Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Fundamentals of a Good Electronic Initiation System ProgramBy Thomas Barkley
Until the recent past, blasters have provided good to excellent results with tools and processes that have an inherent error. These errors can be found in drilling, explosives delivery quality and con
Jan 1, 2011
-
Understanding Blast Movement and its impacts on Grade Control at Ahafo Gold Mine in GhanaBy Wayne Rogers, Sarma Kanchibotla, Alan Tordoir, Bryon Bisiauz, Seth Ako, Eric Engmann
Blast induced rock mass displacement can have a significant impact on ore loss & dilution. The mischaracterization of the grade boundaries both prior to, as well as a result of blasting can lead to si
Jan 1, 2012
-
A Long Round Test in Conventional Room and Pillar MiningBy Thomas Barkley
Mining tradition holds that a parallel round underground can not be any deeper than it’s smallest face dimension. ln other words, a mine using a 12’ (3.7 m) high by 24’ (7.3 m) wide room and pillar mi
Jan 1, 2000
-
Seismic Modelling Control Of Blasts In A Nuclear Power PlantBy Alain Blanchier, Pascal Bernasconi
Blasting operations took place on Channel coast NW of France to extend Flamanville Nuclear Power Plant (EPR new generation). The closest operating reactor building was monitored by a 24 remote vibrati
Jan 1, 2008
-
Explosive Initiation Practice and its Effect on Energy Release in Commercial Explosives - Part IIBy D K. Joyce, B Mohanty
In a previous paper, it was shown that a lack of clear understanding of the role of initiation mode on detonation characteristics often leads to under-utilization of the explosive system in blasting.
Jan 1, 1994
-
Influence of Blast Delay Time on Rock Fragmentation in a 22-FT BenchBy Mark S. Stagg, Stephen A. Rholl
The Bureau of Mines is studying blast delay timing influences on rock fragmentation in a series of tests that started in 3-ft concrete blocks, progressed to 45in-bench reduced-scale tests in massive d
Jan 1, 1988
-
Investigation of Ground Vibration at Gulyali Basalt Mine in TurkeyBy Ali Kahriman, Alper Celtikc, Serdar Celik, Tuncer Gungor
This paper presents the results of ground vibration measurements carried out in Gülyali Hisarcik Basalt open pit mine located on the north side of the Anatolia near Ordu province in Turkey. Within the
Jan 1, 2013
-
Blasting on the Iroquois TrailBy Charles Joyce, William C. Burkle, Dan Murphy
Rare indeed has a major cross country natural gas pipeline met and surmounted such obstacles as the Iroquois Gas Transmission Line from Canada to Long Island, New York. Of the 370 miles long length a
Jan 1, 1992
-
Blast Optimisation (Oversize Reduction) at the Astec Bluerock QuarryBy Andrew Drake, Mark Burchard, Peter Bellairs
The Astec Bluerock Quarry is excavating an extremely difficult to blast rock type due to its highly variable jointing density that leads to excessive oversize. A drill and blast benchmarking exercise
Jan 1, 1998
-
Perimteter Control in Development and Breasting by Use of a Blasting Program Readily Accepted by MinersBy G F. Baur
Even though the benefits of an effective, perimeter control program in production and development blasting are evident to most everyone involved in the mining industry, there continuer to be only sele
Jan 1, 1992
-
Insitu Land Blasting The Central Artery/Third Harbor Tunnel Project Boston, MassachusettsBy Larry Mirabelli, Gerard J. O'Brien
"The construction of the Third Harbor Tunnel is a key element of the Central Artery TunnelProject. The tunnel is to traverse Boston Harbor directly linking South Boston to EastBoston. The tunnel is a
Jan 1, 1993
-
Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical SimulationBy A. Vishwakarma, V. Himanshu, K. Dey
Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method
Jan 1, 2024
-
Controlled Demolition of a Reinforced Concrete Building in Seoul, KoreaBy Kwang-Tae Kim, Yong-Kun Choi, Jeong-Soo Chong, Yun-Jae Lee
An annex building at the former Agency for National Security Planning(NSP) complex located in downtown Seoul was demolished by progressive collapse method. This work was done as a part of efforts to r
Jan 1, 1998
-
Considerations Affecting the Selection and Use of Modern Chemical ExplosivesBy Donald J. Westmaas, Fred C. Drury
The factors affecting the selection and use of exploisves have changed radically in the past three decades. The objective of this paper is to point out considerations which should now be employed by t
Jan 1, 1978
-
Improved Blast Control Through the Use of Programmable Delay DetonatorsBy C Deacon, M Jones, P Duniam
Electronic blast timing has been in use around the world since the mid-eighties, and, whilst it has yet to be used commercially by large operations on an ongoing basis, significant inroads have been m
Jan 1, 1997
-
The Changing Economics of Percussion Blast Hole DrillingBy Henry P. Jr Van Ormer
During any blast hole operation the first choice to be made is hole size - it seems simple, just calculate all the factors, spacing, burden, depth, rock characteristics, powder factor, etc. and you ha
Jan 1, 1983
-
Blast Designs and Controls in Steeply Dipping Coal SeamsBy Ricardo Gaviria, Vincinte Acosta
There are major blast design and field procedures differences between conventional blasting in horizontally bedded coal seams and blasting underneath coal seams in a multi seam deposit with seam incli
Jan 1, 1995
-
The Journal of Explosives Engineering - Vol 20 No 3 Creating Awareness about Carbon Monoxide - The Silent HazardBy Nobel Insurance Service
[Executive Director’s note: ISEE is committed to continuing its efforts to ensure that blasters be made aware of the issue of migration of carbon monoxide resulting from blasting operations. In the Ju
Jan 1, 2004
-
Deep water excavation with shaped charges: a case history in Lake Mead, Boulder City, Nevada, USABy Roberto Folchi, Hans Wallin
Lake Mead, the largest man-made reservoir in the United States, is located about 30 miles southeast of Las Vegas, Nevada. For the construction of Lake Mead third water intake, which is entirely placed
Jan 1, 2012
-
Explosive Initiation Practice and its Effect on Energy Release in Commercial ExplosivesBy D K. Joyce, B Mohanty
"A variety of initiation modes are currently in use. This includes initiation by single ormultiple detonators and boosters, by detonating cords of varying strengths, and bycombinations of cords and bo
Jan 1, 1993