Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Full-Face Blast Rounds in Shaft Sinking with Electronic Delay Detonators - a Critical Appraisal

    By B Mohanty

    Full-face blasting rounds have been used to excavate a 4.6-mdiameter shaft at Atomic Energy of Canada Limited's Underground Research Laboratory near Pinawa, Manitoba. Both standard pyrotechnic delay d

    Jan 1, 1990

  • ISEE
    Controlled Blasting for the Construction of an Underground Power House

    By Abraham Lindo

    Panama’s current economical growth demands an increase in electric power supply; projected energy supply for 2012 exceeds the demand by as little as 2%. In an effort to comply with the demand, several

    Jan 1, 2013

  • ISEE
    Development of the Remote Controlled Blasting System for Tunnel Construction

    By Minoru Kawamura, Yukio Kato, Yoshikazu Hirosaki, Satoru Suzuki

    A wireless blasting system for tunnel construction which consists of a loop antenna, oscillator and blaster, has been developed. The basic technology of this method had been studied in the 1970s to de

    Jan 1, 1998

  • ISEE
    Retardation of an Underground Coal Fire in an Industrial Area by Means of Blasting

    By Claude Cunningham

    Late in 1982 a fire began in the shallow, abandoned workings of the Uitkyk Colliery near Witbank, South Africa. Urgent measures had to be taken to quench the fire, before the surface caving it caused

    Jan 1, 1984

  • ISEE
    Technological Research on Production of 10,000 T/Y Multitype Emulsion Explosives in Mongolian Republic

    By Zhang Shixun, Wang Xuguang, Zhong Yinting

    The Mongol-Russian Joint Mining and Processing Cu-Mo Corporation Erdenet signed a contract with BGRIMM for building a plant to produce 10,000 t/y multitype emulsion explosives by using BGRIMM emulsion

    Jan 1, 1997

  • ISEE
    A New Generation of Drilling at the Minntac Mine

    By Don Thompson

    The Minntac Mine drills and blasts approximately 75 million long tons of taconite per year. This requires drilling one million feet of 1 6-inch diameter holes. We are in the process of replacing our o

    Jan 1, 1998

  • ISEE
    Seismic Waves caused by Reinforced Concrete Decks impacting the Ground

    By Andrea Francioso, Roberto Folchi

    In order to comply with the latest European Highway Standards, the highway Salerno - Reggio Calabria, in southern Italy, had do be widened and upgraded to reduce its vulnerability to earthquakes. Rein

    Jan 1, 2013

  • ISEE
    Calorimetric Determination of the Heat of Detonation of Commercial Explosives

    By Q Liu, P D. Katsabanis

    The energy output of crushed AN/FO, crushed AN/FO mixed with Aluminum (5%, 6.4% and 9.4% A1 by mass) and a commercial emulsion explosive has been measured using a detonation calorimeter. The charges h

    Jan 1, 1993

  • ISEE
    Blasting and Monitoring Practices for the MSDGC Deep Tunnel Project

    By Kevin Cole, Dennis A. Clark, F William Laslow

    Since 1976, the Metropolitan Sanitary District of Greater Chicago, (MSDGC), has commissioned the excavation of a tunnel system in the Chicago area, hundreds of feet below the surface in solid limeston

    Jan 1, 1982

  • ISEE
    Pre-Blast Surveys and the Importance of Photographic Technique

    By James Ballard, Charles H. Dowding

    Recent Office of Surface Mining regulations have called for pre-blast surveys of residences within one-half mile of blasting. Unless lighting effects and the multiple origins of cracks are recognized,

    Jan 1, 1979

  • ISEE
    Blast Evaluation at the Minntac Mine

    By Jack Eloranta

    This paper describes a method of evaluating shot performance through the use of available mine- data. The mine had already been monitoring the following parameters for other purposes: drill penetratio

    Jan 1, 1993

  • ISEE
    Electronic Blast Initiation – The Evolving Perception of Australian Mining Operations

    By Greg Wyartt

    Although electronic detonators and blast initiation systems have been commercially available for several decades, uptake in the Australian mining industry has been very slow when compared to other glo

    Jan 1, 2019

  • ISEE
    PPV Management and Frequency Shifting in Soft Ground near Highwalls to Reduce Blast Damage

    By Shawn Kirkpatrick, Yang Ruilin, Tamara Whitaker

    In order to manage blast vibration in soft ground containing large diameter holes and large charge weights, a number of issues must be considered. This paper describes techniques to control and reduce

    Jan 1, 2009

  • ISEE
    Tunneling from an Underground Limestone Mine to the Surface

    By John A. Huber

    At an underground limestone mine in the Central United States; there were plans for the installation of a limestone processing plant. The special design and layout of the plant called for the installa

    Jan 1, 1995

  • ISEE
    Guidelines of Overburden Casting

    Since the ecrly 1970's several factcrs have changed. In the East the larger tracts of coal mined with large eauipment are being dePleted, The cost of moving the larger equipment from small tract to s

    Jan 1, 1989

  • ISEE
    Disposal of Old Munition - Part 1. - A Research Method for the Estimation of Heavy Metal Deposit Range of Open Sur-face Mass Detonations

    By Martti Hagfors, Mervi Hokkanen

    The Finnish Defence Forces has destroyed obsolete and spoiled ammunition in open surface mass detonations at Hukkakero fell, in municipality of Kittilä, in Lapland since 1988. The de-struction method

    Jan 1, 2011

  • ISEE
    Understanding Toxic Fumes from Mining Explosives

    By Michael S. Wieland

    "Toxic fumes cause fatal andnonfatal incidents in underground mining, where the working environment tends to trap the fumes, hindering the restoration of non-harmful conditions. Workers can underestim

    Jan 1, 1997

  • ISEE
    Blasting for the Enhanced Western Groundwater Extraction System - Modern Landfill

    By Jay Smerekanicz, Florin: Pedersen Gheorghiu, Alan Cameron

    In order to expand the capacity of Modern Landtill, a groundwater extraction system consisting of a linear system of pumping wells over 2,700 feet long had to be replaced. The new system would be cove

    Jan 1, 2001

  • ISEE
    Chemically Sensitised Bulk Emulsions and Pump Systems Used in Hong Kong Underground Civil Works

    By Weyman CT Ngain, Brian J. Kennedy

    Innovative chemically sensitised bulk emulsion explosives and pump delivery systems have provided contractors participating in the highly competitive Hong Kong underground construction market with a s

    Jan 1, 1997

  • ISEE
    Investigation to Determine the Origin of Air Overpressure from Quarry Blasting

    By R. Franfield, W. J. Birch, L. Bermingham

    Previous researchers have put forward two different theories as to the origin of air overpressure from quarry blasting. In 1980, Siskind et al postulated that the initial face movement gave rise to th

    Jan 1, 2013