Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Signature Hole Analysis and Vibration Modeling: An Indonesian Case StudyBy Wawa Jaka Sungkawa, Slamet Rachman Jaka, Tom Dermody
A project was undertaken to research and develop a method to confidently predict vibration. It was decided that the scaled distance formulas were not adequate to predict vibration when using non-elect
Feb 1, 2020
-
Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision RegionsBy M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill
This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an
Jan 1, 2017
-
Seismic Modelling Control Of Blasts In A Nuclear Power PlantBy Alain Blanchier, Pascal Bernasconi
Blasting operations took place on Channel coast NW of France to extend Flamanville Nuclear Power Plant (EPR new generation). The closest operating reactor building was monitored by a 24 remote vibrati
Jan 1, 2008
-
Single Shot Drawbell Blasting with Electronic Detonators at FreeportBy Bonifacio Degay, Mike Lovitt
PT Freeport Indonesia is a block cave mine that now utilizes an advanced undercut method to set up the min in the Deep Ore Zone (DOZ). In this method a slice of rock (undercut) is broken such that it
Jan 1, 2004
-
Wall Control at the Freeport Grasberg Opencut Mine: Vibration and Gas Penetration Measurements as a Precursor to ImprovementsBy A. Spathis, I. Yacob, A. Labriola, G. Smith
Wall control is a significant issue for many mines. Improvements to the design process for blasts adjacent to temporary or final walls will require better measurement tools and predictive models. Oric
Jan 1, 2001
-
Overburden Blasting Vibrations: Analysis, Prediction, and ControlBy Otto E. Jr Crenwelge, Timothy A. Peterson
We have developed a site-specific method for analysis, prediction, and control of ground vibrations induced by overburden blasting operations in surface coal mines. Field tests conducted at R&F Coal C
Jan 1, 1986
-
Thiokol's Accublast Detonator: Precision Benefits the Industry can JustifyBy W B. Gregg
"A review, update, and expansion of Thiokol’s presentation at BAl’s Fiih High Tech Seminar titled ‘ADetonator - An Era of Precision in All-Electronic Detonators” is provided herein (and should be cons
Jan 1, 1995
-
Occidental's New Explosive Technology in Oil ShaleBy Thomas E. Ricketts
Occidental Oil Shale Inc. has spent the last eight years at its Logan Wash. mine near DeBeque, Colorado, developing its modified in-situ oil shale process for obtaining oil from oil shale. Modified in
Jan 1, 1981
-
Digitized, Integrated and Optimized Drill and BlastBy Sushil Bhandari, Amit Bhandari
In this paper, a case study is presented of a large global cement company using a cloud and mobile based platform across 17 of their mines consistently over a large number of users over a period of ov
Feb 1, 2020
-
Automatic 3D Fragmentation Analysis from Drone ImageryBy Andreas Gaich
A new 3D fragmentation analysis method for muck piles is presented. It works with aerial imagery from UAVs (drones) and handles entire muck piles with minimum user intervention.
Feb 1, 2020
-
Table Of Contents 2020 General ProceedingsBy NA NA
Copyright © 2020 International Society of Explosives Engineers
Feb 1, 2020
-
Attracting and Engaging the New Generations: An ISEE Student Chapter Case StudyBy Bethany Witter
In the past decades, a technological explosion has caused generational shifts. First, millennials experienced a technological shift to computers and cellphones. Next, Generation Z experienced a shift
-
Non-Ideal Detonation Modelling of Ammonium Nitrate-Based ExplosivesBy Paulo Couceiro
Highly non-ideal explosives usually tend to react expressively below their ideal detonation velocities. In these cases, dimensional effects and product heterogeneities become important to proper model
-
Improved Blasting Economics at an Uzbekistan Copper MineBy Viktor Aranovich, Thomas E. Brown
The Almalyk Integrated Mining and Metallurgical Plant is located near Tashkant in Uzbekistan and is one of the former Soviet Union's largest copper producers. Almalyk consumes about 10,000 metric tonn
Jan 1, 1998
-
Blast Optimization from Drone ImageryBy Markus Pötsch, Andreas Gaich
Optimization of surface blasting based on 3D models from drone imagery and a closed loop that starts with an automatic analysis of the geometry and the geological conditions and ends with an objective
Feb 1, 2020
-
Control of Blasting Spillage Through 3D Displacement Modeling in Open-Pit Blasting OperationsBy Hector O. Romero, Paulo C. Fernández A, Christian Rees Prado, Claudio C. Gajardo
In open-pit mining, estimating post blasting displacement and spillage accurately is essential to guarantee operational efficiency, ensure alignment with production plans and their associated key perf
Jan 26, 2026
-
Difficult Sinking Cut in Severe Winter Conditions Improves Productivity at Lac Des Iles MinesBy Cary Moffat, John Kita, Rick Walker
The Lac des Iles Mine, in an isolated area of NorthwesternOntario is a relatively new open pit platinum and palladium mine. They were encountering problems with the equipment and production scheduling
Jan 1, 1996
-
Cap Precision in Perimiter Control Blasting and the Potential Application of Electronic DetonatorBy Derek T. Novotny
Blasting cap precision is of major importance to advanced blast design. New technologies have introduced the use of microchips within detonator casings in the hope that the electronic control of the t
Jan 1, 1998
-
Application of Rudimentary Signature Hole AnalysisBy Michael Laing
Blasting regulation and restrictions are tougher today than ever before. When blasting in population centers, strict limitations are often placed on the environmental effects caused by blasting, more
Jan 1, 2017
-
The Use of Numerical Modeling to Enhance Fines PredictionsBy A. S. Tawadrous
Fines are produced in any blasting application. Depending on the application, fines may or may not be a desirable product of the blast. In most quarry and construction applications, fines are consider
Jan 1, 2012