Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The Fundamentals of a Good Electronic Initiation System Program

    By Thomas Barkley

    Until the recent past, blasters have provided good to excellent results with tools and processes that have an inherent error. These errors can be found in drilling, explosives delivery quality and con

    Jan 1, 2011

  • ISEE
    Understanding Blast Movement and its impacts on Grade Control at Ahafo Gold Mine in Ghana

    By Wayne Rogers, Sarma Kanchibotla, Alan Tordoir, Bryon Bisiauz, Seth Ako, Eric Engmann

    Blast induced rock mass displacement can have a significant impact on ore loss & dilution. The mischaracterization of the grade boundaries both prior to, as well as a result of blasting can lead to si

    Jan 1, 2012

  • ISEE
    A Long Round Test in Conventional Room and Pillar Mining

    By Thomas Barkley

    Mining tradition holds that a parallel round underground can not be any deeper than it’s smallest face dimension. ln other words, a mine using a 12’ (3.7 m) high by 24’ (7.3 m) wide room and pillar mi

    Jan 1, 2000

  • ISEE
    Seismic Modelling Control Of Blasts In A Nuclear Power Plant

    By Alain Blanchier, Pascal Bernasconi

    Blasting operations took place on Channel coast NW of France to extend Flamanville Nuclear Power Plant (EPR new generation). The closest operating reactor building was monitored by a 24 remote vibrati

    Jan 1, 2008

  • ISEE
    Explosive Initiation Practice and its Effect on Energy Release in Commercial Explosives - Part II

    By D K. Joyce, B Mohanty

    In a previous paper, it was shown that a lack of clear understanding of the role of initiation mode on detonation characteristics often leads to under-utilization of the explosive system in blasting.

    Jan 1, 1994

  • ISEE
    Influence of Blast Delay Time on Rock Fragmentation in a 22-FT Bench

    By Mark S. Stagg, Stephen A. Rholl

    The Bureau of Mines is studying blast delay timing influences on rock fragmentation in a series of tests that started in 3-ft concrete blocks, progressed to 45in-bench reduced-scale tests in massive d

    Jan 1, 1988

  • ISEE
    Investigation of Ground Vibration at Gulyali Basalt Mine in Turkey

    By Ali Kahriman, Alper Celtikc, Serdar Celik, Tuncer Gungor

    This paper presents the results of ground vibration measurements carried out in Gülyali Hisarcik Basalt open pit mine located on the north side of the Anatolia near Ordu province in Turkey. Within the

    Jan 1, 2013

  • ISEE
    Blasting on the Iroquois Trail

    By Charles Joyce, William C. Burkle, Dan Murphy

    Rare indeed has a major cross country natural gas pipeline met and surmounted such obstacles as the Iroquois Gas Transmission Line from Canada to Long Island, New York. Of the 370 miles long length a

    Jan 1, 1992

  • ISEE
    Blast Optimisation (Oversize Reduction) at the Astec Bluerock Quarry

    By Andrew Drake, Mark Burchard, Peter Bellairs

    The Astec Bluerock Quarry is excavating an extremely difficult to blast rock type due to its highly variable jointing density that leads to excessive oversize. A drill and blast benchmarking exercise

    Jan 1, 1998

  • ISEE
    Perimteter Control in Development and Breasting by Use of a Blasting Program Readily Accepted by Miners

    By G F. Baur

    Even though the benefits of an effective, perimeter control program in production and development blasting are evident to most everyone involved in the mining industry, there continuer to be only sele

    Jan 1, 1992

  • ISEE
    Insitu Land Blasting The Central Artery/Third Harbor Tunnel Project Boston, Massachusetts

    By Larry Mirabelli, Gerard J. O'Brien

    "The construction of the Third Harbor Tunnel is a key element of the Central Artery TunnelProject. The tunnel is to traverse Boston Harbor directly linking South Boston to EastBoston. The tunnel is a

    Jan 1, 1993

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024

  • ISEE
    Controlled Demolition of a Reinforced Concrete Building in Seoul, Korea

    By Kwang-Tae Kim, Yong-Kun Choi, Jeong-Soo Chong, Yun-Jae Lee

    An annex building at the former Agency for National Security Planning(NSP) complex located in downtown Seoul was demolished by progressive collapse method. This work was done as a part of efforts to r

    Jan 1, 1998

  • ISEE
    Considerations Affecting the Selection and Use of Modern Chemical Explosives

    By Donald J. Westmaas, Fred C. Drury

    The factors affecting the selection and use of exploisves have changed radically in the past three decades. The objective of this paper is to point out considerations which should now be employed by t

    Jan 1, 1978

  • ISEE
    Improved Blast Control Through the Use of Programmable Delay Detonators

    By C Deacon, M Jones, P Duniam

    Electronic blast timing has been in use around the world since the mid-eighties, and, whilst it has yet to be used commercially by large operations on an ongoing basis, significant inroads have been m

    Jan 1, 1997

  • ISEE
    The Changing Economics of Percussion Blast Hole Drilling

    By Henry P. Jr Van Ormer

    During any blast hole operation the first choice to be made is hole size - it seems simple, just calculate all the factors, spacing, burden, depth, rock characteristics, powder factor, etc. and you ha

    Jan 1, 1983

  • ISEE
    Blast Designs and Controls in Steeply Dipping Coal Seams

    By Ricardo Gaviria, Vincinte Acosta

    There are major blast design and field procedures differences between conventional blasting in horizontally bedded coal seams and blasting underneath coal seams in a multi seam deposit with seam incli

    Jan 1, 1995

  • ISEE
    The Journal of Explosives Engineering - Vol 20 No 3 Creating Awareness about Carbon Monoxide - The Silent Hazard

    By Nobel Insurance Service

    [Executive Director’s note: ISEE is committed to continuing its efforts to ensure that blasters be made aware of the issue of migration of carbon monoxide resulting from blasting operations. In the Ju

    Jan 1, 2004

  • ISEE
    Deep water excavation with shaped charges: a case history in Lake Mead, Boulder City, Nevada, USA

    By Roberto Folchi, Hans Wallin

    Lake Mead, the largest man-made reservoir in the United States, is located about 30 miles southeast of Las Vegas, Nevada. For the construction of Lake Mead third water intake, which is entirely placed

    Jan 1, 2012

  • ISEE
    Explosive Initiation Practice and its Effect on Energy Release in Commercial Explosives

    By D K. Joyce, B Mohanty

    "A variety of initiation modes are currently in use. This includes initiation by single ormultiple detonators and boosters, by detonating cords of varying strengths, and bycombinations of cords and bo

    Jan 1, 1993