Characterizing Explosives and Blasting Emissions (International Society of Explosives Engineers)By MacDonald B. Johnson, Douglass P. Bacon
"W ith the advance of science, rise of public interest in environmental matters, and continuing erosion of air quality, federal and state regulators are demanding an increasing complex array of data c
Jan 1, 1995
-
Speedwave - A New, Multichannel, High Resolution, High-Speed Blast Monitor for Near and Far Field Monitoring ApplicationsBy Christopher Cloete Uys, Luis Manuel Poinha Valentim
The purpose of this workshop is to describe and demonstrate the use of SPEEDWAVE, a high speed data recorder, its VOD enhancements, and the software which binds the system together. The system was des
Jan 1, 1995
-
Calculating Blasting Effects to Nearby Underground PipelinesBy Janice K. Means
The purpose of this paper is to provide the seminar attendee with: information on pipeline construction, operation and standards to better equip him (or her) to analyze the ultimate effect of blasting
Jan 1, 1992
-
Fire and Explosion of a Mobile Explosive Manufacturing UnitBy Jose a. Sanchidrian, Ramon G. Eguren, Javier L. Amigo
On December 2013 a MEMU exploded at a blasting site in Norway, after burning for more than two hours. This paper describes the analyses made to determine the actual yield of the explosion, the lessons
Jan 1, 2016
-
Application, monitoring, and control of vibrations induced by underground rock blasting using a near-field methodologyBy A. Gontijo, A. Matos, P. Lincoln, L. Fonsecail
This paper investigates how to manage and model the vibrations caused by rock blasting in a Brazilian underground mine. Considering the frequent detonations and the previous lack of effective vibratio
Jan 1, 2024
-
Levee Removal by Explosives, Upper Klamath Lake, OregonBy Quentin Rhoton
To benefit two endangered fish species, waterfowl and other wildlife, and water quality in the lake and downstream, the decision was made to remove levees that had been in place since the 1950s. Becau
Jan 1, 2009
-
Impact of Blasting on Downstream Process to Maximize the Profitability of Mining IndustriesBy Kyle Wagner, William Joa, Colter Angell, Catherine Johnson, Marty Langenderfer, David Doucet
The goal of any business is to seek the maximum profitability for the organization through optimization the use of resources, processes and the application of new technologies. An analysis of various
Jan 1, 2019
-
Impact-Induced Fragmentation of Rock and Size Distribution AnalysisBy Bibhu Mohanty, Sheng Huang
Accurate measure of fragment size distribution is a key objective in all blasting and crushing operations. Several generic distribution functions have been devised to describe the degree of fragmentat
Jan 1, 2016
-
Small Diameter Explosives - Choosing for Underground Blasting ApplicationsBy S J. Brace
About 180 000 tons of explosives are used annually underground in South Africa. Most is loaded into holes less than 50mm in diameter. 75% is consumed in the gold and platinum mines where holes are bet
Jan 1, 1994
-
Evaluating Airblast Damage ComplaintsBy Lawrence W. Gubbe
Air blast associated with detonation of explosives in mining, construction or military applications is often responsible for complaints by people who live or work in the vicinity of the activity. Most
Jan 1, 2004
-
Case Study Using 3-D Blast Modeling to Develop Design for Blasting in Close Proximity to Pit PumpBy Stuart Brashear, Steven Bell, Donald Smith
This Limestone site required the removal of a bench containing high quality rock located in close proximity to sump and pit pump. The sump and associated electrical box were below the bench that neede
Jan 21, 2025
-
Multiple Controls to attenuate damage in Final Pit WallsBy Daniel Vargas Quispe, Yorhinio León Robles, Marco Jauregui Vargas, Helen Espinoza Bailon, Oshin Quispe Luya
This project describes the methodology applied during the execution of tests to determine the multiple controls that mitigate damage to the final walls of the pit. The different tests were executed on
Jan 21, 2025
-
Optimization of Equipment Exclusion Zones in Mining Blasting Processes Through Predictive Analysis and Field ValidationBy Orica Peru, Pedro Lozada
Proper management of exclusion zones in blasting operations is essential to ensure safety without compromising operational efficiency. In Peru, mining regulations establish minimum exclusion distances
Jan 26, 2026
-
Study of Vibrations in Far and Near Field to Determine the Technical Feasibility of Massive Blasting.By Raúl Mondaca Aracena
Mantoverde mine requires increasing its production level to double. EMTS - Projects performs far and near field vibration studies to make changes to the D&B design and sequences, in order to equalize
Feb 1, 2020
-
Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable LayerBy Ye Yuan, Jaak Daemen, Shaguo Yuan
ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre
Jan 1, 2010
-
Integration of Big Data from Drilling and Blasting for Plant Throughput Optimization at Constancia MineBy Hernan Escalante, Jonathan Alvis, Paulo Alcazar
Constancia Mine, operated by Hudbay Perú and located in the district of Velille, Chumbivilcas province, Cusco, is an open-pit operation characterized by low-grade ore. In this context, operational eff
Jan 26, 2026
-
Shock Tube Detonator Shelf Life in Relation to Timing AccuracyBy Joshua Hoffman, Philip Mulligan, Braden Lusk, Tristan Worsey
Blasters rely upon detonators to achieve the designed timing sequence to move material where it needs to go, minimize vibration, or optimize fragmentation. At times detonator inventory on seldom used
Jan 1, 2013
-
Control of Blasting Spillage Through 3D Displacement Modeling in Open-Pit Blasting OperationsBy Hector O. Romero, Paulo C. Fernández A, Christian Rees Prado, Claudio C. Gajardo
In open-pit mining, estimating post blasting displacement and spillage accurately is essential to guarantee operational efficiency, ensure alignment with production plans and their associated key perf
Jan 26, 2026
-
Using a low-density explosive and setting proper blast patterns to prevent Sympathetic Detonation at Itabira Mine in the Quadrilátero Ferrífero region.By Vitor Barcelos, Eduardo Elói, Gabriella Vaz, Davi Oliveira, Leandro Silveira
Following a routine production blast at Vale S.A.'s Itabira Mine in the Quadrilátero Ferrífero region of Minas Gerais, Brazil, nearby residents registered complaints about blast-induced vibrations. An
Jan 21, 2025
-
Density Monitoring of Bulk Emulsion Explosives in Confined BoreholesBy Felipe França Sitonio
Parameter’s control of explosives used in blasting operations have become more relevant over the years, bringing a better understanding of detonation performance. Giving into consideration that bulk e