Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Digitized, Integrated and Optimized Drill and Blast

    By Sushil Bhandari, Amit Bhandari

    In this paper, a case study is presented of a large global cement company using a cloud and mobile based platform across 17 of their mines consistently over a large number of users over a period of ov

    Feb 1, 2020

  • ISEE
    A Quantitative Triple Bottom Line Mine to Mill Process Evaluator

    By X. Gumede

    A model is being developed to quantify the benefits for mining houses resulting from the reduction in greenhouse gas and energy consumption by the application of innovative blast designs in addition t

    Jan 1, 2012

  • ISEE
    Air Decking at Duvha, a Technical Evaluation

    By S A. Steyn, P Terrett

    Air decking has become a widely practised method internationally for modifying fragmentation results and providing cost savings from reduced explosive consumption. Duvha has been applying air deck tec

    Jan 1, 1995

  • ISEE
    Relative Shock And Heave – Underwater, Rock And Thermodynamic Irreversibility

    By Michael Wieland

    The work principle from thermodynamics is used to model the shock and heave for explosives shot in rock or under water, with the latter compared to reported results. The work principle utilizes restri

    Jan 1, 2007

  • ISEE
    The Reliability of Peak Particle Velocity Analysis Methods

    By N. Powell, P. Hunt, A. Wetherelt

    This paper considers the current methods of analysis employed, the validity of assumptions made and the reliability of results and predictions derived; where appropriate, alternative methods are propo

    Jan 1, 2003

  • ISEE
    The Truth About Signature Hole Method

    By Thierry Bernard

    Since the signature hole method principle has been described in the 80's, there has always been a lot of controversy about it. The theory is easy to understand but when it comes to apply it for predic

    Jan 1, 2012

  • ISEE
    Blasting Conditions Couldn't be Worse

    By John Atkinson, Steve Repola

    This paper will describe two blasting plans that have been developed for American Aggregates' Marble Cliff Quarry located near Columbus, Ohio. Two different limestone formations are mined on different

    Jan 1, 1993

  • ISEE
    Utilization of Aerial Drones to Optimize Blast and Stockpile Fragmentation

    By Ran Tamir

    "This document introduces the use of drone generated aerial photography to collect and analyze fragmentation data for both muck piles and post crusher stockpiles in order to support the continuousimpr

    Jan 1, 2017

  • ISEE
    Control of air overpressure from quarry blasting? - It about time.

    By Shazad Hosein, Rob Farnfield, Bill Birch, Liam Bermingham

    The propagation of a shock wave through air as a result of quarry blasting consists only of one type of wave, the compression wave. This is in marked contrast to seismic waves where a number of differ

    Jan 1, 2012

  • ISEE
    The Didcot Demolition

    By R. Alford

    In the modern world of demolition safety is paramount and unnecessary or unquantifiable risks are not accepted (FasterCapital, 2024) and all risks must be kept As Low As Reasonably Practicable (ALARP)

    Jan 21, 2025

  • ISEE
    Standard of Care for Blasting Negligence

    By Timothy Stark

    Blasters are usually strictly liable for injury or damage caused by flyrock (trespassory invasion) and blast-induced vibrations (non-trespassory invasion). The application of strict liability to non-t

    Jan 1, 2003

  • ISEE
    Blasting Solutions For Rapid Mine Expansion

    By Stephen Mansfield, Johannes Schoeman

    In August 2006 a technical alliance was formed between Orica Mining Services and Century Mine to provide blasting solutions. The alliance is in the form of a Rock to Specification (R2S™) service, one

    Jan 1, 2010

  • ISEE
    A Tiered Approach to Mitigating the Environmental Effects of Underwater Blasting (ISEE)

    By Thomas M. Keevin, Gregory L. Hempen

    Natural resource agencies, under various regulatory authorities, are challenged with permitting underwater explosive use while at the same time protecting aquatic resources. Deciding on whether or not

    Jan 1, 1995

  • ISEE
    Traffic Tunnels in Rock - Guide Levels for Blast-Induced Vibrations

    By Sven-Erik Johansson, Gosta Rundqvist, Donald Jonson

    In Stockholm a new road traffic system called Södra Länken (Southern Link) will be in operation in late 2004. The total length of the road system is 6 kilometres of which 4,5 kilometres run through tu

    Jan 1, 2004

  • ISEE
    TNT Equivalence and Fragmentation Mechanisms of High Pressure Gas Fracturing Technique

    By Baohua Guo, Xuelin Yang, Tingkan Lu, Hailin Sun

    The work presented in this paper mainly involves two parts. Firstly, the fundamental characteristics of the high pressure carbon dioxide gas fracturing technique (CO2 technique), including, a proposed

    Jan 1, 2017

  • ISEE
    Numerical Investigation of Blasting Fume Characteristics in a Block Caving Mine

    By Yong Pan, Purushotham Tukkaraja

    Block caving is a preferred underground mining technique due to its high production rate and low operation cost. Before its final step into a mature caving system using gravity to break rock, drilling

  • ISEE
    Influence of Rock Mass Properties on Blast-Induced Rock Movement

    By Behrouz Ohadi, Kamran Esmaeili, Bibhu Mohanty

    In most metalliferrous open pit mines with heterogeneous orebodies, blast-induced rock movement is a crucial outcome that has unfavorable impact on ore and waste segregation in the post-blast muck pil

    Jan 1, 2018

  • ISEE
    Comparison of Compliance Measures for Blasting near an Industrial Structure Vibration Monitoring Standards Connected to the use of Explosives in Different Countries, Part III

    By C. Aimone-Martin, C. Dowding, M. Jern, J. Gjødvad

    This article compares percentages of compliance for six national standards to demonstrate how these standards vary on-site in a real project. This, to the best of the authors' knowledge, has not been

    Jan 1, 2024

  • ISEE
    Summer Internship Project at an Underground Gold Mine

    By Tristan Worsey

    This work was performed during the summer of 2008 during the junior year of a BS in Mining Engineering. It was observed that the mine was having a problem with back break during the blasting of develo

    Jan 1, 2010

  • ISEE
    Displacement Control of Uncrushable Materials from Underground Mining Interacting with Open-Pit Operations Through Three-Dimensional Simulation

    By Hector O. Romero, Paulo C. Fernández A, Christian Rees Prado, Claudio C. Gajardo

    In open-pit mining operations, the presence of remnants from past underground labors represents a significant operational challenge, especially if they are in the surroundings of high-grade zones. The

    Jan 26, 2026