Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Drilling and Cost Analysis Usign a Personal Computer and Spreadsheet

    By William D. Hissem

    The purpose of this paper is to advise people about the methods, use, and possible applications of current "personal computer" hardware and software with regard to the economic cost analysis of percus

    Jan 1, 1986

  • ISEE
    Dugout Blasting for Livestock Water

    By Mike Cammack

    Western South Dakota is predominately an agricultural area, with exception of the mining and timber industries in the Black Hills region. With precipitation rates averaging below fifteen inches per ye

    Jan 1, 1993

  • ISEE
    Considerations in Pre-Split Blasting for Mines and Quarries

    By J Lyall Workman, Peter N. Calder

    "Presplitting is a technique mines and quarries may use to produce high quality final pitwalls. Damage from backbreak can be minimized, thereby insuring the final pit walls standat the designed angle.

    Jan 1, 1993

  • ISEE
    Certification Knowledge and Experience Requirements for Blasters

    By John R. Coulson

    A survey of federal and state licensing requirements for blasters employed on the surface and underground was conducted for the Bureau of Mines. Subdivisions include surface and underground (large and

    Jan 1, 1980

  • ISEE
    Effects of Blasting Vibrations on Uncured Concrete Foundations

    By Thomas A. Simpson, Yung-Kwaun Jow, Dennis L. Gamble

    Construction of the $200 million Riverchase Galleria Mall in Hoover, Alabama was started in early 1984. The construction area consists of about 70 acres. The extensive building complex requires heavy

    Jan 1, 1985

  • ISEE
    Developments in Cast Blasting Using High Bulk Strength Explosives at Rietspruit Opencast

    By Mike D. J Bonneau, Malcom Jr Ford

    Rietspruit Opencast Services was one of the first opencast coal mines to successfully employ cast blasting to aid in the burden removal operation. Initial work on cast blasting began at the mine in 19

    Jan 1, 1991

  • ISEE
    Effects of Blasting Vibrations on Uncured Concrete Foundations

    By Thomas A. Simpson, Yung-Kwaun Jow, Dennis L. Gamble

    Construction of the $200 million Riverchase Galleria Mall in Hoover, Alabama was started in early 1984. The construction area consists of about 70 acres. The extensive building complex requires heavy

    Jan 1, 1985

  • ISEE
    Non-Electric Shock Tube and Optimizer Initiation Systems, Applications and Hookups

    By Tom Treleaven

    This guide presents numerous patterns that provide 8 millisecond separations between initiated charges. The guide is tabulated in seven sections to provide quick reference by number of decks or bunch

    Jan 1, 1997

  • ISEE
    Using Internet Resources to Improve Claim Reports

    By Gregory Poole

    With access to the World Wide Web, many resources are readily available for improving claim reports. With a little time spent on line, a more thorough report can be created. Claimants will accept the

    Jan 1, 2006

  • ISEE
    Rugged Emulsion Explosive Formulation #37 - Candidate Permissible

    By Michael S. Wieland, Thomas C. Ruhe

    Delay blasting in underground coal results in shock waves traveling through the coal that can damage delay charges remaining in the blast pattern. Undetonated explosives which are dynamically desensit

    Jan 1, 1992

  • ISEE
    Blast Modeling with DMC-BLAST - Open Pit and Underground

    By Dale Preece, Stephen Chung

    The DMC-BLAST (Distinct Motion Code) has been developed for modeling bench blasting to one or two free faces such as choked blasting in surface gold operation and cast blasting in coal mining, respect

    Jan 1, 2000

  • ISEE
    Advanced Blast Modeling for Mining Steeply Dipping Coal Seams

    By Dan L'Heureux, Joe Haid, Stephen H. Chung

    Most coal deposits in Western Canada involve steeply dipping multiple seams. An efficient way to recover coal seams would be to drill through the seams and blast both the overlying and underlying wast

    Jan 1, 1998

  • ISEE
    Mine To Mill Process Integration And Optimisation – Benefits And Challenges

    By Walter Valery, Sarma Kanchibotla

    Due to the global financial crisis, the world economy has turned upside down and most major economies in the world are facing severe recession for the past one and half year. During this period most c

    Jan 1, 2010

  • ISEE
    Precision Presplitting: Explosive Load Variations with Spacing

    By Calvin Konya, Anthony Konya

    Presplitting is a form of blasting that when executed properly will create a smooth wall that will minimize secondary conditioning. In recent years, presplitting has become a popular technique to be u

    Jan 1, 2017

  • ISEE
    Interior Explosive Model Evaluation for Application in Probabilistic Risk Assessment

    By Natalie Zeleznik, Brian Hawkins, David Bradley, Rachel Gooding, Patrick Wilson, Brian Somes, Kevin Wegman

    "To perform a probabilistic risk assessment (PRA), a method of quantifying the risks associated withinfrequent high consequence events, consequence models that generate representative estimates of hum

    Jan 1, 2017

  • ISEE
    Blasting Related Aggregate Size Optimization

    By John Cory, Ran Tamir

    Blasting data analytics are being increasing used to increase mining productivity, reduce mining costs, maximize high margin aggregate products, and to reduce fines. Three examples will be illustrated

    Jan 1, 2012

  • ISEE
    Stealing Thor's Thunder Lightening: Myth vs. Reality

    By C W. "Mickey" Bradley

    Thunder strikes terror in the hearts of man and has since the advent of time. We all fear the unknown; even the Greeks created a god, THOR, to be responsible for the thunder and rain. Thunder, by itse

    Jan 1, 1992

  • ISEE
    Field Applications and Quantification of Electronic Detonator Technology

    By Douglas Bartley, Brian Wingfield, Robert McClure

    Recent studies and limited tests indicate favorable results utilizing high accuracy electronic detonator technology over conventional non-electric pyrotechnic systems. This study discusses the applica

    Jan 1, 2001

  • ISEE
    Vibration Control Blasting for Low Stability Final Wall

    By Greg Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Jan 1, 2018

  • ISEE
    Blast Assessment Through Shovel Performance Monitoring

    By Carl Hendricks, Malcolm Scoble

    There currently exists no viable means of obtaining continuous, quantified feedback on blast efficiency. This paper describes the adaptation of a loading shovel to serve as a diagnostic tool in evalua

    Jan 1, 1991