Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Rock Drilling Safety - Bench Top Cleaning Versus Blasted Rock Debris Drilling

    By Amund Bruland, Vegard Olsen

    This paper presents analytical assessments around unintended misfire detonation, within rock debris drilling and bench top cleaning, primarily in the quarrying and mining industry. The main purpose of

    Jan 1, 2008

  • ISEE
    Instrumentation and Monitoring Criteria to Determine Structural Response from Blasting

    By H Y. Fang, H Sutherland, R M. Koerner

    Due to the increased number of complaints by property owners to blasting related industries an apparent need for a clearer understanding of blasting-related damage is needed. We feel that direct struc

    Jan 1, 1976

  • ISEE
    Journal: Blastserve A Technical Discussion Forum for ISEE Members / A discussion about cased wells.

    By Matheson and Miller

    Does anyone have any definitive information on vibration limits for damage to well casings near blasting? Also, are people using self-imposed limits when approaching cased wells? I can only tell you w

    Jan 1, 2010

  • ISEE
    Numerical simulation of blast demolition for steel construction

    By Y Wada, Y Ogata, T Nishida

    "Shaped charge is used for blast demolition of steel construction in general. It is important tocontrol movement of cutting part with shaped charge for the blast demolition of steel construction.Movem

    Jan 1, 1999

  • ISEE
    Charleroi Locks and Dam - Old River Wall Explosive Demolition

    By David Harrison

    The Charleroi Locks and Dam (Figure 1) was completed in 1932 and is located on the Monongahela River, approximately 22 miles (35 km) south of Pittsburgh, in Charleroi, Pennsylvania. It is comprised of

    Jan 1, 2015

  • ISEE
    HDAN and Gasified Emulsion Blends Improving Blasting at Peruvian Mines

    By Romel Villanueva L.

    "Peru does not produce ammonium nitrate; nevertheless it is a large consumer of both, porous prill (PP) and high-density (HD) varieties. Explosives cost is an important preoccupation in Peru, due tofl

    Jan 1, 2016

  • ISEE
    Underground Coal Mine Seal Regulations Update

    By Braden Lusk, Kyle Perry

    Recent events and MSHA actions have resulted in discussion and reevaluation of the practice of sealing abandoned coal mine workings. In the past, MSHA has approved alternative seals based on a pass/fa

    Jan 1, 2008

  • ISEE
    Drilling and Blasting Practices

    By Thomas P. Mahoney

    Phelps Dodge Corporation's Tyrone Mine is a large open pit copper operation located in the southwestern corner of New Mexico. The Tyrone concentrator processes approximately 50,000 tons per day of cop

    Jan 1, 1986

  • ISEE
    SDI Electronic Detonator System: All Spiced Up!

    This paper describes the circuit simulations based on SPICE of the SDI Electronic Detonator System at the system level. SDI is launching the Electronic Detonator System with a robust serial protocol e

    Jan 1, 2006

  • ISEE
    High.Speed 2D Analysis Program Version 1.30

    By Bruce Vandenberg, R F. Chiappetta

    "The High Speed 2D Analysis program allows the user to bring in data from several different sources. Of course, keyboard entry is included as a source. Other data is inputted through the serial port (

    Jan 1, 1989

  • ISEE
    Electronic Detonators and Lightning – part 2

    By C. Lownds, U. Steiner

    In 2008 a paper from the same source describing four actual cases of exposure of electronic detonators to lightning strikes was presented. It was shown that electronic detonators, like other initiatio

    Jan 1, 2009

  • ISEE
    Prediction of Fragmentation Based on Distribution of Explosives Energy

    In situ, most Taconite is heavily pre-fractured; because of the high cost of comminution of taconite, maximum fracture of pre-existing blocks is desirable. Sustained borehole pressure plays a signific

    Jan 1, 1995

  • ISEE
    Why We Keep Blast Reports

    By Paul Kunze

    For some of us, the most disagreeable part of being the blaster- in - charge is doing the required paperwork. Cost coding on time cards, drilling reports, magazine inventory logs, and blast records al

    Jan 1, 2004

  • ISEE
    Study of Blast Over-pressure from Intentional MEC Detonations Using Double Sandbag Mitigation

    By Daniel Haines, Benjamin Konshak, Michelle Crull

    American Technologies Incorporated Group (ATI) is the prime contractor with U.S. Army Corps of Engineers, Huntsville Center (CEHNC) in the Honolulu District for the removal of munitions and explosives

    Jan 1, 2008

  • ISEE
    2004G Volume 2 - Hotshot Auto-Programmable Electronic Detonator System

    By Detnet Solutions

    1. “Daisy-Chain” concept The term “daisy-chain” stems from the fact that when the HotShot? detonators are connected there is a chain or electrical path for electrical current to flow from detonator A

    Jan 1, 2004

  • ISEE
    Coal Loss Due to Cast Blasting--Implication on Mine Economics

    By Sarma S. Kanchibotla

    In overburden cast blasting the explosive energy is used to move a significant percentage of overburden from the high wall to the spoil pile thus reducing the amount of material to be handled by machi

    Jan 1, 1999

  • ISEE
    Applications of Geophysical Wireline Logs to Blasting

    By E W. Kohler

    Geophysical wireline logging of blastholes provides useful geological data and has considerable potential to improve overall blasting control and costs. This paper uses case histories to show how logg

    Jan 1, 1988

  • ISEE
    Mine Blasting Accident Update

    By Larry R. Fletcher, John W. Kopp

    The safety record for explosives in U. S. mining is excellent considering that over 4 billion pounds of explosives are now being used each year. However, blasting accidents remain one of the most seri

    Jan 1, 1991

  • ISEE
    Large Hole Rotary Drill Performance (c77e5de0-de67-47fa-9ab6-1a7cb81cfd58)

    By J Lyall Workman, Peter N. Calder

    Large hole rotary drilling is one of the most common methods of producing blastholes in open pit mining. Large hole drilling generally refers to diameters from 9 to 17 inch (229 to 432 mm), however a

    Jan 1, 1996

  • ISEE
    Fragmentation and Throw due to Blasting – Role of Initiation Systems

    By K. Ram Chandar, Vedala Rama Sastry

    Fragmentation and muck pile profile together play an important role in optimizing the excavation costs for given geo-mining conditions. Initiation system is one of the vital parameters influencing the

    Jan 1, 2008