Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Study of Heat Resistant Commercial Explosives

    By Fumihiko Sumiya, Shinya Tanaka, Yukio Kato, Kenji Tanaka, Tetsuya Sawada

    When explosives are heated under an acidic environment due to metal sulfide and sulfuric acidity, their decomposition temperature falls remarkably and decomposition reaction occurs quickly, and then e

    Jan 1, 2003

  • ISEE
    Emissions from Explosives

    By V. Wetzig

    In the past, various investigations have been carried out at the Hagerbach Experimental Gallery under accurately reproducible conditions, in order to determine the emissions emanating from blasting op

    Jan 1, 2001

  • ISEE
    A Topographical Map of the Innovation Landscape (ABSTRACT PAGE)

    By Leon Lorenzen, Victor E. Ross, Anton W. Kleingeld

    "Key to successful innovation, whether at organization, industry or national level, is the alignment and utilization of resources in the most appropriate and efficient way. Innovation needs to be dire

    Jan 1, 2003

  • ISEE
    Professional Steps in the Blasting Process

    By Mark William Withey

    "Blasting safety in surface mining is a necessary industrial goal. Proper techniques and disciplinesexercised during the blasting process enhance the probability of achieving that goal.The blasting pr

    Jan 1, 1995

  • ISEE
    Description of Damage Constitutive Model as Documented in Pronto3D Manual 3/89

    By Billy J. Thorne

    The damage model in PRONTO simulates the dynamic fracture behavior of brittle rock. It is based on work started by Kipp and Grady, [lg] continued by Taylor, Chcn and Kuszmaul [I91 [20] and recently.mo

    Jan 1, 1989

  • ISEE
    Innovative Blasting Mine Life Extension at a Coal Mine in Australia

    By R. Bitmead, R Barker, A. Drake

    The opencut coal mine is located about 50 km west of Brisbane, the capital city of Queensland in Australia and produces about 140 000 tonnes per annum of high grade steaming coal utilising a small tea

    Jan 1, 2002

  • ISEE
    Elimination of Two-Pass Benching at Colowyo Coal

    By Alan Jorgansen, Dave Hummer, Scott Scovira

    Kennecott Energy's Colowyo Coal Mine is the largest open pit coal mine in Colorado and produces 5.5 MM tons per year. Colowyo uses the terrace mining method to recover up to seven seams of rolling coa

    Jan 1, 2003

  • ISEE
    Journal: Musings of a Safety Philosopher Relating to Blasting Safety

    By Ralph Dawson

    The following additions to SLP-4 “ALWAYS AND NEVERS” have been approved by the Board of Governors since the last printing 6/97 and will be included in the next printing soon. They are also included in

    Jan 1, 2001

  • ISEE
    Journal: Big Sky and Beyond Explosives, Avalanches and Regulations

    By Mike Boissonneault

    It was three years ago when the “storm of the century” had taken a firm grip over the Pacific West Coast and inland areas. At the Big Sky ski resort in Montana on Christmas morning two ski patrollers

    Jan 1, 2001

  • ISEE
    Modelling Non-Ideal Explosives with Detonation Shock Dynamics (DSD) Theory

    By Lars Arne Granlund

    Due to the coarse structure of mining explosives, one has to model a finite reaction zone,contrary to C-J calculations, describing their detonations, i.e they become dependent of diameter and confinem

    Jan 1, 1995

  • ISEE
    Deep Water Blasting on the River Nile in Southern Egypt

    By Rob Grant, Manuel Lopez Cano, Mike Briggs, Ken Fletcher

    The scorched desert sands and life giving waters of the River Nile in Egypt have been the back drop to awe inspiring engineering feats for over 4,700 years. The latest engineering marvel to grace the

    Jan 1, 2004

  • ISEE
    Response of a High-Pressure Natural Gas Pipeline to Coal Mine Blasts

    By Ed Clah, Catherine Aimone-Martin

    The vibration response of a 30 in. diameter high-pressure (845 psi) natural gas pipeline to 11 coal mine blasts was measured. The X-52 steel pipeline was buried 7 ft. below the ground surface. Ground

    Jan 1, 2003

  • ISEE
    Variations in Vibration Signals from Single Hole Quarry Blasts

    By Rob Farnfield, Yuill Gavin

    The rock blasting industry continues to be under pressure to reduce the level of vibration induced by the use of explosives. In recent years much research and development has been directed to minimizi

    Jan 1, 2001

  • ISEE
    Blasting Mitigation Measures Used to Control a Highwall Failure Risk

    By Jean-Sébastien Lambert, Joseph Kabuya, Richard Simon

    Managing a highwall failure risk in an open pit mine by controlling and mitigating the impact of vibrations produced by blasting operations is key to achieving safe and cost-effective operations. The

  • ISEE
    Discovery, Analysis, and Elimination of Instantaneous Misfires in Underground Production Blasts

    By Norman Disley, David B. Counter, Lionel Hebert

    Misfires in underground and surface production blasts can be costly. Costs can arise from loss of resource, production interruptions, having to redrill or otherwise refire the blast (a hazardous proce

    Jan 1, 1996

  • ISEE
    Journal: Blasting in the New Millennium: Blasters Take on the Role of Blast Site Manager

    By Steve Dillingham

    Today, a typical blaster is likely to wear many hats, including, but not limited to, supervisor, risk manager, safety coordinator, explosives engineer, communicator, as well as professional decision m

    Jan 1, 2001

  • ISEE
    Blast Simulation Surface and Underground with the SABREX Model (f3efe068-6266-482f-a4f6-907b809beffa)

    By G K. Jorkenson

    The SABREX Blast Modelling Program was developed joinlly by the companies of the ICI Explosives Group. of which C-I-L Inc. is a member. SABREX (Scientific Approach to Breaking Rock with Explosives) is

    Jan 1, 1989

  • ISEE
    Back to the Basics; Nonelectric Initiation Shock Tube Systems, Part 2: General Applications

    By Larry Schneider

    I n the simplest application of a shock tube initiation system, the tubing acts as a “relay line” which passes a detonation signal from borehole to borehole. When the signal arrives at each borehole,

    Jan 1, 1995

  • ISEE
    SEE Education Foundation (Scholarship Awards - 2004)

    By N/A N/A

    Aw a rd winners from the University of MissouriRolla. Back row from left: Seok Bin Lim, Chris B o l l i n g e r, Adam Kre s l e r, Scott Geer, Joseph Cohn, and James (Buck) Hawkins; Front ro w f rom l

    Jan 1, 2004

  • ISEE
    Preparing a Written Blast Plan

    By David Ziegler

    Rough sketches, field notes, an on-site conference or a phone call may no longer suffice to establish your blast plan at a job site. More and more, general contractors, site supervisors, owner re p re

    Jan 1, 2004