    An Analysis of Firing Time Scatter Effects on Vibration Simulations from Waveforms with Low and High Frequency Components

    By Randall M. Wheeler

    Many blasting companies are using simulated production ground vibration waveforms to aid them in the control of their vibration effects. The simulations are typically produced by using a seismograph t

    Jan 1, 1991

  • ISEE
    Controlled Blasting in Natural Geotechnical Structures (cavities) at the Hierro Mine - Brazil

    By Sérgio Augusto Ferreira, Alan Gerson Diaz Butron, Carlos E. Arroyo, Marcus Neves, Jorhs Enrique Casimiro Huayhua, Dieggo Santos, Eventomar Junior

    The presence of natural underground cavities is normally a characteristic of iron ore deposits, specifically in tropical deposits. Brazil and the United States are the only countries that have a legis

    Feb 6, 2023

  • ISEE
    Swedish Standards for Ground Vibrations and Airblast

    By Roger Holmberg, Donald Jonson

    The Swedish Standard SS 460 48 66, “Vibration and shock - guidance levels for blasting induced vibration limits”, is based on more than 50 years of experience from blasting close to structures and tun

    Jan 1, 2005

  • ISEE
    Near Borehole Fracture and Fragmentation Studies in Copper Porphyries

    By Catherine T. Aimone

    A series of experiments have been performed to characterize fragmentation and microcracking in quartz monzonite copper porphyry. The flyer plate impact method was used to generate plane shock waves in

    Jan 1, 1985

  • ISEE
    Designing Blasts with Uncertainty and Tolerance

    By Calvin J. Konya

    When blasts are designed, we normally assume the best case situation. We assume that all burdens and spacings will be properly drilled, holes will be properly loaded, initiators will fire at the nomin

    Jan 1, 1990

  • ISEE
    Effect of Fragmentation on Loader Efficiency

    By David Willock, S. Singh, Michael Glogger

    The efficiency of the loading system in a mine depends upon the characteristics of the muck pile, the loading machine specifications and the loading practices. The focus of this paper was to look spec

    Jan 1, 2001

  • ISEE
    Stratablasttm - A New Mining Method

    By T Goswami

    The conventional practice in open cut coal strip mining has been to blast the overburden or coal layers in separate blast events. This is done in order to maximise the benefits from throw blasting and

    Jan 1, 2006

  • ISEE
    Developments in Cast Blasting Using High Bulk Strength Explosives at Rietspruit Opencast

    By Mike D. J Bonneau, Malcom Jr Ford

    Rietspruit Opencast Services was one of the first opencast coal mines to successfully employ cast blasting to aid in the burden removal operation. Initial work on cast blasting began at the mine in 19

    Jan 1, 1991

  • ISEE
    Measuring Blast Movement to Reduce Ore Loss and Dilution

    By Darren Thorton, David Sprott, Ian Brunton

    Blasting causes movement of the rock and can be detrimental to the accurate delineation of the ore and waste regions within the resulting muck pile. The consequences can be ore loss and dilution. Howe

    Jan 1, 2005

  • ISEE
    The Explosives Industry and Governmental Nexus

    By Rhys Baker, Tim O’Brien, Joshua M. Hoffman

    This paper discusses this division of power as it relates to the explosives industry. Each branch is responsive to the public and the processes through which each promulgates regulation and legislatio

    Feb 1, 2020

  • ISEE
    Twin Pendulum-New Method to Simulate the Generation of Toxic Fumes

    By Gunnar Persson

    The borehole pressure/time history of blasting practice is simulated in a twin pendulum apparatus, where the expanding shotfiring gases force two steel slab swingers apart. A pilot installation built

    Jan 1, 1996

  • ISEE
    Anomalies in Blast Vibration Propagation

    By D T. Froedge

    With successive generations of the Iso-Seismic System, we are acquiring more and more information about the actual behavior of blast induced ground, and airborne vibration, as it propagates through th

    Jan 1, 1995

  • ISEE
    Improved Highwall Conditions, Optimum Colliery South Africa

    By AJ Rorke, JD Botes

    Presplit blasting in strip mines is aimed at creating a safer wall to work under during the coaling operations. Good quality presplits are also necessary for effective throw blasting and drainage of t

    Jan 1, 2000

  • ISEE
    Cross Sectional Shape Effects on Small Explosives Driven Shock Tubes

    By Ethan Steward, Robert Eades, Kyle Perry

    Shock tubes, either gas or explosively driven, are often used for physical modeling of free field explosions or arena testing. The use of shock tubes often requires less setup time of subjects and sma

    Jan 1, 2018

  • ISEE
    From "Powder Monkey" to Certified Explosives Technician: A Position Paper

    By Gregory S. Parker

    The explosives community has seen tremendous technological advances during the past several decades. When this industry was in it's infancy and even past, Powder Monkey's defied the odds by relying on

    Jan 1, 1995

  • ISEE
    Journal: 100 Years / DRIVING HEADINGS IN ROCK TUNNELS Transactions of the American Institute of Mining Engineers New York 1910

    By W. L. Saunders

    RBH Note: In the early days of drill & blast tunneling the jobs utilized large crews of drillers and muckers. Advance per round was limited (typically around four feet) but two rounds per 8-hour shift

    Jan 1, 2011

  • ISEE
    Presplit Assessment by Signature Hole Blast Vibration with Accelerometer Measurement

    By Remi Proulx, Ruilin Yang

    The effectiveness of presplit in soft or fractured ground is hard to visualize or quantify. There have been many attempts by the blasting community to measure and quantify the effectiveness of prespli

    Jan 1, 2019

  • ISEE
    New Technology in Vibration Measurements, Analysis & Data Management

    By D T. Froedge

    The latest development in vibration measurement equipment involves small microcomputer operated micro-sized seismographs. As the result of this there has been an explosion of the data generated by the

    Jan 1, 1994

  • ISEE
    Borehole Dewatering Techniques and Systems

    By David A. Bacca

    Hydraulically powered submersible borehole dewatering pumps and emulsion/ANFO blends evolved at about the same time and for the same reasons. Mining operators needed safe, efficient dewatering systems

    Jan 1, 1994

  • ISEE
    "Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"

    By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo

    For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish

    Jan 1, 2016