Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Investigation of Ground Vibration at Gulyali Basalt Mine in Turkey

    By Ali Kahriman, Alper Celtikc, Serdar Celik, Tuncer Gungor

    This paper presents the results of ground vibration measurements carried out in Gülyali Hisarcik Basalt open pit mine located on the north side of the Anatolia near Ordu province in Turkey. Within the

    Jan 1, 2013

  • ISEE
    Quarry Blasting is Boring

    By Darcey Baker

    Quarry Blasting is usually boring, and that is how we like it. By this, boring means routine, straightforward, meat and potatoes blasting. Quarries typically will not utilize cast blasting, coyote tun

    Jan 1, 2009

  • ISEE
    An Improved Technique for Predicting Vibration Levels from Tunnel Blasting

    By W. J. Birch, M. Kirke

    Despite increasing competition from mechanical methods of tunnelling, the drill and blast method is often still the most viable method of excavating tunnels in strong and abrasive rock. To advance a t

    Jan 1, 2005

  • ISEE
    Design of Large-Scale Choked Destress Blasts in Mine Pillars Using the Empirical Destressability Index Methodology

    By Richard Brummer, John Hadjigeorgiou, Patrick Andrieux

    Some of the major challenges associated with underground mining at depth and/or under high extraction ratios are related to the resulting high stress levels, which can lead to the failure and collapse

    Jan 1, 2012

  • ISEE
    2004G Volume 2 - Hotshot Auto-Programmable Electronic Detonator System

    By Detnet Solutions

    1. “Daisy-Chain” concept The term “daisy-chain” stems from the fact that when the HotShot? detonators are connected there is a chain or electrical path for electrical current to flow from detonator A

    Jan 1, 2004

  • ISEE
    "Journal: GPS Signal Accuracy Improves"

    By Larry Schneider

    Are you one of the thousands of hunters, fisherman, or hikers who purchased handheld GPS systems over the past several years and then been disappointed in their accuracy and performance. Or maybe you

    Jan 1, 2001

  • ISEE
    Journal: Blastserve A Discussion Forum for ISEE Members - Vibration Criteria for Blasting Near Fish in Pools

    Dear All, I am looking for information about vibrations and effects on fish in pools. A tunnel blast is planned to be carried out as close as 300 meters to a freshwater fish growing plant. What is th

    Jan 1, 2012

  • ISEE
    The Mechanics and Physics of Electronic Blasting

    By H. Rossmanith

    This contribution introduces the fundamental concepts of wave propagation and fracture mechanics which form the basis of electronic blasting, i.e. precise initiation timing using electronic detonators

    Jan 1, 2003

  • ISEE
    Controlled Drilling and Blasting at Yucca Mountain - Design Implementation, Confirmation

    By Edward Fitch

    The DOE is evaluating Yucca Mountain, Nevada as a potential site for disposal of high level nuclear waste. Yucca Mountain is located approximately 160 km northwest of Las Vegas on the western edge of

    Jan 1, 2000

  • ISEE
    CSI: Will the Bombs Work? Will they Cause Property Damage? Will they Injure or Kill?

    By James Ludwiczak

    This paper consists of the conduct of a forensic criminal investigation of the components, construction, use, and functioning of two suicide bombs. As the title states, the task was to form profession

    Jan 1, 2007

  • ISEE
    Evaluation of Blast Damage to Pastefill at Louvicourt Mine

    By Hung Tran, Denis Fleury, (Ken) Qian Liu

    Pastefill technology has gained an increasing popularity over the past decade. The main advantages are: environmental performance (mainly in tailings disposal), low operation costs and ease of operati

    Jan 1, 2000

  • ISEE
    Thermodynamic Work Principal Overture — Not Just Rock n’Roll

    By Michael Wieland

    The resolving capacity of the thermodynamic work-principal model has been seriously refined over its twelve year history, so a review of the innovations, wrong turns and their rectification is warrant

    Jan 1, 2009

  • ISEE
    Journal: Safety Talk / Every Number Tells A Story

    By Paul Downing

    A typical day for a blasting company includes what seems to be an infinite list of tasks dealing with numbers. Whether determining the exact amount of explosives material in inventory, the number of h

    Jan 1, 2008

  • ISEE
    More Efficient Use of Your GPS

    By Wes Bender

    Considering the current interest in Global Positioning System (GPS) usage, it might be timely to look at a more efficient means of utilizing these instruments. The GPS system currently utilizes 28 sat

    Jan 1, 2002

  • ISEE
    Dilution Control While Maximizing Fragmentation in Gold Mines with the Use of Tracking Microchips Benjamin Cebrian

    By David Flores, Benjamin Cebrian

    This paper describes extensive engineering approaches to achieve both dilution control while not hurting fragmentation in the very hard, massive ore sections of a mine case study. Ore Tracker microchi

    Feb 1, 2020

  • ISEE
    Blasting Trials to Control and Monitor Displacement of Narrow Vein Gold Ore

    By P Geddes, K Grohs, C K. McKenzie, M Morrish

    Low grade surface gold mining at the Acacia Resources, Union Reefs Gold Mine in Australia's Northern Territory, involves the excavation of benches in three slices after blasting. Blast patterns span z

    Jan 1, 1998

  • ISEE
    Vibration Data Analysis to Increase Slope Adhesion

    By August Ferraz Ribeiro, Guilherme Dias Mendona, Paula Henrique Lisboa, José Silvio Corsini

    Correct slope adhesion is related to the conformity of the slope’s real geometry to slope planning. It is very important in mining because slope design has economic and safety implications. Slope desi

    Feb 6, 2023

  • ISEE
    Journal: Safety Talk / Flyrock Resulting From Surface Mine Blasting

    By Robert Morgan

    With improved methods for designing and detonating shots the potential for flyrock can be significantly decreased, but there are few absolutes in blasting; therefore blasters must learn from the mista

    Jan 1, 2001

  • ISEE
    Effects of Particle Size Distribution on Loading Performance

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Ertugrul Kaya, Kagan Ozdemir

    The results of bench blasting on quarries, have important influences on the performance of subsequent mining activities such as loading, hauling, crushing, grinding etc., and the total costs of that m

    Jan 1, 2008

  • ISEE
    Vibration Controlled Blast Timing Optimization Using the Seed Waveform Modeling Concept

    By Frank Sames

    Ground vibration levels are generally predicted using equations such as the USBM equation implementing the scaled distance concept and describing geological and blast design parameters in a ground tra

    Jan 1, 1995