Effects of Accurate MS Delays on Productivity, Energy Consumption at the Primary Crusher, Oversize, and Ground Vibrations and AirblastBy James W. Reil, Douglas A. Anderson, Steven L. Burchell
A total of 26 full-scale production blasts at three sites were extensively monitored with sophisticated instrumentation systems to determine the benefits of "ore. accurate detonators. The new and "ore
Jan 1, 1989
-
Experimental Investigation on Forced Transition of Gaseous Explosives from Combustion to Detonation in PipesBy Chen Aiping, Wei Banyun, Chen Canchang
"The gaseous explosives consisting of combustible gas and combustion-supporting gas wereused in the opening end of a steel pipe and the ignition was in the closed end of the pipeusing continuous air f
Jan 1, 1993
-
Evaluation of the Fragmentation Size Distribution Resulting from Blasting as Derived from Basic PrinciplesBy Roger Favreau, Patrice Favreau
The article reviews the aspects which contribute to the quality of the results from a blast with explosives, namely a good floor, no large blocks, easy mucking, and explains the mechanisms of the blas
Jan 1, 2012
-
Controlling Blast Vibration Effects with On-Site Analysis of Single Hole Signatures: "A New Approach"By Randall M. Wheeler
Computer analyses of single hole signatures are often used to help blasting operators predict the type of ground vibration effects that may be produced from production blasts incorporating various del
Jan 1, 1989
-
Controlled Underwater Blasting in Santos Port, BrazilBy Paulo José Costa Couceiro Junior, Manuel Lopez Cano
The biggest Port of Latin America - the Santos Port in São Paulo, Brazil - has been drilled and blasted by controlled underwater techniques in order to remove around 40,000 m3 (52,318 cubic yard) of r
Jan 1, 2016
-
Knocking Down Barriers to QRA AcceptanceBy Jorge Flores, Dean Nichols
Some view quantitative risk assessment (QRA) as difficult to understand and complicated to use. They are comfortable with the proven reliability of quantity distance (QD) and question the benefits of
Jan 1, 2015
-
Optimization of Blasting Pattern in an Underground Coal Mine for Maximum Production with Minimum Roof DisturbanceBy R. Singh, M. Roy, D. Singh
Success of a blasting pattern in Blasting-off-the-solid (BOS) in Bord (Room) & Pillar method of coal mining is judged by the percentage of pull achieved vis-à-vis the yield of coal produced in a blast
Jan 1, 2003
-
A Simple Method of Determining Site-Specific Safe Decking Procedures in Order to Avoid Dynamic Pressure Issues When DeckingBy Neal Lee, Braden T. Lusk, Brendan McCray
Determining the minimum amount of inert material that can be used between explosive columns is a complex problem. Using too little inert material can result in detonator/primer failure, either by symp
Jan 1, 2016
-
Improved Blast Results with Variable Density, Gassed EmulsionsBy L D. Lawrence, R S. Day, Gordon Coleman
Commercial emulsion explosives are typically characterized by their relatively high detonation velocities due to the intimacy of oxidizer and fuel and to their sensitization with glass microballoons.
Jan 1, 1990
-
Advanced Technology for Blast Design, Execution & AssessmentAQUILA Mining Systems Ltd., designs, develops and delivers systems for measurement, analysis, simulation, control and automation to the mining, construction and petroleum industries. The objective of
Jan 1, 1994
-
Numerical Modeling of the Circular-Cut using Particle Flow CodeBy Young-Dong Cho, Yonghun Jong, Dong-See Shim, Seokwon Jeon, Chung-In Lee
The most important operation in the tunnel blasting procedure is to create an opening in the face in order to develop more free surface in the rock mass. This operation is highly dependent on the cut
Jan 1, 2005
-
Blasting Vibrations and Explosives PerformanceBy B Mohanty, R Yang
Blasting vibration information is now commonly used to diagnose blast malfunctions. These range from limiting vibration levels to protect normal dwellings to determining scatter in detonator firing ti
Jan 1, 1997
-
Mining and Fragmentation: Proposal for a More Efficient Mine ManagementBy Ivan Carrasco, Benjamin Cebrian
Mining companies have traditionally organized their structure around a scheme easy to manage: Mining Department and Mill Department. In a challenging landscape for mining, with decreasing grades, incr
Jan 1, 2014
-
Breakthrough in the Portrayal of Explosive EnergyBy Claude Cunningham
Difficulty has always attended the evaluation of rock breaking energy available from explosives, owing to the complexity of the way in which it is released, and the destructive amplitude of the pressu
Jan 1, 2000
-
Transient Vibration and Complaints an Emperical Study of Coal Mine DetonationBy Gerald R. Coonan
Laboratory research is being conducted to substantiate suggested levels for voluntary standards on human response to transient vibration. The application of those findings to actual field conditions,
Jan 1, 1982
-
Quantification of Production Quarry Blasting - the Search for the Most Effective Blasting TechnologiesBy S C. Brashear, D A. Anderson, A P. Ritter, S R. Winzer, R Broughton
Results of quarry blasts can be quantified to show the effects of controlled variables. Two studies have been carried out: one to document the effect of delay on fragmentation and the other to show th
Jan 1, 1985
-
Demolition of the ADMP-1 Jackup Platform for Aramco in the Arabain GulfBy J S. Brower
Disposing of the AMDP-1, Jackup drilling rig in the Arabian Gulf.
Jan 1, 1978
-
Numerical Design Optimization of Electric Discharge Impulse Crushing MethodBy Hideaki Kitajima, Daisuke Fukuda, Kazuma Moriya, Katsuya Sasaki, Katsuhiko Kaneko
The purpose of this research is to analyze the fracture process and achieve design optimization of a splitting method for concrete and rocks termed the electric discharge impulse crushing method (EDIC
Jan 1, 2011
-
Civil Tunnelling with Electronic Blasting Systems - Early Experience in KoreaBy Dave Kay, Young-Suk Song
To meet the needs of South Korea's rapidly expanding economy, a large number of infrastructure projects are under way to improve transportation efficiency within the nation. These projects include hig
Jan 1, 2005
-
Prediction of Fines in Mining and Quarrying Applications Using the Fracture Density Model (FDM)By C. Mick Lownds, Dale S. Preece, Ali Bhuiyan
FDM (Fracture Density Model) is a three-dimensional mechanistic model of blast induced rock fragmentation. FDM uses several computational mechanics algorithms to simulate the effect of blasting in dif
Feb 6, 2023