anderson, W Scott Philips
Since 1994, various mines in the US have cooperated with research scientists at the Los Alamos and Lawrence Livermore National Laboratories to address issues related to verification of the Comprehensi
Jan 1, 1997
-
Effect of Blasting on Impact Breakage of the Resulting Fragments - Results from Small Scale TestsBy P D. Katsabanis, S Kim
A number of small scale fragmentation tests have been conducted to analyze the effects of blasting effort on the grindability of granite, granodiorite, limestone and iron ore. Powder factors were modi
Jan 1, 2011
-
Vibration Control in a Tunnel Project under an Existing HospitalBy Pertti Paavola, Hikki Rasanen
This paper describes a very exacting tunneling project. Planning and technical realization of this service and transportation tunnel was especially difficult as a matter of vibration control, because
Jan 1, 1997