Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The Evolution of Loading 4 1/2 Inch Diameter Upholes at Kidd Creek No. 1 Mine

    By R Malo, A Yetter

    The use of large diameter blastholes for underground mining began approximately twelve years ago and are now routinely employed in a variety of ore types and stope designs. These large boreholes, rang

    Jan 1, 1984

  • ISEE
    A Definition of Criteria Required to Evaluate the Results of Production Blasts

    By Norm Tienkamp, Normand Martineau

    Through the normal course of operation, mine operators are living situations where blast results need to be measured. It becomes the supervisory group responsibility to select evaluation parameters wi

    Jan 1, 1996

  • ISEE
    Determination of the Initiating Strength of Commercial Detonators Using an Explosive of Adjustable Sensitivity

    By J Edmund Hay

    Previous work by the Bureau of Mines to develop a test for determining the initiating strength of commercial detonators has been modified and extended. Recently reported results by the Bureau used a

    Jan 1, 1993

  • ISEE
    Wall Control at the Freeport Grasberg Opencut Mine: Vibration and Gas Penetration Measurements as a Precursor to Improvements

    By A. Spathis, I. Yacob, A. Labriola, G. Smith

    Wall control is a significant issue for many mines. Improvements to the design process for blasts adjacent to temporary or final walls will require better measurement tools and predictive models. Oric

    Jan 1, 2001

  • ISEE
    Underground Applications Using the New EZDrifter Dual Delay Detonator System

    By Pierre L. Labelle

    Non electric Dual Delay initiators have revolutionized many aspects of underground mining. The units are used in all types of underground blasting operations. Some operations, due to the complexity an

    Jan 1, 1994

  • ISEE
    The Effect of Fragmentation on Loader Productivity (95e8fe1a-7252-44f9-b557-30f0369d4449)

    By Michael D. McGill, Jeff Freadrich

    There are many factors which affect the productivity of a front end loader. One of the most obvious is the characteristics of the material being mined. Characteristics such as size distribution, swell

    Jan 1, 1994

  • ISEE
    The Influence of Geology on Blasthole Deviation (0b527217-6b23-477f-8c0b-03e530d5c921)

    Blasthole deviation is a frequent, well documented and undesirable occurrence in mining operations. It is caused by the drill string mechanics, operating variables and the interaction between the dril

    Jan 1, 1996

  • ISEE
    Single Decoupled Blasthole Tests and the Significance of the Results to Presplitting and Boulder Busting

    By Syed M. Tariq, John W. Wilson, Paul N. Worsey

    The position of a major joint in relation to a blasthole has a significant effect in presplitting. Broad research into the combined effects of firing two decoupled blastholes has been performed in the

    Jan 1, 1996

  • ISEE
    Vibration Control During the Construction of an In-Pit Lime Kiln (8311e31c-6f16-4a2a-8cda-6570ebbd2b33)

    By Paul Worsey, Ron Ecklecamp, Scott G. Giltner, Ronnie Inman, Terry Drechsler

    A blast monitoring program conducted at Chemical Lime Companys new lime calcining facility near Ste. Genevieve, Missouri is discussed. The purpose was to develop blasting criteria for the construction

    Jan 1, 1996

  • ISEE
    Vibration Controlled Blast Timing Optimization Using the Seed Waveform Modeling Concept

    By Frank Sames

    Ground vibration levels are generally predicted using equations such as the USBM equation implementing the scaled distance concept and describing geological and blast design parameters in a ground tra

    Jan 1, 1995

  • ISEE
    Advantages and Disadvantages of Down-the-Hole Hammer Blasthole Drilling vs. Rotary Drilling in Large Scale Open Pit Surface Mining

    By George D. Raitt, Rudy Lyon

    Until fairly recently, Down-The-Hole (DTH or DHD) hammer drilling was never really a factor in large scale open pit surface mining. It was a method confined to water well drillers, aggregate quarries

    Jan 1, 1998

  • ISEE
    Energy Factor - The Next Logical Step

    By Chad Ducey

    The proper utilization of energy in an explosive column is of paramount importance to the success of any blast. Historically, Powder Factor (the weight of explosive per mass or volume of material to b

    Jan 1, 2000

  • ISEE
    Expandable Packaged ANFO in the Field

    By Donald E. Rossow

    In the mining industry ANFO continues to be the primary source of explosive energy. The three most commonly used loading methods are bulk, pour in 50 lb. multiwall bags and cylindrical shaped wet hole

    Jan 1, 1985

  • ISEE
    Explosives Contractors the Insurance Non-Industry

    By C Robert Scott

    Yes - We have figures on Explosives Manufacturers ! But, on the 500 or 600 explosives contractors, unless you happen to specialize in shooting oil wells, we have no numbers. As you know, the Insurance

    Jan 1, 1980

  • ISEE
    Size Matters on the Mesabi Range

    By Thomas Palangio, Lyall Workman, Jack Eloranta, Tom C. Palangio

    The fragmentation distribution of the blasted ore is an important descriptor of blasting results. Traditionally it has been hard to measure quantitatively. Developments in image analysis over several

    Jan 1, 2007

  • ISEE
    Cap Testing at the Minntac Mine

    By Jack Eloranta

    To improve control of blasting, tests were performed to assess non-electric cap accuracy. Simultaneous testing using a Velocity of Detonation Recorder (VODR), Red Lake LoCam and an Instantel DS-677 bl

    Jan 1, 1992

  • ISEE
    Journal: 100 Years / THE ENGINEERING AND MINING JOURNAL New York July 27, 1907 / Shot-firers, and Evils of Solid Shooting

    By George Harrison

    A great many labor leaders and others advocate shot-firers as the acme of relief for all the dangers connected with solid shooting, and where large quantities of powder are used in one blast in coal m

    Jan 1, 2008

  • ISEE
    The Influence of Time Error of Electric Detonators on the Amplitude of Vibration Generated by Blasting

    By Kis M

    The purpose of seismic control of blasting is to indicate the vibration magnitude or to eliminate the occurrence of vibration damage caused by blasting. At the Mining Research Institute in Hungary, a

    Jan 1, 1979

  • ISEE
    Staggered Parallel Cut in Small Headings the Most Cost-Reducing Alternative to All Other Cuts in Mechanized Drifting

    By Max Pena Woolcott, Winfried Rosenstock, Maria Chappuis, Walther Hennig

    "In a Peruvian-German Technical Cooperation project for the Mining Sector the ""Milpo-cut"" along with the electric initiation system has been successfully implemented in a Peruvian metal-ore mine.Spe

    Jan 1, 1994

  • ISEE
    Journal: 100 Years / “The Mine” by the Rev. Isaac Taylor New York, W.B. Gilley 1829 Boring

    By Roland Oliver

    Detonators or blasting caps are made in several different grades of strength, because some powders require not only a greater, but a different initial detonation than others to convey their maximum en

    Jan 1, 2007