Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Optimizing Drill and Blast Parameters for Enhanced Fragmentation and Cost Efficiency in Open Pit Mines.

    By Shadrack Nuamah, Erik Westman, Bright Afum, Jesse Addy

    Rock fragmentation is the most critical aspect of hard rock production blasting due to its significant impact on drilling and blasting costs and the economics of subsequent loading, hauling, and crush

    Jan 21, 2025

  • ISEE
    Blast movement numerical simulation effective way to monitor ore dilution.

    By Sam Taoum, Omar Riahi

    Few tools allow for accurately tracking ore dilution after blasting. Existing methods often rely on data analysis or linear interpolation of velocity, which can be imprecise and less effective in vari

    Jan 21, 2025

  • ISEE
    Exterior Explosive Model Evaluation for Application in Probabilistic Risk Assessment

    By Natalie Zeleznik, Brian Hawkins, David Bradley, Rachel Gooding, Patrick Wilson, Brian Somes

    "To perform a probabilistic risk assessment (PRA), a method of quantifying the risks associated withinfrequent, high consequence events, consequence models that generate representative estimates of hu

    Jan 1, 2017

  • ISEE
    New Variables for Rock Fragmentation Management

    By Rafael Tadeu Pinto e Moura, Giorgio De Tomi, Jacopo Seccatore

    This paper describes a research and development project in an open-cast mine with the goal to achieve an average P80 of 300 mm (11,8”) in the run-of-mine (ROM) product without altering the existing bu

    Jan 1, 2015

  • ISEE
    Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in Canada

    By Scott King, Norm Patterson, Ruilin Yang

    The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w

    Jan 1, 2018

  • ISEE
    The 8 Millisecond Rule is Dead – Or Is It?

    By Daniel Richards, Dr Rob Farnfield, Dr Geoff Adderley

    The 8-millisecond rule has been in use for many years as a basic technique to help minimize vibration levels from surface blasting operations. The rule was based on work carried out in the 1960’s by t

    Jan 21, 2025

  • ISEE
    A Mine-to-Crusher Framework for Aggregate Operations

    By Diogo Fonseca, José Manuel, Nuno Fernandes, Blessing Taiwo

    This research focuses on enhancing the synergy between blasting and primary crushing operations in quarries. A blast operation at dstgroup aggregate quarry in northern Portugal was simulated to fine-t

    Jan 21, 2025

  • ISEE
    Explosives Cost Reduction and Fragmentation Improvement at Inco's McCreedy West Mine

    By Steven Townend, Don Wadden

    In today's global economy the need to stay competitive is essential for commercial survival and growth. To this end Inco is committed to continuous improvement in its operations. Various aspects of th

    Jan 1, 1994

  • ISEE
    Stope performance optimisation through the introduction of new underground bulk explosives technology

    By S. Evans, J. Phillips-White, D. Morton

    The partnership between Orica and MMG at the Dugald River Zinc mine in Australia has led to the first global field trials and deployment of Orica’s Subtek™ 4D™ (hereafter referred to as 4D) Bulk Syste

    Jan 1, 2024

  • ISEE
    A powder factor build-up model to quantify most common influencing factors at the Serra Sul mine

    By L. Chaves

    In rock blasting, due to numerous factors, both controllable and uncontrollable, the execution rarely meets the planning. The powder factor is an important KPI for blasting since it represents the amo

    Jan 1, 2024

  • ISEE
    The Accuracy of blasting vibration prediction using signature hole and site constant analysis (a case study: Blasting near crusher structure, limestone mining in Indonesia)

    By Jihan Farhan Lubis, Putu Chandra Darmansyah

    Ground vibration caused by blasting has become a common concern, especially when blasting is conducted near buildings or structures. Uncontrolled vibrations can potentially damage nearby infrastructur

    Jan 26, 2026

  • ISEE
    Electronic Initiation Applications at Barrick Goldstrike's Meikle Mine

    By Ray Slavin, Remi Proulx

    The Meikle Mine is a mature underground gold mine utilizing primary and secondary longhole open stoping method with delayed backfill. Combined production with the newly developed Rodeo Mine is 4700 to

    Jan 1, 2004

  • ISEE
    A Lightning Safety Primer for the Explosives Industry

    By Chris Vagasky

    On July 10, 1926, lightning struck at Picatinny Arsenal, New Jersey, and caused the explosion of at least 600,000 pounds (272,000 kilograms) of ammunition, resulting in more than $600 million (2015 do

    Jan 1, 2017

  • ISEE
    Initial Testing of a Speed of Sound Test Apparatus for Powdered Explosives

    By Barbara Rutter, Shonn Kevin McNeil

    "This study discusses how a prototype was built to measure the sonic velocity in powdered explosives.The sonic velocity of an explosive is a benchmark to determine if the explosive deflagrates or deto

    Jan 1, 2017

  • ISEE
    Modeling the Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By Mick Lownds, Ruilin Yang

    The potential advantages of electronic detonators with accurate timing have been increasingly recognized by the blasting community. However, in comparative blasts the results with pyrotechnic timing a

    Jan 1, 2011

  • ISEE
    Innovative Methods of the Use of Explosives and Non-Explosive Demolition Methods in Sensitive Areas; Non-Explosive Demolition Agents to Enhance Profit Margins in Difficult Rock or Concrete Removal Projects

    With the ever increasing problems of narrowing profit margins, and increased liability, a solution/option to SEE members is needed. It is essential that all members understand the benefits of utilizin

    Jan 1, 1995

  • ISEE
    Usability of Expert System Integrated With GIS in Blasting Operations

    By U. Gorkhan Akkaya, N. Enver

    Geographic information system (GIS) is one of the most accurate and useful tools to help decision – making for decision-makers. As to expert systems, it provides solutions to the problems faced by mim

    Jan 1, 2013

  • ISEE
    Geospatial Modelling Methods to Incorporate Subdrill in Powder Factor Calculation and Mine to Mill Analytics

    By Stephen Mansfield

    In open-pit mining operations, the drill and blast processes have a significant impact on the downstream operational performance of crushing and grinding of ores and recovery of metal. The blast patte

    Feb 6, 2023

  • ISEE
    Roadblocks: Increasing Production, Reducing Problems

    By Greg Parker

    "As the Explosives Industry continues to evolve and condense, those involved, such as Blasters,Contractors, Distributors and Consultants, continue to be challenged by both internal and externalforces.

    Jan 1, 1999

  • ISEE
    Influence of Rock Mass Properties on Blast-Induced Rock Movement

    By Behrouz Ohadi, Kamran Esmaeili, Bibhu Mohanty

    In most metalliferrous open pit mines with heterogeneous orebodies, blast-induced rock movement is a crucial outcome that has unfavorable impact on ore and waste segregation in the post-blast muck pil

    Jan 1, 2018