Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Problems and Solutions of Sewerline Construction in Residential Areas

    By Bill Runner, James T. Ludwiczak

    During the last few years, there has been a flood of local, state, and Federal government regulations concerning blasting. Many of the laws and regulations were written by individuals who know little

    Jan 1, 1979

  • ISEE
    Tug Fork Big Bend Cutoff Blast Monitoring Study

    By Charles E. Joachim

    Railroad and blast induced vibrations were measured in the vicinity of the proposed Big Bend Cutoff. Peak horizontal and vertical particle velocity relations were developed using least squares regress

    Jan 1, 1984

  • ISEE
    Journal: 100 Years / MILITARY ENGINEERING (PART IV) MINING AND DEMOLITIONS General Staff, War Office, 1910 LONDON Copyright

    By Robert Hopler

    SECTION 9.---BORING AND BLASTING.*155. Blasting is the operation of bringing down and detaching from its bed or position masses of material by means of explosives.

    Jan 1, 2011

  • ISEE
    Sappington Bridge: An Opportunity for Strengthening Research and Demolition Training

    By J. Baird

    The Sappington Bridge, a steel arch span bridge constructed in 1904 over the Meramec River, was demolished due to its advanced state of deterioration. The demolition was a project to benefit Crawford

    Jan 1, 2003

  • ISEE
    Blast Densification to Prevent Soil Liquefaction in Volcanic Avalance Debris for Construction of the South Coldwatercreek Bridge, Mt. St. Helens

    By Ron J. Elliott, David G. Otto

    This project involved deep blast densification of recent volcanic avalanche debris deposits consisting of a 43 meter thickness of loose clean to slightly silty sand, gravel, cobbles and boulders depos

    Jan 1, 1994

  • ISEE
    Chemically Sensitised Bulk Emulsions and Pump Systems Used in Hong Kong Underground Civil Works

    By Weyman CT Ngain, Brian J. Kennedy

    Innovative chemically sensitised bulk emulsion explosives and pump delivery systems have provided contractors participating in the highly competitive Hong Kong underground construction market with a s

    Jan 1, 1997

  • ISEE
    Air overpressure Prediction Equation for Construction Blasting

    By Calvin Konya, Anthony Konya

    State and Federal construction specifications require the Blasting Contractor to prepare a Master Blasting Plan which is reviewed by the Owner’s Representative. The Master Blasting Plan requires the

    Jan 1, 2015

  • ISEE
    On Board Excavator Dilution Detector

    By Benjamin Cebrian

    Traditional dilution control systems range from computer modeling, use of physical markers on the field as polypipes to a technology that marks some control points where displacement is measured. The

  • ISEE
    Safety in the Industry: Recent Development in the Classification of Eexplosives Precursors – The Modified Vented Pipe Test

    By David Kennedy, Noel Hsu, Miguel Araos

    The use of bulk explosive for mining applications started in the 50’s. Since then millions of tons of that material have been transported by road. However during that time, there have been several roa

    Jan 1, 2006

  • ISEE
    The Use of Electronic Detonators to Control Air Blast

    By Andy Hudson, Stuart Brashear, David Lilly

    Because of greatly increased timing accuracy, electronic detonator systems are a well-known and widely accepted major tool to control and reduce ground vibration. At a Southeastern quarry the authors

    Jan 1, 2009

  • ISEE
    Innovative Blasting - Oversize Reduction at the Timbarra Gold Mine in Australia

    By G. Hames, A. Drake, B. Sampson

    The Timbarra opencut gold mine is located about 30 km(19 miles) southeast of Tenterfield in northern NSW some 4 hours by car from Brisbane, the capital city of Queensland in Australia. It was a small

    Jan 1, 2003

  • ISEE
    Rapid Chemical Destruction of Explosives in Various Materials by MuniRem®

    By Charolett Hayes, A. L. Russell, Anthony J. Bednar, Jared Smith, Valentine A. Nzengung, Stephen L. Pilcher

    The manufacture of Energetics Materials (EM), including maintenance and demilitarization of munitions causes dangerously high levels of explosives residues to be harbored in building features. The two

    Jan 1, 2016

  • ISEE
    Blast Documentation Using the Techbase Database Management System at the Eastside Reservoir Project

    By Martin Chenoweth

    The Metropolitan Water District of Southern California (MWD) is undertaking one of the nations largest water management projects. The Eastside Reservoir Project is being built to insure a supply of wa

    Jan 1, 2000

  • ISEE
    Efficient use of energy to control bench damage

    By Elias Poulakidas, Marco Arellano

    The impact of a higher copper price on the open pit metal mining sector has derived in a faster and safer way in which the mining operation of broken and mineralised material is carried out. In this r

    Jan 1, 2008

  • ISEE
    Tunneling in a Sensitive Environment

    By Scott Stephenson

    Making a tunnel through solid rock can sometimes be a dangerous task. Many things must be considered in order to complete such a task safely, and efficiently. Prior to starting things must be known su

    Jan 1, 2009

  • ISEE
    Assessment of Perimiter Blasting at the Homestake Mine

    By J Deen, P Sterk, W Forsyth

    Homestake Mining Company has made a firm commitment to develop a functional and cost effective perimeter blasting program. The goal of the program is to develop smooth, sound walls in all development

    Jan 1, 1997

  • ISEE
    Design of Large-Scale Choked Destress Blasts in Mine Pillars Using the Empirical Destressability Index Methodology

    By Richard Brummer, John Hadjigeorgiou, Patrick Andrieux

    Some of the major challenges associated with underground mining at depth and/or under high extraction ratios are related to the resulting high stress levels, which can lead to the failure and collapse

    Jan 1, 2012

  • ISEE
    A Review of Current Blast Practices in Minnesota Iron Mines

    By James Keenan

    Mesabi Range blasting has evolved in over a century of mining. The obstacles including: hard and heavily jointed rock, bitter winters and frequent wet holes; combine to create a unique challenge for b

    Jan 1, 1996

  • ISEE
    Journal: Book Review / Micrometer Crack Response to Vibration and Weather

    By ISEE

    Micrometer Crack Response to Vibration and Weather, by Prof. Charles H. Dowding of Northwestern University, adds to Prof. Dowding’s already important contributions to the industry with his “Constructi

    Jan 1, 2010

  • ISEE
    Journal: Make a Good Impression / Pre-blast Surveys

    By Sandra Penttinen

    There are several ways to get a positive reaction from neighbors to blasting projects. When you need to enter structures to conduct a pre-blast inspection, the impression you make on the structure own

    Jan 1, 2006