Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improved Fragmentation and Safety with Proper Borehole Loading TechniquesBy Lars Osen
Both fragmentation and safety can be improved by following proper procedures in loading boreholes. Proper loading procedures such as primer location, borehole sealing, decking, and stemming along with
Jan 1, 1985
-
Primex Detonating Cord We Process Production MethodBy R C. Sittig
The manufacture of commerical detonating cord by the "wet process" technique is discussed. Raw material variability as a potential source of production problems is examined. Comparison to the "dry pro
Jan 1, 1976
-
Dust Control in Surface MinesBy John W. Brown
"Adequate dust control in and around rock drills is a problem that must be solvedfor the health and safety of workers running the drill as well as those working around thedrilling operation This paper
Jan 1, 1999
-
Solving Blasting Safety Hazards with Advanced TechnologyBy Ronald W. Roberts
For years, blasters have experienced near-misses, injuries, and yes, even fatalities as a result of the dangerous nature of our business. Yet, some blasters continue to portray the immortal attitude:
Jan 1, 1996
-
Rugged Emulsion Explosive Formulation #37 - Candidate PermissibleBy Michael S. Wieland, Thomas C. Ruhe
Delay blasting in underground coal results in shock waves traveling through the coal that can damage delay charges remaining in the blast pattern. Undetonated explosives which are dynamically desensit
Jan 1, 1992
-
Predictions of Fines Generated Around a Blasthole Using a State-of-The-Art Constitutive Model"Recently, an effort was made to calibrate the Riedel-Hiermaier-Thoma (RHT) material model to reproducethe behavior of granite under impact and explosive loading conditions. The study concluded that t
Jan 1, 2012
-
Innovative Blasting and Excavation of a Tailrace Channel at the Laforge Hydroelectric Plant James BayBy Mario Coderre, Andre Pinsonnault, Francois Lefebvre, Pierre Groleau, Yves Newman, Christian Pouliot
"This paper describes the blasting methods used to excavate the tailrace channel at theLaforge hydroelectric plant. It also shows the importance and versatility of the dopedemulsion explosives used in
Jan 1, 1993
-
Large Cast Blasting Programs Require Design FlexibilityBy Jeff Wachendorf
As the title implies, this paper details the start of a cast blasting and the design flexibility required to satisfy different parameters encountered on a large coal mine employing cast blasting as th
Jan 1, 2015
-
Kentucky's Training Program in Explosives and BlastingBy D T. Froedge
The state of Kentucky is making some changes in it's blasting program namely instituting a training program for blasters and instituting a new classification of blaster titled "Class A Kentucky Blaste
Jan 1, 1978
-
Penetration Analysis of a Shaped Charge Jet into a Concrete TargetBy Joseph Indeck, Seokbin Lim, Andrew Thompson
In the design of explosively driven penetration devices, understanding the impact conditions between the explosively propelled penetrator and the target is one of the most important steps in optimizin
Jan 1, 2011
-
Damage Causing Potential of Different Explosives"Blasting is an inherently destructive process and inflicts damage to the immediateperiphery of an excavation, which is later manifested as ground control and dilutionproblems. Different explosives re
Jan 1, 1993
-
Cast Blasting Around TownBy Jeff Wachendorf
As the title "Cast Blasting Around Town" implies, this paper details the starting of a cast blasting program in and around the town of Colstrip, Montana. As strip ratios have increased, the need to ad
Jan 1, 2009
-
Controlling Overbreak Through Vibration MonitoringBy Kaushik Dey
Bord and pillar is the most predominant method of wining of coal in Indian underground coal mines. Development heading in coal mines often encounters roof stability problem and results in roof overbre
Jan 1, 2008
-
Tunneling in Thinly Foliated Rockmass ConditionsBy G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
-
Radical Improvements to Blast Hole Drilling Cost and Productivity thru Integrated Teams (021b2c60-f412-46df-9bbc-00d582f72391)By R W. Thomas
This paper explores the possibilities of generating radical improvements in the drilling costs and productivity of blastholes through the efforts of integrated teams as opposed to traditional customer
Jan 1, 1996
-
Attenuation of Blasting Vibration in South FloridaBy Greg Mclellan, Mark Johnson, John Pepper
Several large quarrying projects recently occurred in Miramar, Florida. These were closely monitored by the Seismologist of Record and Broward County in accordance with County and City regulations. In
Jan 1, 2000
-
Problems with Malfunctioning BlastholesBy Calvin J. Konya
For proper blast design, one must make the assumption that all blastholes release nearly ideal energy. In many types of blasting operations, blastholes release very little useful energy. These blastho
Jan 1, 1988
-
Be Prepared, Respond Quickly to Blast ComplaintsBy David R. Ziegler
Blasting complaints are as unpredictable as human nature. Being prepared to speak to the complainant, and having a good idea of what you should say, or what NOT to say, may affect the evolution, and
Jan 1, 1998
-
Electronic Blasting & Blasting Management - Past, Present & FutureBy Frank Hammelmann, Peter Reinders
This paper briefly describes the past history of blast management. A modern blast management suite is then presented which demonstrates the current capability of the functional link between an electro
Jan 1, 2004
-
Near-Field Vibration MonitoringBy R Yang, P D. Katsabanis, W F. Bawden
Understanding the mechanisms which are taking place during the propagation of a stress wave generated by an explosive charge is of high importance in the detection, characterization and prediction of
Jan 1, 1993