Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Case History: Controlled Demolition of a Reinforced Concrete Structure in San Sepolcro, Italy

    By Roberto Folchi

    This note deals about the controlled demolition work for the dismantling of an industrial structure in San Seplocro, Italy. The structure to be demolished, the FLOWERS SILOS, consisted in a multilevel

    Jan 1, 1994

  • ISEE
    Explosive Destruction of an Underground Reinforced Concrete Bunker – Computer Hydrocode Simulation

    By Dale Preece

    A carefully designed and controlled in-place destruction experiment was performed on a concrete bunker buried in 4.27 m (14 ft.) of soil. The objective was to determine if the explosive charges would

    Jan 1, 2006

  • ISEE
    Diagnosing and Modifying Off-Site Blast Effects by Seismic Means - A Case Study

    By Stuart Brashear, Robert Brush, Ben Cook

    In early 1993, the Piney River quarry owned and operated by the Blue Ridge Stone Corporation of W W? Boxley received a series of complaints from the owners of a 130 year-old historic farmhouse that ha

    Jan 1, 1996

  • ISEE
    Effects of Electronic Detonators in Underground Tunneling Applications

    By Charles Zdazinsky

    Over-break is undesirable in underground civil construction because it excessively damages rock along the perimeter of the tunnel, which directly influences the cycle times of advancement. A quicker c

    Jan 1, 2015

  • ISEE
    Computer Based 3-D Blasting Analysis System

    By S Burchell

    During the past few years, high-speed cameras, laser surveying equipment and photogrammetry have become standard tools for recording blast geometry and results. While laser profiling yields accurate 3

    Jan 1, 1992

  • ISEE
    Lafarge Exshaw Finer Fragmentation Study

    By Jean-Guy Levaque, Robert Ethier, Ron J. Elliot

    This paper presents data gathered during a comprehensive study on the impact of improvements to fragmentation in a major Limestone quarrying operation. The full impacts of gains in fragmentation are t

    Jan 1, 1999

  • ISEE
    Full Wall Control Blasting Optimization

    By John Floyd, Maria Rocha, Benjamin Cebrian

    Wall control blasting is needed in most metal mining operations in terms of increasing mineral reserves and assuring the safety of the operation. This type of blasting has the goal to achieve a clean,

    Jan 1, 2018

  • ISEE
    Security and Control (476c288e-1831-4c21-a747-ee41961667e9)

    By Jim Mikelait

    Overview ?? Why do we need security? ?? Needs assessment ?? Elements to any security system ?? Protect, Detect, Alert, esponse ?? Electronic Security System Criteria ?? Advantages and Limitations of

    Jan 1, 2006

  • ISEE
    ISEE 32nd Annual Conference on Explosives and Blasting Techniques “Safety and Security”

    By Unknown

    Threats to Industry Theft Potential

    Jan 1, 2006

  • ISEE
    The Journal of Explosives Engineering Vol 21 No 3 - Dynamite Daze

    I was lucky to land a job in the powder business. I was looking for some way to support my wife and first child to be when I saw an ad in the Hercules magazine, “Explosives Engineer” for technical rep

    Jan 1, 2004

  • ISEE
    Unidelay Nonel Blasting System: a New Idea in Small Diameter Hole Blasting

    By K R. Sharpe, A Davitt

    CXA is currently evaluating, in co-operation with Inco Metals, a new idea in small diameter hole blasting - the Unidelay Nonel initiation system. In concept, the Unidelay system is a hybrid of the con

    Jan 1, 1982

  • ISEE
    The Mechanism of Blasting with Linear Charge

    By Feng Shuyu Yang Nianhua

    According to the results of high speed photography tests, particle velocity measurement tests and the digital calculation with TP2 software, the shape of shock wave, the declined laws of the shock wav

    Jan 1, 1997

  • ISEE
    Electro-Magnetic Induction Blasting System

    By Koichi Kurokawa, Takeo Ueda, Yoji Tasaki, Masashi Nakano

    We have developed a new firing system which simplifies the handling and extensively increases the safety in electric blasting operations. Based on the principle of the transformer, this system is oper

    Jan 1, 1986

  • ISEE
    Underground Coal Mine Seal Regulations Update

    By Braden Lusk, Kyle Perry

    Recent events and MSHA actions have resulted in discussion and reevaluation of the practice of sealing abandoned coal mine workings. In the past, MSHA has approved alternative seals based on a pass/fa

    Jan 1, 2008

  • ISEE
    Journal: Big Sky and Beyond Explosives, Avalanches and Regulations

    By Mike Boissonneault

    It was three years ago when the “storm of the century” had taken a firm grip over the Pacific West Coast and inland areas. At the Big Sky ski resort in Montana on Christmas morning two ski patrollers

    Jan 1, 2001

  • ISEE
    A Practical, Yet Technically Sound, Design Procedure for Pre-Split Blasts

    By William Hustrulid

    Pre-split blasting is a primary technique for creating slopes with a minimum amount of unwanted damage to the remaining rock mass. Rock slopes created in such a way have both safety-related and econom

    Jan 1, 2007

  • ISEE
    Borehole Geophone Method for Estimating Tunnel Blast Vibration Propagation

    By Kyle Ott, Bernard Daly, Syed Haq, Douglas Anderson, Parsons Brinckerhoff

    Drill and blast was determined to be the most cost-effective means of excavating the Raw Water Tunnel (RWT) for the Croton Water Treatment Plant in the Bronx, New York City. One of the major issues co

    Jan 1, 2012

  • ISEE
    Blasting in The New Millennium - Misfires The Basics Never Change

    By Steve Dillingham

    Whenever misfired holes or portions of misfired holes remain after a blast is fired, a hazardous situation exists until the unfired explosive materials have been disposed of properly. Yet, there are s

    Jan 1, 2004

  • ISEE
    The Use of Inexpensive Video Technology for Shot Analysis and Blaster Training in the Commercial Explosives Industry

    By Elliott A. Pood, Ron Gilbert

    Recent advances in digital recording technology have allowed frame rate increases in video recording equipment that provide the capability for super slow motion playback of commercial explosives shots

    Jan 1, 1996

  • ISEE
    The Electronic Detonator, Security, Handling, Effectiveness and Geophysics

    By Detlef Sulzer, Winfried Rosenstock

    "At the end of this century a great breakthrough in the field of blasting technology is finally going tobecome reality. That, in the true sense of the word, is the long expected and desired “HighTechn

    Jan 1, 1999