Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Cumberland Gap Tunnels; Controlled Excavation With Complex Geology

    By Tom Short

    The contract to drive twin 4,100 foot (1250.5m) long tunnels under the existing Cumberland Gap highway was awarded to a Joint Venture of S.A. Healy of Chicago, Illinois and Lodigiani USA of Fairfax, V

    Jan 1, 1993

  • ISEE
    Preconditioning Modeling and Interaction with Explosives in Block Caving

    By Ismael Gottreux Vollet, Carlos A. Muñoz Lira, Alejandro Ferrada Vergara

    Currently, underground mining of deeper massive deposits with lower grades, harder rock conditions in high strength environments, entails difficulties in caving, fragmentation and seismicity of the or

    Jan 1, 2016

  • ISEE
    Innovation and Change in Quarry Blasting

    By Richard D. Love

    Competition in the aggregate industry of the 90's will be an over increasing really. With this in mind a quarry manager should always be comparing new and innovative concepts to increase productivity

    Jan 1, 1991

  • ISEE
    Drilling and Blasting in Tarsand

    By Bill Romanchuk, Real Doucet

    Suncor Inc. has been operating the first commercial tarsand open pit mine in the world since 1967. Drilling and blasting operations are required to facilitate overburden removal and tarsand mining by

    Jan 1, 1985

  • ISEE
    Blasting at a Superfund Chemical Waste Site

    By Douglas R. Burns

    During the summer of 1989, Maine Drilling and Blasting of Gardiner, Maine was contracted by Cayer Corporation of Harvard, Massachusetts to drill and blast an interceptor trench at the Nyanza Chemical

    Jan 1, 1991

  • ISEE
    PPV Management and Frequency Shifting in Soft Ground near Highwalls to Reduce Blast Damage

    By Shawn Kirkpatrick, Yang Ruilin, Tamara Whitaker

    In order to manage blast vibration in soft ground containing large diameter holes and large charge weights, a number of issues must be considered. This paper describes techniques to control and reduce

    Jan 1, 2009

  • ISEE
    Blasting to Initiate Block-Caving in Serpentine

    By Terry Matts, Henry Heidrich, Cluny Randell, Carl Kottmeier

    Until 1990, all production of asbestos ore at Cassiar was by open-pit methods. With the impending exhaustion of open-pit reserves, a decision was made in February 1988 to continue mining underground,

    Jan 1, 1992

  • ISEE
    Relating Explosives Sensitivity Laboratory Results to Field Tests

    By R R. Vendebeek

    The continuing evolution of explosives has most recently introduced emulsion explosives and heavy ANFO's to the market place. An explosives engineer has a multiplicity of explosives to choose from: dy

    Jan 1, 1987

  • ISEE
    Fumes from Detonation of Commercial Explosives in Boreholes and Steel Tubes

    By Bjorn Engsbraten

    Explosive charges have been fired under defined conditions in a closed tunnel. The explosives have either been detonated in a steel tube or a single borehole. In the latter case dimensions, -loading d

    Jan 1, 1980

  • ISEE
    A Booster Primer

    By Thomas P. Dowling

    With the increased usage of AN/FO type blasting agents and the introduction and development of non cap sensitive slurries, water gels and other types of blasting agents, proper initiation and boosteri

    Jan 1, 1981

  • ISEE
    House Response to Low Frequency Ground Vibrations from Coal Mine Overburden Blasting: a Technical Update

    By Steven V. Crum, Willard E. Pierce

    Concern has been raised about the adequacy of current regulatory guidelines designed to protect homes from unwanted blast damage due to low frequency ground vibrations; in particular those with predom

    Jan 1, 1995

  • ISEE
    Can Small Diameter Holes and Low-Density Product Improve Pre-Split Results?

    By Jim Daley

    This case history discusses a pre-split test conducted at BHP Mineralss Navajo Mine in Fruitland, New Mexico. The test was an extension of earlier pre-split testing conducted by Virgil Stachura of the

    Jan 1, 1996

  • ISEE
    Toxic Fumes from Shock-Damaged Permissible Explosives

    By Michael S. Wieland, Thomas C. Ruhe

    Marginal detonation of explosives can produce more toxic fumes with higher nitrogen oxides (NOx) than normal detonation. In delay blasting, shock waves from borehole charge explosions can impact those

    Jan 1, 1991

  • ISEE
    Blast Modifications at Island Copper

    By Cam B. Grundstrom

    This paper will describe blast design modifications that have been made at the Island Copper Mine, near Port Hardy, British Columbia. To date, two additional designs have been implemented in an effort

    Jan 1, 1994

  • ISEE
    Emulsion Powder Explosives

    By Jin Jingzhi, Wang Xuguang, Guan Li, Li Jianjin

    Emulsion explosives are gaining a wider and wider commercial market and are displacing other composite slurry technologies. However, the grease-like state and essential thermodynamic instability of em

    Jan 1, 1997

  • ISEE
    A Summary of Fatal Accident Due to Flyrock and Lack of Blast Area Security in Surface Mining, 1989 to 1999

    By D. K. Ingram, G. L. Mowrey, T. R. Rehak

    This paper summarizes flyrock and blast area security fatalities from 1989 to 1999 and examines the causative factors. Coal and nonmetal mining used about 43 billion pounds of explosives and blasting

    Jan 1, 2002

  • ISEE
    Components of Successful Test Blast Programs

    By C H. Dowding, P W. Linehan

    Many of the technical and non-technical or human problems associated with blasting can be minimized through a proper preconstruction test-blast program.

    Jan 1, 1986

  • ISEE
    Inside Job: Industrial Modernization Requires Blasting Indoors

    By Jerry R. Wallace

    A systematic, team approach to pre-blast and on-going problem solving contributed to the successful completion of this indoor industrial construction blasting project.

    Jan 1, 1995

  • ISEE
    Utilization of Pre-split to Dewater a Cut

    By Monica Stuckert

    Field studies were made at an Appalachia coal stripping operation to evaluate the differences in cost and performance between blast casting with pre-split dewatering versus conventional coal overburde

    Jan 1, 1985

  • ISEE
    Chemically Sensitised Bulk Emulsions and Pump Systems Used in Hong Kong Underground Civil Works

    By Weyman CT Ngain, Brian J. Kennedy

    Innovative chemically sensitised bulk emulsion explosives and pump delivery systems have provided contractors participating in the highly competitive Hong Kong underground construction market with a s

    Jan 1, 1997